of August 6, 2024 No. 95
About modification of the Decision of Board of the Eurasian economic commission of November 21, 2023 No. 162
According to Item 30 of the Protocol on information and communication technologies and information exchange within the Eurasian Economic Union (appendix № 3 to the Agreement on the Eurasian Economic Union of May 29, 2014) and being guided by the Decision of Board of the Eurasian economic commission of November 6, 2014 № 200, the Board of the Eurasian economic commission decided:
1. Bring in the Decision of Board of the Eurasian economic commission of November 21, 2023 No. 162 "About the technological documents regulating information exchange in case of realization by means of the integrated information system of the Eurasian Economic Union of general process "Ensuring exchange of electronic documents and (or) data between customs authorities of state members of the Eurasian Economic Union in the course of control of transportations of goods according to customs procedure of customs transit" changes according to appendix.
2. This Decision becomes effective after 30 calendar days from the date of its official publication.
Chairman of Board of the Eurasian economic commission
B. Sagintayev
Appendix
to the Decision of Board of the Eurasian economic commission of August 6, 2024 No. 95
1. Rules of information exchange in case of realization by means of the integrated information system of the Eurasian Economic Union of general process "
Ensuring exchange of electronic documents and (or) data between customs authorities of state members of the Eurasian Economic Union in the course of control of transportations of goods according to customs procedure of customs transit", approved by the specified Decision to state in the following edition:"Are approved by the Decision of Board of the Eurasian economic commission of November 21, 2023 No. 162
(in edition of the Decision of Board of the Eurasian economic commission of August 6, 2024 No. 95)
1. These rules are developed according to the following international treaties and acts constituting the right of the Eurasian Economic Union (further – the Union):
The agreement on the Eurasian Economic Union of May 29, 2014;
The customs code of the Eurasian Economic Union (further – the Code);
The agreement on application in the Eurasian Economic Union of navigation seals for tracking of transportations of April 19, 2022;
The decision of Board of the Euroasian economic commission of November 6, 2014 №200 "About the technological documents regulating information exchange in case of realization by means of the integrated information system of foreign and mutual trade of general processes";
The decision of Board of the Eurasian economic commission of January 27, 2015 №5 "About approval of Rules of electronic data exchange in the integrated information system of foreign and mutual trade";
The decision of Board of the Euroasian economic commission of April 14, 2015 № 29 "About the list of general processes within the Eurasian Economic Union and modification of the Decision of Board of the Euroasian economic commission of August 19, 2014 № 132";
The decision of Board of the Euroasian economic commission of June 9, 2015 №63 "About the Analysis technique, optimization, harmonizations and descriptions of general processes within the Eurasian Economic Union";
The decision of Board of the Eurasian economic commission of September 28, 2015 № 125 "About approval of the Regulations on exchange of electronic documents in case of cross-border interaction of public authorities of state members of the Eurasian Economic Union among themselves and with the Eurasian economic commission".
The decision of Board of the Eurasian economic commission of May 2, 2017 No. 43 "About customs declaring of foreign goods, held for use under the organization and holding the FIFA World Cup of FIFA of 2018 and the Cup of confederations of FIFA of 2017, the European Football Championship of UEFA of 2020 or when holding training actions for preparation for them, and modification of the qualifier of features of movement of goods";
The decision of Board of the Eurasian economic commission of December 13, 2017 No. 170 "About some questions of application of customs procedure of customs transit";
The decision of Board of the Eurasian economic commission of December 19, 2017 No. 188 "About some questions connected with release of goods";
The decision of Board of the Eurasian economic commission of October 29, 2019 No. 185 "About approval of Rules of realization of general process "Ensuring exchange of electronic documents and (or) data between customs authorities of state members of the Eurasian Economic Union in the course of control of transportations of goods according to customs procedure of customs transit";
The decision of Board of the Eurasian economic commission of May 30, 2023 No. 73 "About approval of form of the transit declaration and procedure for its filling, and also about change and recognition voided some decisions of the Commission of the Customs union and Board of the Eurasian economic commission";
The decision of Board of the Eurasian economic commission of August 22, 2023 No. 130 "About the Procedure for exchange of information about the measures taken in course of carriage and the forms of control between monitoring bodies of state members of the Eurasian Economic Union concerning the goods (products) transported on the territories of state members using navigation seals";
The decision of Board of the Eurasian economic commission of October 24, 2023 No. 151 "About the certificate of ensuring discharge of duty on payment of customs duties, taxes".
These rules Technologies of information exchange of customs authorities of state members of the Customs union in case of control of transportations of goods according to the customs procedure of customs transit approved by the Decision of the Joint board of Customs Services of state members of the Customs union of June 4, 2015 No. 15/6 are developed taking into account regulations of the Customs convention on international delivery of loads using the book of MDP (Convention MDP) (it is concluded in Geneva on November 14, 1975), and also.
2. These rules are developed for the purpose of determination of procedure and conditions of interstate information exchange between participants of general process "Ensuring exchange of electronic documents and (or) data between customs authorities of state members of the Eurasian Economic Union in the course of control of transportations of goods according to customs procedure of customs transit" (further – general process), including the description of the procedures performed within this general process.
3. These rules are applied by participants of general process in case of control of procedure for performing procedures and transactions within general process, and also during the designing, development and completion of components of the information systems providing realization of general process.
4. For the purposes of these rules concepts which mean the following are used:
"the general certificate" – the certificate of ensuring discharge of duty on payment of customs duties, taxes concerning the goods transported according to several transit declarations;
"the one-time certificate" – the certificate of ensuring discharge of duty on payment of customs duties, taxes concerning the goods transported according to one transit declaration;
"the certificate of providing, the certificate" – the one-time certificate or the general certificate.
The concepts "group of procedures of general process", "information object of general process", "contractor", "transaction of general process", "procedure of general process" and "participant of general process" used in these rules are applied
in the values determined by the Analysis technique, optimizations, the harmonization and the description of general processes within the Eurasian Economic Union approved by the Decision of Board of the Eurasian economic commission of June 9, 2015 No. 63.
5. Full name of general process: "Ensuring exchange of electronic documents and (or) data between customs authorities of state members of the Eurasian Economic Union in the course of control of transportations of goods according to customs procedure of customs transit".
6. Specification symbol of general process: P.CP.01, version 1.1.0.
7. The purpose of general process is ensuring exchange of electronic documents and (or) data between the central customs authorities in case of control of transportation of goods according to customs procedure of customs transit in case of their movement across the territories of 2 and more state members of the Union (further – state members).
8. For goal achievement of general process it is necessary to solve the following problems:
a) provide the automated exchange of the data necessary for monitoring procedure behind transportations of goods according to customs procedure of customs transit, between authorized bodies of state members, including information on the certificate of providing, with use of the technical solutions provided by the integrated system, according to requirements, shown to interaction according to the right of the Union;
b) provide use of the unified structures of the electronic documents and data constructed on the basis of use of general model of data of the Union;
c) provide quick access to information necessary for control and monitoring of transportations of goods according to customs procedure of customs transit, including information on the certificate of providing at the request of customs authorities of state members.
9. The list of participants of general process is provided in table 1.
Table 1
List of participants of general process
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.ACT.001 |
central customs authority of departure |
central customs authority of state member, |
|
P.CP.01.ACT.002 |
central customs authority of appointment |
central customs authority of state member, |
|
P.CP.01.ACT.003 |
central intermediate customs authority |
central customs authority of state member, |
|
P.CP.01.ACT.004 |
the central customs authority making unplanned earlier customs activities |
central customs authority of state member, |
|
P.CP.01.ACT.005 |
the central customs authority informed |
central customs authority of state member, |
|
P.CP.01.ACT.006 |
central customs authority of registration of the certificate |
central customs authority of state member, |
|
P.CP.01.ACT.007 |
central intermediate customs authority of other state member |
the central intermediate customs authority of state member other than the central intermediate customs authority initiating information exchange |
|
P.CP.01.ACT.008 |
the central customs authority in which customs duties and taxes are subject to payment |
central customs authority of state member, |
10. General process represents set of the procedures grouped according to the destination:
a) procedures of submission of data on release of goods according to customs procedure of customs transit (further respectively – procedures of submission of data on release of goods, data on release of goods);
b) procedures of submission of data on completion of action of customs procedure of customs transit;
c) procedures of submission of data on the transactions made during customs procedure of customs transit;
d) procedures of request of data on transportation of goods according to customs procedure of customs transit and submission of data on cancellation of customs procedure of customs transit;
e) procedures of submission of data on the certificate of providing and transfer of the enforced payments.
11. The procedures included in each of groups of procedures are carried out by two or more participants of information exchange. The list of participants of information exchange is brought in the Section VIII of these rules.
Submission of data within performing procedures is performed according to Regulations of information exchange between customs authorities of state members of the Eurasian Economic Union in case of realization by means of the integrated information system of the Eurasian Economic Union of general process "Ensuring exchange of electronic documents and (or) data between customs authorities of state members of the Eurasian Economic Union in the course of control of transportations of goods according to customs procedure of customs transit", the approved Decision of Board of the Eurasian economic commission of November 21, 2023 with No. 162 (further – Regulations of information exchange when implementing transit). The format and structure of the represented data shall match the Description of formats and structures of the electronic documents and data used for realization by means of the integrated information system of the Eurasian Economic Union of general process "Ensuring exchange of electronic documents and (or) data between customs authorities of state members of the Eurasian Economic Union in the course of control of transportations of goods according to customs procedure of customs transit", to No. 162 approved by the Decision of Board of the Eurasian economic commission of November 21, 2023 (dalee-Opisaniye formats and structures of electronic documents and data).
In the these rules of condition of performing procedures and (or) transactions connected with modification or cancellation of data are established concerning earlier directed data according to certain transit declaration.
12. The provided description of structure of general process is provided in the figure 1.
Pic. 1. Structure of general process
13. The procedure for performing procedures of general process, grouped according to the destination, the disaggregated activity description, is given in the Section VIII of these rules.
14. For each group of procedures the general scheme showing bonds between procedures of general process and procedure for their accomplishment is provided. The general scheme of procedures is constructed with use of the graphical notation of UML (unified modeling language – UnifiedModelingLanguage) and supplied with the text description.
15. In structure of group of procedures of submission of data on release of goods (P.CP.01.PGR.001) procedures for submission of data on release of goods (including provision of the specified data on demand enter), and also on modification of the specified data and cancellation of such data:
"Informing on release of goods according to customs procedure of customs transit" (P.CP.01.PRC.001);
"Change of data on release of goods" (P.CP.01.PRC.002);
"Cancellation of data on release of goods (P.CP.01.PRC.003);
"Request of data on release of goods according to customs procedure of customs transit" (P.CP.01.PRC.004).
16. The provided description of group of procedures of submission of data on release of goods is provided in the figure 2.
Fig. 2. General scheme of group of procedures of submission of data on release of goods
17. The list of the procedures of general process entering into group of procedures of submission of data on release of goods is provided
in table 2.
Table 2
The list of the procedures of general process entering into group of procedures of submission of data on release of goods
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.PRC.001 |
informing on release of goods in compliance |
the procedure is intended for representation of departure of data by the central customs authority |
|
P.CP.01.PRC.002 |
change of data on release of goods |
the procedure is intended for representation by the central customs authority of departure of the changed data on release of goods |
|
P.CP.01.PRC.003 |
cancellation of data |
the procedure is intended for representation of departure of information by the central customs authority |
|
P.CP.01.PRC.004 |
request of data on release of goods in compliance |
the procedure is intended for representation of departure of data by the central customs authority |
18. In structure of group of procedures of submission of data on completion of action of customs procedure of customs transit (P.CP.01.PGR.002) procedures of informing on completion of action of customs procedure of customs transit, including, in case of change of delivery location of goods, and also on modification of such data enter:
"Informing on completion of action of customs procedure of customs transit in connection with change of delivery location" (P.CP.01.PRC.005);
"Change of data on completion of action of customs procedure of customs transit in connection with change of delivery location" (P.CP.01.PRC.006);
"Informing on completion of action of customs procedure of customs transit" (P.CP.01.PRC.007);
"Change of data on completion of action of customs procedure of customs transit" (P.CP.01.PRC.008);
"Informing on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union" (P.CP.01.PRC.009);
"Change of data on completion of action of customs procedure of customs transit in case of return of goods of the Union
on customs area of the Union" (P.CP.01.PRC.010).
19. The provided description of group of procedures of submission of data on completion of action of customs procedure of customs transit is provided in the figure 3.
Fig. 3. General scheme of group of procedures of submission of data on completion of action of customs procedure of customs transit
20. The list of the procedures of general process entering into group of procedures of submission of data on completion of action of customs procedure of customs transit is provided in table 3.
Table 3
The list of the procedures of general process entering into group of procedures of submission of data on completion of action of customs procedure of customs transit
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.PRC.005 |
informing on completion of action of customs procedure of customs transit in connection with change of delivery location |
the procedure is intended for representation by the central customs authority making unplanned earlier customs activities, data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
P.CP.01.PRC.006 |
change of data |
the procedure is intended for representation by the central customs authority making unplanned earlier customs activities, the changed data |
|
P.CP.01.PRC.007 |
informing on completion of action of customs procedure of customs transit |
the procedure is intended for representation of purpose of data by the central customs authority |
|
P.CP.01.PRC.008 |
change of data |
the procedure is intended for representation by the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in customs authority of appointment |
|
P.CP.01.PRC.009 |
informing on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union |
the procedure is intended for representation of departure of data by the central customs authority |
|
P.CP.01.PRC.010 |
change of data |
the procedure is intended for representation by the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union |
21. In structure of group of procedures of submission of data on the transactions made during customs procedure of customs transit (P.CP.01.PGR.003), procedures for prolongation of term of customs transit enter; informing on observance or change of route of transportation (transportation) of goods, procedures of informing on making of cargo operations, including unplanned earlier cargo operations, procedures of informing on accident, either force majeure or other circumstances which arose in transit (transportation) of goods, procedures of informing on measures and forms of control when tracking transportations using navigation seals, the procedure of informing on prolongation of date of completion of action of customs procedure of customs transit, and also procedure for modification of such data and their cancellation:
"Informing on prolongation of term of customs transit" (P.CP.01.PRC.011);
"Change of data on prolongation of term of customs transit" (P.CP.01.PRC.012);
"Cancellation of data on prolongation of term of customs transit" (P.CP.01.PRC.013);
"Informing on change of route of transportation (transportation) of goods" (P.CP.01.PRC.014);
"Change of data on change of route of transportation (transportation) of goods" (P.CP.01.PRC.015);
"Cancellation of data on change of route of transportation (transportation) of goods" (P.CP.01.PRC.016);
"Informing on observance of route of transportation (transportation) of goods" (P.CP.01.PRC.017);
"Change of data on observance of route of transportation (transportation) of goods" (P.CP.01.PRC.018);
"Cancellation of data on observance of route of transportation (transportation) of goods" (P.CP.01.PRC.019);
"Informing on making of the planned cargo operations" (P.CP.01.PRC.020);
"Change of data on making of the planned cargo operations" (P.CP.01.PRC.021);
"Cancellation of data on making of the planned cargo operations" (P.CP.01.PRC.022);
"Informing on making of unplanned cargo operations" (P.CP.01.PRC.023);
"Change of data on making of unplanned cargo operations" (P.CP.01.PRC.024);
"Cancellation of data on making of unplanned cargo operations" (P.CP.01.PRC.025);
"Informing on accident, force majeure or other circumstances which arose in transit goods" (P.CP.01.PRC.026);
"Change of data on accident, force majeure or other circumstances which arose in transit goods" (P.CP.01.PRC.027);
"Cancellation of data on accident, force majeure or other circumstances which arose in transit goods" (P.CP.01.PRC.028);
"Informing on prolongation of term of registration of completion of action of customs procedure of customs transit" (P.CP.01.PRC.029);
"Change of data on prolongation of term of registration of completion of action of customs procedure of customs transit" (P.CP.01.PRC.030);
"Cancellation of data on prolongation of term of registration of completion of action of customs procedure of customs transit" (P.CP.01.PRC.031);
"Informing on measures and forms of control when tracking transportations using navigation seals" (P.CP.01.PRC.046);
"Change of data on measures and forms of control when tracking transportations using navigation seals" (P.CP.01.PRC.047).
22. The provided description of group of procedures of submission of data on the transactions made during customs procedure of customs transit is provided in the figure 4.
Fig. 4. The general scheme of group of procedures of submission of data on the transactions made during customs procedure of customs transit (part 1)
Fig. 4. The general scheme of group of procedures of submission of data on the transactions made during customs procedure of customs transit (part 2)
Fig. 4. The general scheme of group of procedures of submission of data on the transactions made during customs procedure of customs transit (part 3)
Fig. 4. The general scheme of group of procedures of submission of data on the transactions made during customs procedure of customs transit (part 4)
Fig. 4. The general scheme of group of procedures of submission of data on the transactions made during customs procedure of customs transit (part 5)
23. The list of the procedures of general process entering into group of procedures of submission of data on the transactions made during customs procedure of customs transit is provided in table 4.
Table 4
The list of the procedures of general process entering into group of procedures of submission of data on the transactions made during customs procedure of customs transit
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.PRC.011 |
informing on prolongation of term of customs transit |
the procedure is intended for representation by the central customs authority making unplanned earlier customs activities, data on prolongation of term of customs transit |
|
P.CP.01.PRC.012 |
change of data |
the procedure is intended for representation by the central customs authority making unplanned earlier customs activities, the changed data |
|
P.CP.01.PRC.013 |
cancellation of data |
the procedure is intended for representation by the central customs authority making unplanned earlier customs activities, information on cancellation of data on prolongation of term of customs transit |
|
P.CP.01.PRC.014 |
informing on change of route of transportation (transportation) of goods |
the procedure is intended for representation by the central customs authority making unplanned earlier customs activities of data on change of route of transportation (transportation) of goods |
|
P.CP.01.PRC.015 |
change of data on change of route of transportation (transportation) of goods |
the procedure is intended for representation by the central customs authority making unplanned earlier customs activities, the changed data on change of route of transportation (transportation) of goods |
|
P.CP.01.PRC.016 |
cancellation of data on change of route of transportation (transportation) of goods |
the procedure is intended for representation by the central customs authority making unplanned earlier customs activities, information on cancellation of data on change of route of transportation (transportation) of goods |
|
P.CP.01.PRC.017 |
informing |
the procedure is intended for submission of data by the central intermediate customs authority |
|
P.CP.01.PRC.018 |
change of data |
the procedure is intended for representation by the central intermediate customs authority of the changed data on observance of route of transportation (transportation) of goods |
|
P.CP.01.PRC.019 |
cancellation of data |
the procedure is intended for submission by the central intermediate customs authority of information on cancellation of data on observance of route of transportation (transportation) of goods |
|
P.CP.01.PRC.020 |
informing on making of the planned cargo operations |
the procedure is intended for submission of data by the central intermediate customs authority |
|
P.CP.01.PRC.021 |
change of data |
the procedure is intended for representation by the central intermediate customs authority of the changed data on making of the planned cargo operations |
|
P.CP.01.PRC.022 |
cancellation of data |
the procedure is intended for submission by the central intermediate customs authority of information on cancellation of data |
|
P.CP.01.PRC.023 |
informing on making of unplanned cargo operations |
the procedure is intended for representation by the central customs authority, making unplanned earlier customs activities, data on making of unplanned cargo operations |
|
P.CP.01.PRC.024 |
change of data |
the procedure is intended for representation by the central customs authority, making unplanned earlier customs activities, the changed data |
|
P.CP.01.PRC.025 |
cancellation of data |
the procedure is intended for representation by the central customs authority, making unplanned earlier customs activities, information on cancellation of data on making of unplanned cargo operations |
|
P.CP.01.PRC.026 |
informing on accident, force majeure or other circumstances which arose in transit goods |
the procedure is intended for representation by the central customs authority, making unplanned earlier customs activities of data on accident, force majeure or other circumstances which arose in transit (transportation) of goods |
|
P.CP.01.PRC.027 |
change of data on accident, force majeure or other circumstances which arose in transit goods |
the procedure is intended for representation by the central customs authority, making unplanned earlier customs activities, the changed data on accident, force majeure or other circumstances which arose in transit (transportation) of goods |
|
P.CP.01.PRC.028 |
cancellation of data on accident, force majeure or other circumstances which arose in transit goods |
the procedure is intended for representation by the central customs authority, making unplanned earlier customs activities, information on cancellation of data on accident, force majeure or other circumstances which arose in transit (transportation) of goods |
|
P.CP.01.PRC.029 |
informing on prolongation of term of registration of completion of action of customs procedure of customs transit |
the procedure is intended for representation of purpose of data by the central customs authority |
|
P.CP.01.PRC.030 |
change of data |
the procedure is intended for representation by the central customs authority of purpose of the changed data on prolongation of term of registration of completion of action of customs procedure of customs transit |
|
P.CP.01.PRC.031 |
cancellation of data |
the procedure is intended for representation by the central customs authority of purpose of information on cancellation of data |
|
P.CP.01.PRC.046 |
informing on measures |
the procedure is intended for representation by the central customs authority, making unplanned earlier customs activities, data on forms and measures of the carried-out control |
|
P.CP.01.PRC.047 |
change of data on measures |
the procedure is intended for representation by the central customs authority, making unplanned earlier customs activities, the changed data |
24. In structure of group of procedures of request of data on transportation of goods according to customs procedure of customs transit and submission of data on cancellation of customs procedure of customs transit (P.CP.01.PGR.004) procedures of request of data on completion of action of customs procedure of customs transit, request of data on transit transportation, request of data on the location of goods, the procedure of informing on cancellation of customs procedure of customs transit, including the procedure of modification of data on cancellation of customs procedure of customs transit enter:
"Request of data on completion of action of customs procedure of customs transit" (P.CP.01.PRC.032);
"Request of data on completion of action of customs procedure of customs transit, passing of goods or making of cargo operations" (P.CP.01.PRC.033);
"Information request about the location of goods" (P.CP.01.PRC.034);
"Informing on cancellation of customs procedure of customs transit" (P.CP.01.PRC.035);
"Change of data on cancellation of customs procedure of customs transit" (P.CP.01.PRC.036).
25. The provided description of group of procedures of request of data on transportation of goods according to customs procedure of customs transit and submission of data on cancellation of customs procedure of customs transit is provided in the figure 5.
Fig. 5. The general scheme of group of procedures of request of data on transportation of goods according to customs procedure of customs transit and submission of data on cancellation of customs procedure of customs transit
26. The list of the procedures of general process entering into group of procedures of request of data on transportation of goods in compliance
with customs procedure of customs transit and submission of data on cancellation of customs procedure of customs transit, it is provided in table 5.
Table 5
The list of the procedures of general process entering into group of procedures of request of data on transportation of goods according to customs procedure of customs transit and submission of data on cancellation of customs procedure of customs transit
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.PRC.032 |
request of data on completion of action of customs procedure of customs transit |
it is intended for representation of purpose of data by the central customs authority |
|
P.CP.01.PRC.033 |
request of data on completion of action of customs procedure of customs transit, passing of goods or making of cargo operations |
it is intended for submission by the central intermediate body of data on completion of action of customs procedure of customs transit or making of other customs transactions on demand |
|
P.CP.01.PRC.034 |
information request about the location of goods |
it is intended for representation of appointment by the central customs authority and central intermediate customs authority of information by results of establishment of the location of goods on demand |
|
P.CP.01.PRC.035 |
informing |
the procedure is intended for representation of departure of data by the central customs authority |
|
P.CP.01.PRC.036 |
change of data |
the procedure is intended for representation by the central customs authority of departure of the changed data on cancellation of customs procedure of customs transit |
27. In structure of group of procedures of submission of data on the certificate of providing and transfer of the enforced payments (P.CP.01.PGR.005) procedures of informing on registration, registration cancellation, acceptance, acceptance cancellation, cancellation of the certificate of providing, the procedure of request of data on the certificate, and also the procedure of informing on transfer of the collected customs duties, taxes and other payments enter:
"Informing on registration of the certificate of providing" (P.CP.01.PRC.037);
"Request of data on adoption of the certificate of providing" (P.CP.01.PRC.038);
"Cancellation of registration of the certificate of providing" (P.CP.01.PRC.039);
"Request of data on registration of the certificate of providing" (P.CP.01.PRC.040);
Informing on adoption of the certificate of providing" (P.CP.01.PRC.041);
"Cancellation of adoption of the certificate of providing" (P.CP.01.PRC.042);
"Informing on cancellation (repayment) of the certificate of providing" (P.CP.01.PRC.043);
"Informing on transfer of the collected amounts of customs and other payments" (P.CP.01.PRC.044);
"Request about possibility of use of providing according to the transit declaration" (P.CP.01.PRC.045).
28. The provided description of group of procedures of submission of data on the certificate of providing and transfer of the enforced payments is provided in the figure 6.
Fig. 6. The general scheme of group of procedures of submission of data on the certificate of providing and transfer of the enforced payments
29. The list of the procedures of general process entering into group of procedures of submission of data on the certificate of providing
and transfer of the enforced payments, it is provided in table 6.
Table 6
The list of the procedures of general process entering into group of procedures of submission of data on the certificate of providing and transfer of the enforced payments
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.PRC.037 |
informing |
the procedure is intended for representation by the central customs authority of registration of the certificate of data on registration of the certificate of providing |
|
P.CP.01.PRC.038 |
request of data on adoption of the certificate of providing |
it is intended for representation central customs body of departure of data |
|
P.CP.01.PRC.039 |
cancellation of registration of the certificate of providing |
the procedure is intended for representation by the central customs authority of registration of the certificate of data on cancellation of registration of the certificate of providing |
|
P.CP.01.PRC.040 |
request of data on registration of the certificate of providing |
it is intended for representation by the central customs authority of registration of the certificate of data on registration of the certificate of providing on demand |
|
P.CP.01.PRC.041 |
informing on adoption of the certificate of providing |
the procedure is intended for representation of departure of data by the central customs authority adoption of the certificate of providing |
|
P.CP.01.PRC.042 |
informing on cancellation of adoption of the certificate of providing |
the procedure is intended for representation by the central customs authority of departure of data on cancellation of adoption of the certificate of providing |
|
P.CP.01.PRC.043 |
informing |
the procedure is intended for representation of registration of the certificate of data by the central customs authority cancellation (repayment) of the certificate of providing |
|
P.CP.01.PRC.044 |
informing |
the procedure is intended for idea of registration of the certificate of data by the central customs authority of the transferred amounts of the customs and other payments enforced due to the provided providing |
|
P.CP.01.PRC.045 |
request about possibility of use of providing |
the procedure is intended for representation by the central customs authority of registration of the certificate of data on opportunity or impossibility of use of providing, when using the general certificate |
30. The list of information objects, data on which or from which are transferred in process of information exchange between participants of general process are provided in table 7.
Table 7
List of information objects
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.BEN.001 |
data on transit transportation |
set of data |
|
P.CP.01.BEN.002 |
data on the certificate of providing |
data on the certificate of providing, including data on transactions, committed |
31. Attraction to disciplinary responsibility for non-compliance with the requirements aimed at providing timeliness and completeness of submission of the data participating in information exchange of officials and staff of authorized bodies of state members is performed according to the legislation of state members.
32. The list of reference books and qualifiers of general process is provided in table 8.
Table 8
List of reference books and qualifiers of general process
|
Specification symbol |
Name |
Type |
Description |
|
1 |
2 |
3 |
4 |
|
P.CLS.001 |
qualifier of the countries of the world |
classifier |
contains list of names of the countries and codes corresponding to them (it is applied |
|
P.CLS.002 |
classification of currencies |
classifier |
contains list of codes and names of currencies (it is applied |
|
P.CLS.003 |
single Commodity nomenclature of foreign economic activity of the Eurasian Economic Union (CN FEA EEU) |
classifier |
contains list of codes |
|
P.CLS.008 |
list of types of means (channels) of communication |
reference book |
contains list of codes |
|
P.CLS.014 |
qualifier of document types |
classifier |
contains list of codes |
|
P.CLS.015 |
qualifier of modes of transport |
classifier |
contains list of types of vehicles |
|
P.CLS.018 |
qualifier of types of cargo, packagings |
classifier |
contains list of codes |
|
P.CLS.023 |
qualifier of units of measure |
classifier |
contains list of codes |
|
P.CLS.024 |
qualifier of languages |
classifier |
contains list of names of languages and their codes |
|
P.CLS.025 |
qualifier of customs authorities of state members |
classifier |
contains list of names of customs authorities of state members |
|
P.CLS.048 |
reference book of types of addresses |
reference book |
contains list of codes |
|
P.CLS.051 |
the qualifier of the document types proving the identity |
classifier |
contains list of codes |
|
P.CLS.054 |
qualifier of forms of business |
classifier |
contains list of codes and names of forms of business (it is applied |
|
P.CLS.066 |
qualifier of types of customs procedures |
classifier |
contains list of codes |
|
P.CLS.073 |
qualifier of brands of road vehicles |
classifier |
contains list of codes |
|
P.CLS.074 |
qualifier of types of tax, charges |
classifier |
contains list of codes |
|
P.CLS.075 |
the qualifier of types of movement of goods in compliance |
classifier |
contains list of codes |
|
P.CLS.082 |
qualifier of features of customs declaration of goods |
classifier |
contains list of codes |
|
P.CLS.086 |
the qualifier of methods of ensuring discharge of duty on payment of customs duties, taxes |
classifier |
contains list of codes and names of methods of ensuring discharge of duty on payment of customs duties, taxes (it is applied in compliance |
|
P.CLS.CP.01.003 |
the reference book of types of clauses in case of completion of action of customs procedure of customs transit |
reference book |
contains list of codes |
|
P.CLS.CP.01.004 |
the qualifier of cases of failure to provide ensuring discharge of duty on payment customs duties, taxes, special, anti-dumping, compensatory duties |
classifier |
contains list of codes |
|
P.CLS.CP.01.005 |
reference book of technological |
reference book |
contains list of codes |
|
P.CLS.CP.01.007 |
qualifier of types of vehicles |
classifier |
contains list of codes and names of types of vehicles (it is applied in compliance |
|
P.CLS.CP.01.009 |
qualifier of types of means of customs identification |
classifier |
it is intended for systematization |
|
P.CLS.CP.01.010 |
reference book of technological |
reference book |
contains list of codes |
|
P.CLS.CP.01.011 |
the reference book of the decisions of customs authority made when making technological |
reference book |
contains list of codes |
|
P.CLS.CP.01.013 |
reference book of the reasons of impossibility of provision of information or use of the certificate of providing |
reference book |
contains list of codes |
"Informing on Release of Goods according to Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.001)
33. The scheme of accomplishment of the "Informing on Release of Goods according to Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.001) is provided in the figure 7.
Fig. 7. Scheme of accomplishment of the "Informing on Release of Goods according to Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.001)
34. The "Informing on Release of Goods according to Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.001) is performed in case of release of goods according to customs procedure of customs transit. After fixing in information system of the central customs authority of departure of data
about release of goods according to customs procedure of customs transit, the central customs authority of opravleniye represents the specified data to the central customs authorities of other state members. The list of participants of information exchange in case of accomplishment of the procedure "Informing
about release of goods according to customs procedure of customs transit" (P.CP.01.PRC.001) is determined by conditions of accomplishment of separate transactions of the procedure of general process.
35. The first carries out transaction "Submission to the central customs authority of purpose of data on release of goods" (P.CP.01.OPR.001) by results of which accomplishment the central customs authority of departure creates and represents to the central customs authority of purpose of the data on release of goods.
36. When obtaining by the central customs authority of purpose of data on release of goods transaction "Acceptance and processing in the central customs authority of purpose of data on release of goods" is carried out (P.CP.01.OPR.002) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of data on release of goods goes to the central customs authority of departure.
37. When obtaining by the central customs authority of departure of the notification on processing of data on release of goods transaction "Receipt of the notification on processing in the central customs authority of purpose of data on release of goods" is carried out (P.CP.01.OPR.003) by results of which accomplishment acceptance and processing of the specified notification are performed.
38. Transaction "Submission to the central intermediate customs authority of data on release of goods" (P.CP.01.OPR.004) is carried out provided that data on release of goods contain information on customs authorities in which confirmation of observance of the established transportation route is planned, and (or) on customs authorities in which implementation of cargo operations is planned, and the specified customs authorities are out of the region (zone) of activities of the central customs authority of departure. By results of transaction accomplishment the central customs authority of departure creates and represents to the central intermediate customs authority, data on release of goods. Transaction "Submission to the central intermediate customs authority of data on release of goods" (P.CP.01.OPR.004) is carried out for each central intermediate customs authority meeting transaction accomplishment condition.
39. In case of receipt by the central intermediate customs authority of data on release of goods transaction "Acceptance and processing in the central intermediate customs authority of data on release of goods" is carried out (P.CP.01.OPR.005) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of data on release of goods goes to the central customs authority of departure.
40. When obtaining by the central customs authority of departure of the notification on processing of data on release of goods transaction "Receipt of the notification on processing in the central intermediate customs authority of data on release of goods" is carried out (P.CP.01.OPR.006) by results of which accomplishment acceptance and processing of the specified notification are performed.
41. Transaction "Submission to the central customs authority informed on transportation of goods of data on release of goods" (P.CP.01.OPR.007) is carried out provided that goods according to customs procedure of customs transit are transported in the region (zone) of activities of the central customs authority informed on transportation of goods.
By results of transaction accomplishment the central customs authority of departure creates and represents to the central customs authority informed on transportation of goods, data on release of goods. Transaction "Submission to the central customs authority informed on transportation of goods of data on release of goods" (P.CP.01.OPR.007) is carried out for each central customs authority informed on transportation of goods, meeting condition of transaction accomplishment.
42. When obtaining by the central customs authority informed on transportation of goods, data on release of goods transaction "Acceptance and processing in the central customs authority informed on transportation of goods, data on release of goods" is carried out (P.CP.01.OPR.008) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of data on release of goods goes to the central customs authority of departure.
43. When obtaining by the central customs authority of departure of the notification on processing of data on release of goods transaction "Receipt of the notification on processing in the central customs authority informed on transportation of goods of data on release of goods" is carried out (P.CP.01.OPR.009) by results of which accomplishment acceptance and processing of the specified notification are performed.
44. Result of accomplishment of the "Informing on Release of Goods according to Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.001) is processing of data on release of goods in all central customs authorities of state members to which data on release of goods are provided.
45. The list of the transactions of general process which are carried out within the procedure "Informing on release of goods in compliance
with customs procedure of customs transit" (P.CP.01.PRC.001), is given in table 9.
Table 9
The list of the transactions of general process which are carried out within the procedure "Informing on release of goods according to customs procedure of customs transit" (P.CP.01.PRC.001)
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.OPR.001 |
submission to the central customs authority of purpose of data on release of goods |
it is provided in table 10 of these rules |
|
P.CP.01.OPR.002 |
acceptance and processing in the central customs authority of purpose of data on release of goods |
it is provided in table 11 of these rules |
|
P.CP.01.OPR.003 |
receipt of the notification on processing in the central customs authority of purpose of data on release of goods |
it is provided in table 12 of these rules |
|
P.CP.01.OPR.004 |
submission to the central intermediate customs authority of data on release of goods |
it is provided in table 13 of these rules |
|
P.CP.01.OPR.005 |
acceptance and processing in the central intermediate customs authority of data on release of goods |
it is provided in table 14 of these rules |
|
P.CP.01.OPR.006 |
receipt of the notification on processing in the central intermediate customs authority of data on release of goods |
it is provided in table 15 of these rules |
|
P.CP.01.OPR.007 |
submission to the central customs authority informed on transportation of goods, data |
it is provided in table 16 of these rules |
|
P.CP.01.OPR.008 |
acceptance and processing in the central customs authority informed on transportation of goods, data on release of goods |
it is provided in table 17 of these rules |
|
P.CP.01.OPR.009 |
receipt of the notification on processing in the central customs authority informed on transportation of goods of data on release of goods |
it is provided in table 18 of these rules |
Table 10
Activity description "Submission to the Central Customs Authority of Purpose of Data on Release of Goods" (P.CP.01.OPR.001)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.001 |
|
2 |
Name of transaction |
submission to the central customs authority of purpose of data on release of goods |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of data on release of goods |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor creates and represents data |
|
7 |
Results |
data on release of goods are provided |
Table 11
Activity description "Acceptance and Processing in the Central Customs Authority of Purpose of Data on Release of Goods" (P.CP.01.OPR.002)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.002 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of purpose of data on release of goods |
|
3 |
Contractor |
central customs authority of appointment |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt of data by the contractor |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of data on release of goods, creates and sends the notification on processing of data on release of goods to the central customs authority of departure |
|
7 |
Results |
data on release of goods it is processed, the notification on processing of data on release of goods is sent to the central customs authority of departure |
Table 12
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Purpose of Data on Release of Goods" (P.CP.01.OPR.003)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.003 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of purpose of data on release of goods |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out when obtaining by the contractor from the central customs authority of purpose of the notification on processing of data on release of goods (transaction "Acceptance and processing in the central customs authority of purpose of data on release of goods" (P.CP.01.OPR.002)) |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of data on release of goods according to Regulations of information exchange when implementing transit |
|
7 |
Results |
the notification on processing of data on release of goods is processed |
Table 13
Activity description "Submission to the Central Intermediate Customs Authority of Data on Release of Goods" (P.CP.01.OPR.004)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.004 |
|
2 |
Name of transaction |
submission to the central intermediate customs authority of data on release of goods |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of data on release of goods |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor creates and represents data |
|
7 |
Results |
data on release of goods are provided |
Table 14
Activity description "Acceptance and Processing in the Central Intermediate Customs Authority of Data on Release of Goods" (P.CP.01.OPR.005)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.005 |
|
2 |
Name of transaction |
acceptance and processing in the central intermediate customs authority of data on release of goods |
|
3 |
Contractor |
central intermediate customs authority |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt of data by the contractor |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of data on release of goods, creates and sends the notification on processing of data on release of goods to the central customs authority of departure |
|
7 |
Results |
data on release of goods are processed, the notification on processing of data on release of goods is sent to the central customs authority of departure |
Table 15
Activity description "Receipt of the Notification on Processing in the Central Intermediate Customs Authority of Data on Release of Goods" (P.CP.01.OPR.006)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.006 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central intermediate customs authority of data |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of data on release of goods (transaction "Acceptance and processing in the central intermediate customs authority of data |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of data on release of goods according to Regulations of information exchange when implementing transit |
|
7 |
Results |
the notification on processing of data on release of goods is processed |
Table 16
Activity description "Submission to the Central Customs Authority Informed on Transportation of Goods, Data on Release of Goods" (P.CP.01.OPR.007)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.007 |
|
2 |
Name of transaction |
submission to the central customs authority informed on transportation of goods, data |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of information on release of goods according to customs procedure of customs transit provided that goods are transported in the region (zone) of activities of the central customs authority informed on transportation of goods |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor creates and represents data |
|
7 |
Results |
data on release of goods are provided |
Table 17
Activity description "Acceptance and Processing in the Central Customs Authority Informed on Transportation of Goods, Data on Release of Goods" (P.CP.01.OPR.008)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.008 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority informed on transportation of goods, data on release of goods |
|
3 |
Contractor |
the central customs authority informed |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt of data by the contractor |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of data on release of goods, creates and sends the notification on processing of data on release of goods to the central customs authority of departure |
|
7 |
Results |
data on release of goods are processed, the notification on processing of data on release, is directed |
Table 18
Activity description "Receipt of the Notification on Processing in the Central Customs Authority Informed on Transportation of Goods of Data on Release of Goods" (P.CP.01.OPR.009)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.009 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority informed on transportation of goods of data on release of goods |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing in the central customs authority informed on transportation of goods, data on release of goods (transaction "Acceptance and processing in the central customs authority informed on transportation of goods, data on release of goods" (P.CP.01.OPR.008)) |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of data on release of goods according to Regulations of information exchange when implementing transit |
|
7 |
Results |
the notification on processing of data on release of goods is processed |
"Change of Data on Release of Goods" procedure (P.CP.01.PRC.002)
46. The scheme of accomplishment of the "Change of Data on Release of Goods" procedure (P.CP.01.PRC.002) is provided in the figure 8.
Fig. 8. Scheme of accomplishment of the "Change of Data on Release of Goods" procedure (P.CP.01.PRC.002)
47. The "Change of Data on Release of Goods" procedure (P.CP.01.PRC.002) is performed by the central customs authority of departure after modification of data on release of goods according to customs procedure of customs transit provided that the "Informing on Release of Goods according to Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.001) is executed successfully. In case of accomplishment of the "Change of Data on Release of Goods" procedure (P.CP.01.PRC.002) the central customs authority of departure represents the changed data on release of goods to the central customs authorities to which data on release of goods in case of accomplishment of the "Informing on Release of Goods according to Customs Procedure of Customs Transit" procedure are provided (P.CP.01.PRC.001).
48. The first carries out transaction "Submission to the central customs authority of purpose of the changed data on release of goods" (P.CP.01.OPR.010) by results of which accomplishment the central customs authority of departure creates and represents the changed data on release of goods to the central customs authority of appointment.
49. When obtaining by the central customs authority of purpose of the changed data on release of goods transaction "Acceptance and processing in the central customs authority of purpose of the changed data on release of goods" is carried out (P.CP.01.OPR.011) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of the changed data on release of goods goes to the central customs authority of departure.
50. When obtaining by the central customs authority of departure of the notification on processing of the changed data on release of goods transaction "Receipt of the notification on processing in the central customs authority of purpose of the changed data on release of goods" is carried out (P.CP.01.OPR.012) by results of which accomplishment acceptance and processing of the specified notification are performed.
51. Transaction "Submission to the central intermediate customs authority of the changed data on release of goods" (P.CP.01.OPR.013) is carried out provided that data on release of goods are provided to the central intermediate customs authority. By results of transaction accomplishment the central customs authority of departure creates and represents the changed data on release of goods to the central intermediate customs authority. Transaction "Submission to the central intermediate customs authority of the changed data on release of goods" (P.CP.01.OPR.013) is carried out for each central intermediate customs authority meeting transaction accomplishment condition.
52. When obtaining by the central intermediate customs authority of the changed data on release of goods transaction "Acceptance and processing in the central intermediate customs authority of the changed data on release of goods" is carried out (P.CP.01.OPR.014) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of the changed data on release of goods goes to the central customs authority of departure.
53. When obtaining by the central customs authority of departure of the notification on processing of the changed data on release of goods, transaction "Receipt of the notification on processing in the central intermediate customs authority of the changed data on release of goods" is carried out (P.CP.01.OPR.015) by results of which accomplishment acceptance and processing of the specified notification are performed.
54. Transaction "Submission to the central customs authority informed on transportation of goods, the changed data on release of goods" (P.CP.01.OPR.016) is carried out provided that data on release of goods are provided to the central customs authority informed on transportation of goods. By results of transaction accomplishment the central customs authority of departure creates and represents to the central customs authority informed on transportation of goods, the changed data on release of goods. Transaction "Submission to the central customs authority informed on transportation of goods, the changed data on release of goods" (P.CP.01.OPR.016) is carried out for each central customs authority informed on transportation of goods, meeting condition of transaction accomplishment.
55. When obtaining by the central customs authority informed on transportation of goods, the changed data on release of goods transaction "Acceptance and processing in the central customs authority informed on transportation of goods, the changed data on release of goods" is carried out (P.CP.01.OPR.017) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of the changed data on release of goods goes to the central customs authority of departure.
56. When obtaining by the central customs authority of departure of the notification on processing of the changed data on release of goods transaction "Receipt of the notification on processing in the central customs authority informed on transportation of goods, the changed data on release of goods" is carried out (P.CP.01.OPR.018) by results of which accomplishment acceptance and processing of the specified notification are performed.
57. Result of accomplishment of the "Change of Data on Release of Goods" procedure (P.CP.01.PRC.002) is processing of the changed data on release of goods by all central customs authorities to which the specified data are provided.
58. The list of the transactions of general process which are carried out within the "Change of Data on Release of Goods" procedure (P.CP.01.PRC.002), is given in table 19.
Table 19
The list of the transactions of general process which are carried out within the procedure "Change of data on release of goods" (P.CP.01.PRC.002)
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.OPR.010 |
submission to the central customs authority of purpose of the changed data on release of goods |
it is provided in table 20 of these rules |
|
P.CP.01.OPR.011 |
acceptance and processing in the central customs authority of purpose of the changed data on release of goods |
it is provided in table 21 of these rules |
|
P.CP.01.OPR.012 |
receipt of the notification on processing in the central customs authority of purpose of the changed data on release of goods |
it is provided in table 22 of these rules |
|
P.CP.01.OPR.013 |
submission to the central intermediate customs authority of the changed data on release of goods |
it is provided in table 23 of these rules |
|
P.CP.01.OPR.014 |
acceptance and processing in the central intermediate customs authority of the changed data on release of goods |
it is provided in table 24 of these rules |
|
P.CP.01.OPR.015 |
receipt of the notification on processing in the central intermediate customs authority of the changed data on release of goods |
it is provided in table 25 of these rules |
|
P.CP.01.OPR.016 |
submission to the central customs authority informed on transportation of goods, the changed data on release of goods |
it is provided in table 26 of these rules |
|
P.CP.01.OPR.017 |
acceptance and processing in the central customs authority informed on transportation of goods, the changed data |
it is provided in table 27 of these rules |
|
P.CP.01.OPR.018 |
receipt of the notification on processing in the central customs authority informed on transportation of goods, the changed data |
it is provided in table 28 of these rules |
Table 20
Activity description "Submission to the Central Customs Authority of Purpose of the Changed Data on Release of Goods" (P.CP.01.OPR.010)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.010 |
|
2 |
Name of transaction |
submission to the central customs authority of purpose of the changed data on release of goods |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of the changed data on release of goods |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor creates and represents the changed data on release of goods to the central customs authority of appointment in compliance |
|
7 |
Results |
the changed data on release of goods are provided to the central customs authority of appointment |
Table 21
Activity description "Acceptance and Processing in the Central Customs Authority of Purpose of the Changed Data on Release of Goods" (P.CP.01.OPR.011)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.011 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of purpose of the changed data on release of goods |
|
3 |
Contractor |
central customs authority of appointment |
|
4 |
Accomplishment conditions |
it is carried out when obtaining by the contractor of the changed data on release of goods (transaction "Submission to the central customs authority of purpose of the changed data on release of goods" (P.CP.01.OPR.010)) |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of the changed data on release of goods, creates and sends the notification on processing of the changed data on release of goods to the central customs authority of departure |
|
7 |
Results |
the changed data on release of goods are processed, the notification on processing of the changed data |
Table 22
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Purpose of the Changed Data on Release of Goods" (P.CP.01.OPR.012)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.012 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of purpose of the changed data on release of goods |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of the changed data |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of the changed data |
|
7 |
Results |
the notification on processing of the changed data |
Table 23
Activity description "Submission to the Central Intermediate Customs Authority of the Changed Data on Release of Goods" (P.CP.01.OPR.013)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.013 |
|
2 |
Name of transaction |
submission to the central intermediate customs authority of the changed data on release of goods |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of the changed data on release of goods provided that data on release of goods are provided to the central intermediate customs authority |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor creates and represents the changed data on release of goods to the central intermediate customs authority, in compliance |
|
7 |
Results |
the changed data on release of goods are provided to the central intermediate customs authority |
Table 24
Activity description "Acceptance and Processing in the Central Intermediate Customs Authority of the Changed Data on Release of Goods" (P.CP.01.OPR.014)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.014 |
|
2 |
Name of transaction |
acceptance and processing in the central intermediate customs authority of the changed data on release of goods |
|
3 |
Contractor |
central intermediate customs authority |
|
4 |
Accomplishment conditions |
it is carried out when obtaining by the contractor of the changed data on release of goods (transaction "Submission to the central intermediate customs authority of the changed data on release of goods" (P.CP.01.OPR.013)) |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of the changed data on release of goods, creates and sends the notification on processing of the changed data on release of goods to the central customs authority of departure |
|
7 |
Results |
the changed data on release of goods are processed, the notification on processing of the changed data |
Table 25
Activity description "Receipt of the Notification on Processing in the Central Intermediate Customs Authority of the Changed Data on Release of Goods" (P.CP.01.OPR.015)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.015 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central intermediate customs authority of the changed data on release of goods |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of the changed data |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of the changed data |
|
7 |
Results |
the notification on processing of the changed data |
Table 26
Activity description "Submission to the Central Customs Authority Informed on Transportation of Goods, the Changed Data on Release of Goods" (P.CP.01.OPR.016)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.016 |
|
2 |
Name of transaction |
submission to the central customs authority informed on transportation of goods, the changed data on release of goods |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of the changed data on release of goods provided that data on release of goods are provided to the central customs authority informed on transportation of goods |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor creates and represents the changed data on release of goods to the central customs authority informed on transportation of goods according to Regulations of information exchange when implementing transit |
|
7 |
Results |
the changed data on release of goods are provided to the central customs authority informed on transportation of goods |
Table 27
Activity description "Acceptance and Processing in the Central Customs Authority Informed on Transportation of Goods, the Changed Data on Release of Goods" (P.CP.01.OPR.017)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.017 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority informed on transportation of goods, the changed data on release of goods |
|
3 |
Contractor |
the central customs authority informed |
|
4 |
Accomplishment conditions |
it is carried out when obtaining by the contractor of the changed data on release of goods (transaction "Submission to the central customs authority informed on transportation of goods, the changed data on release of goods" (P.CP.01.OPR.016)) |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of the changed data on release of goods, creates and sends the notification on processing of the changed data on release of goods to the central customs authority of departure |
|
7 |
Results |
the changed data on release of goods are processed, the notification on processing of the changed data |
Table 28
Activity description "Receipt of the Notification on Processing in the Central Customs Authority Informed on Transportation of Goods, the Changed Data on Release of Goods" (P.CP.01.OPR.018)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.018 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority informed on transportation of goods, the changed data on release of goods |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of the changed data |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of the changed data |
|
7 |
Results |
the notification on processing of the changed data |
"Cancellation of Data on Release of Goods" procedure (P.CP.01.PRC.003)
59. The scheme of accomplishment of the "Cancellation of Data on Release of Goods" procedure (P.CP.01.PRC.003) is provided in the figure 9.
Fig. 9. Scheme of accomplishment of the "Cancellation of Data on Release of Goods" procedure (P.CP.01.PRC.003)
60. The "Cancellation of Data on Release of Goods" procedure (P.CP.01.PRC.003) is performed by the central customs authority of departure in need of cancellation of earlier directed data on release of goods or cancellation of release of goods provided that the "Informing on Release of Goods according to Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.001) is executed successfully. In case of accomplishment of the procedure the central customs authority of departure provides information on cancellation of data on release of goods in the central customs authorities to which data on release of goods in case of accomplishment of the "Informing on Release of Goods according to Customs Procedure of Customs Transit" procedure are earlier provided (P.CP.01.PRC.001).
61. The first carries out transaction "Submission to the central customs authority of purpose of information on cancellation of data on release of goods" (P.CP.01.OPR.019) by results of which accomplishment the central customs authority of departure creates and provides information on cancellation of data on release of goods or cancellation of release of goods in the central customs authority of appointment.
62. In case of receipt of information on cancellation of data on release of goods or cancellation of release of goods by the central customs authority of appointment transaction "Acceptance and processing in the central customs authority of purpose of information on cancellation of data on release of goods" is carried out (P.CP.01.OPR.020) by results of which accomplishment acceptance and processing of the specified information are performed. The notification on results of information processing on cancellation of data on release of goods goes to the central customs authority of departure.
63. When obtaining by the central customs authority of departure of the notification on results of information processing about cancellation of data on release of goods transaction "Receipt of the notification on results of processing in the central customs authority of purpose of information on cancellation of data on release of goods" is carried out (P.CP.01.OPR.021) by results of which accomplishment acceptance and processing of the specified notification are performed.
64. Transaction "Submission to the central intermediate customs authority of information on cancellation of data on release of goods" (P.CP.01.OPR.022) is carried out provided that data on release of goods are provided to the central intermediate customs authority. By results of transaction accomplishment the central customs authority of departure creates and provides information on cancellation of data on release of goods or cancellation of release of goods in the central intermediate customs authority. Transaction "Submission to the central intermediate customs authority of information on cancellation of data on release of goods" (P.CP.01.OPR.022) is carried out for each central intermediate customs authority meeting transaction accomplishment condition.
65. In case of receipt by the central intermediate customs authority of information on cancellation of data on release of goods or cancellation of release of goods transaction "Acceptance and processing in the central intermediate customs authority of information on cancellation of data on release of goods" is carried out (P.CP.01.OPR.023) by results of which accomplishment acceptance and processing of the specified information are performed. The notification on results of information processing on cancellation of data on release of goods goes to the central customs authority of departure.
66. When obtaining by the central customs authority of departure of the notification on results of information processing about cancellation of data on release of goods or cancellation of release of goods transaction "Receipt of the notification on results of processing in the central intermediate customs authority of information on cancellation of data on release of goods" is carried out (P.CP.01.OPR.024) by results of which accomplishment acceptance and processing of the specified notification are performed.
67. Transaction "Submission to the central customs authority informed on transportation of goods, information on cancellation of data on release of goods" (P.CP.01.OPR.025) is carried out provided that data on release of goods are provided to the central customs authority informed on transportation of goods. By results of transaction accomplishment the central customs authority of departure creates and represents to the central customs authority informed on transportation of goods, information on cancellation of data on release of goods or cancellation of release of goods. Transaction "Submission to the central intermediate customs authority of information on cancellation of data on release of goods" (P.CP.01.OPR.022) is carried out for each central customs authority informed on transportation of goods, meeting condition of transaction accomplishment.
68. During the obtaining by the central customs authority informed on transportation of goods, information on cancellation of data on release of goods or cancellation of release of goods transaction "Acceptance and processing in the central customs authority informed on transportation of goods, information on cancellation of data on release of goods" is carried out (P.CP.01.OPR.026) by results of which accomplishment acceptance and information processing are performed. The notification on results of information processing on cancellation of data on release of goods goes to the central customs authority of departure.
69. When obtaining by the central customs authority of departure of the notification on results of information processing about cancellation of data on release of goods or cancellation of release of goods, transaction "Receipt of the notification on results of processing in the central customs authority informed on transportation of goods, information on cancellation of data on release of goods" is carried out (P.CP.01.OPR.027) by results of which accomplishment acceptance and processing of the specified notification are performed.
70. Result of accomplishment of the "Cancellation of Data on Release of Goods" procedure (P.CP.01.PRC.003) is information processing about cancellation of data on release of goods or cancellation of release of goods by all central customs authorities in which the specified information is provided.
71. The list of the transactions of general process which are carried out within the "Cancellation of Data on Release of Goods" procedure (P.CP.01.PRC.003), is given in table 29.
Table 29
The list of the transactions of general process which are carried out within the procedure "Cancellation of data on release of goods" (P.CP.01.PRC.003)
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.OPR.019 |
submission to the central customs authority of purpose of information on cancellation of data on release of goods |
it is provided in table 30 of these rules |
|
P.CP.01.OPR.020 |
acceptance and processing in the central customs authority of purpose of information on cancellation of data on release of goods |
it is provided in table 31 of these rules |
|
P.CP.01.OPR.021 |
receipt of the notification |
it is provided in table 32 of these rules |
|
P.CP.01.OPR.022 |
submission to the central intermediate customs authority of information on cancellation of data on release of goods |
it is provided in table 33 of these rules |
|
P.CP.01.OPR.023 |
acceptance and processing in the central intermediate customs authority of information on cancellation of data on release of goods |
it is provided in table 34 of these rules |
|
P.CP.01.OPR.024 |
receipt of the notification |
it is provided in table 35 of these rules |
|
P.CP.01.OPR.025 |
submission to the central customs authority informed on transportation of goods, information on cancellation of data on release of goods |
it is provided in table 36 of these rules |
|
P.CP.01.OPR.026 |
acceptance and processing in the central customs authority informed on transportation of goods, information on cancellation of data on release of goods |
it is provided in table 37 of these rules |
|
P.CP.01.OPR.027 |
receipt of the notification |
it is provided in table 38 of these rules |
Table 30
Activity description "Submission to the Central Customs Authority of Purpose of Information on Cancellation of Data on Release of Goods" (P.CP.01.OPR.019)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.019 |
|
2 |
Name of transaction |
submission to the central customs authority of purpose of information on cancellation of data on release of goods |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of information on cancellation of data on release of goods or information on cancellation of release of goods |
|
5 |
Restrictions |
the format and structure of information shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor creates and provides information on cancellation of data on release of goods |
|
7 |
Results |
information on cancellation of data on release of goods is provided in the central customs authority of appointment |
Table 31
Activity description "Acceptance and Processing in the Central Customs Authority of Purpose of Information on Cancellation of Data on Release of Goods" (P.CP.01.OPR.020)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.020 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of purpose of information on cancellation of data on release of goods |
|
3 |
Contractor |
central customs authority of appointment |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of information on cancellation of data on release of goods (transaction "Submission to the central customs authority of purpose of information on cancellation of data on release of goods" (P.CP.01.OPR.019)) |
|
5 |
Restrictions |
the format and structure of the provided information shall match the Description of formats |
|
6 |
Activity description |
the contractor performs acceptance and information processing about cancellation of data on release of goods, creates and sends the notification to the central customs authority of departure |
|
7 |
Results |
information on cancellation of data on release of goods is processed, the notification on results of information processing on cancellation of data |
Table 32
Activity description "Receipt of the Notification on Results of Processing in the Central Customs Authority of Purpose of Information on Cancellation of Data on Release of Goods" (P.CP.01.OPR.021)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.021 |
|
2 |
Name of transaction |
receipt of the notification on results of processing |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on results of information processing about cancellation of data about release of goods (transaction "Acceptance and processing in the central customs authority of purpose of information on cancellation of data on release of goods" (P.CP.01.OPR.020)) |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on results of information processing about cancellation of data on release of goods |
|
7 |
Results |
the notification on results of information processing on cancellation of data on release of goods is processed |
Table 33
Activity description "Submission to the Central Intermediate Customs Authority of Information on Cancellation of Data on Release of Goods" (P.CP.01.OPR.022)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.022 |
|
2 |
Name of transaction |
submission to the central intermediate customs authority of information on cancellation of data on release of goods |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of information on cancellation of data on release of goods or information on cancellation of release of goods provided that data on release of goods are provided |
|
5 |
Restrictions |
the format and structure of information shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor creates and provides information on cancellation of data on release of goods |
|
7 |
Results |
Information on cancellation of data on release of goods is provided in the central intermediate customs authority |
Table 34
Activity description "Acceptance and Processing in the Central Intermediate Customs Authority of Information on Cancellation of Data on Release of Goods" (P.CP.01.OPR.023)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.023 |
|
2 |
Name of transaction |
acceptance and processing in the central intermediate customs authority of information on cancellation of data on release of goods |
|
3 |
Contractor |
central intermediate customs authority |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of information on cancellation of data on release of goods (transaction "Submission to the central intermediate customs authority of information on cancellation of data on release of goods" (P.CP.01.OPR.022)) |
|
5 |
Restrictions |
the format and structure of the provided information shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and information processing about cancellation of data on release of goods, creates and sends the notification to the central customs authority of departure |
|
7 |
Results |
information on cancellation of data on release of goods is processed, the notification on results of information processing on cancellation of data |
Table 35
Activity description "Receipt of the Notification on Results of Processing in the Central Intermediate Customs Authority of Information on Cancellation of Data on Release of Goods" (P.CP.01.OPR.024)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.024 |
|
2 |
Name of transaction |
receipt of the notification on results of processing |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on results of information processing about cancellation of data on release of goods (transaction "Acceptance and processing in the central intermediate customs authority of information on cancellation of data on release of goods" (P.CP.01.OPR.023)) |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on results of information processing about cancellation of data on release of goods |
|
7 |
Results |
the notification on results of information processing on cancellation of data on release of goods is processed |
Table 36
Activity description "Submission to the Central Customs Authority Informed on Transportation of Goods, Information on Cancellation of Data on Release of Goods" (P.CP.01.OPR.025)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.025 |
|
2 |
Name of transaction |
submission to the central customs authority informed on transportation of goods, information on cancellation of data on release of goods |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of information on cancellation of data on release of goods provided that data on release of goods are provided |
|
5 |
Restrictions |
the format and structure of information shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor creates and provides information on cancellation of data on release of goods |
|
7 |
Results |
information on cancellation of data on release of goods is provided in the central customs authority informed on transportation of goods |
Table 37
Activity description "Acceptance and Processing in the Central Customs Authority Informed on Transportation of Goods, Information on Cancellation of Data on Release of Goods" (P.CP.01.OPR.026)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.026 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority informed on transportation of goods, information on cancellation of data on release of goods |
|
3 |
Contractor |
the central customs authority informed |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of information on cancellation of data on release of goods (transaction "Submission to the central customs authority informed on transportation of goods, information on cancellation of data |
|
5 |
Restrictions |
the format and structure of the provided information shall match the Description of formats |
|
6 |
Activity description |
the contractor performs acceptance and information processing about cancellation of data on release of goods, creates and sends the notification to the central customs authority of departure |
|
7 |
Results |
information on cancellation of data on release of goods is processed, the notification on results of information processing on cancellation of data |
Table 38
Activity description "Receipt of the Notification on Results of Processing in the Central Customs Authority Informed on Transportation of Goods, Information on Cancellation of Data on Release of Goods" (P.CP.01.OPR.027)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.027 |
|
2 |
Name of transaction |
receipt of the notification on results of processing |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on results of information processing about cancellation of data on release of goods (transaction "Acceptance and processing in the central customs authority informed on transportation of goods, information on cancellation of data |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on results of information processing about cancellation of data on release of goods |
|
7 |
Results |
the notification on results of information processing on cancellation of data on release of goods is processed |
"Request of Data on Release of Goods according to Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.004)
72. The scheme of accomplishment of the "Request of Data on Release of Goods according to Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.004) is provided in the figure 10.
Fig. 10. Scheme of accomplishment of the "Request of Data on Release of Goods according to Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.004)
73. The "Request of Data on Release of Goods according to Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.004) is performed by the central customs authority of appointment, either the central intermediate customs authority, or the central customs authority, making, unplanned earlier customs activities if in information system of the central customs authority, in the region (zone) of activities of which customs transactions are made, there are no data on release of goods.
74. The first carries out transaction "Request of data on release of goods" (P.CP.01.OPR.028) by results of which accomplishment by the central customs authority, being the initiator of request, creates and sent to the central customs authority of departure inquiry for submission of data on release of goods.
75. In case of receipt of request for submission of data on release of goods by the central customs authority of departure, transaction "Idea of result of accomplishment of request of data on release of goods" is carried out (P.CP.01.OPR.029) by results of which accomplishment, the central customs authority of departure is created and goes to the central customs authority, being the initiator of request one of the following messages:
the message containing data on release of goods (if in the central customs authority of departure there are corresponding data);
the non-availability notice of the data satisfying to request parameters.
When forming data on release of goods the scope of information in addition joins information on the customs transactions made in process to transportation of goods according to customs procedure of customs transit, in the presence in information system of customs authority of departure of data on such transactions at the time of receipt of request.
76. In case of the obtaining by the central customs authority which requested data, result of accomplishment of request for submission of data on release of goods transaction "Acceptance and processing of result of accomplishment of request of data on release of goods" is carried out (P.CP.01.OPR.030).
77. Result of accomplishment of the "Request of Data on Release of Goods according to Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.004) is processing in the central customs authority, being the initiator of request, result of accomplishment of request for submission of data on release of goods.
78. The list of the transactions of general process which are carried out within the procedure "Request of data on release of goods in compliance
with customs procedure of customs transit" (P.CP.01.PRC.004), is given in table 39.
Table 39
The list of the transactions of general process which are carried out within the procedure "the Request of data on release of goods according to customs procedure of customs transit" (P.CP.01.PRC.004)
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.OPR.028 |
request of data on release of goods |
it is provided in table 40 of these rules |
|
P.CP.01.OPR.029 |
representation of result of accomplishment of request of data |
it is provided in table 41 of these rules |
|
P.CP.01.OPR.030 |
acceptance and processing of result of accomplishment of request of data |
it is provided in table 42 of these rules |
Table 40
Activity description "Request of Data on Release of Goods" (P.CP.01.OPR.028)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.028 |
|
2 |
Name of transaction |
request of data on release of goods |
|
3 |
Contractor |
central customs authority of appointment, central intermediate customs authority, the central customs authority making unplanned earlier customs organizations |
|
4 |
Accomplishment conditions |
it is carried out in case of lack of data on release of goods in information system of the contractor |
|
5 |
Restrictions |
the format and structure of request for submission of data on release of goods shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor creates and sends inquiry |
|
7 |
Results |
the inquiry for submission of data on release of goods is sent to the central customs authority of departure |
Table 41
Activity description "Representation of Result of Accomplishment of Request of Data on Release of Goods" (P.CP.01.OPR.029)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.029 |
|
2 |
Name of transaction |
representation of result of accomplishment of request of data on release of goods |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of request for submission of data on release of goods (transaction "Request of data on release of goods" (P.CP.01.OPR.028)) |
|
5 |
Restrictions |
the format and structure of request shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs processing of request |
|
7 |
Results |
the request for submission of data on release of goods is processed, the result of accomplishment of request is sent to the initiator of request |
Table 42
Activity description "Acceptance and Processing of Result of Accomplishment of Request of Data on Release of Goods" (P.CP.01.OPR.030)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.030 |
|
2 |
Name of transaction |
acceptance and processing of result of accomplishment of request of data on release of goods |
|
3 |
Contractor |
central customs authority of appointment, central intermediate customs authority, the central customs authority making unplanned earlier customs organizations |
|
4 |
Accomplishment conditions |
it is carried out when obtaining by the contractor of result of accomplishment of request for submission of data |
|
5 |
Restrictions |
the format and structure of the provided data shall match the Description of formats |
|
6 |
Activity description |
the contractor performs acceptance and processing of result of accomplishment of request for submission of data on release of goods |
|
7 |
Results |
the result of accomplishment of request for submission of data on release of goods is processed |
"Informing on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" procedure (P.CP.01.PRC.005)
79. The scheme of accomplishment of the "Informing on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" procedure (P.CP.01.PRC.005) is provided in the figure 11.
Fig. 11. Scheme of accomplishment of the "Informing on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" procedure (P.CP.01.PRC.005)
80. The "Informing on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" procedure (P.CP.01.PRC.005) is carried out in case of completion of action of customs procedure of customs transit in connection with change of delivery location. After fixing in information system of the central customs authority making unplanned earlier customs activities, the data about completion of action of customs procedure of customs transit in connection with change of delivery location, such central customs authority making unplanned earlier customs activities represents the specified data to the central customs authorities of other state members. The list of participants of information exchange in case of accomplishment of the "Informing on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" procedure (P.CP.01.PRC.005) is determined by conditions of accomplishment of separate transactions of the procedure of general process.
81. Transaction "Submission to the central customs authority of departure of data on completion of action of customs procedure of customs transit in connection with change of delivery location" (P.CP.01.OPR.031) is carried out provided that the region (zone) of activities of the central customs authority making unplanned earlier customs activities does not match with the region (zone) of activities of the central customs authority of departure. By results of transaction accomplishment the central customs authority making unplanned earlier customs activities creates and represents to the central customs authority of departure of the data on completion of action of customs procedure of customs transit in connection with change of delivery location.
82. When obtaining by the central customs authority of departure of data on completion of action of customs procedure of customs transit in connection with change of delivery location transaction "Acceptance and processing in the central customs authority of departure of data on completion of action of customs procedure of customs transit in connection with change of delivery location" is carried out (P.CP.01.OPR.032) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location goes to the central customs authority making unplanned earlier customs activities.
83. When obtaining by the central customs authority making unplanned earlier customs activities, notifications on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location transaction "Receipt of the notification on processing in the central customs authority of departure of data on completion of action of customs procedure of customs transit in connection with change of delivery location" is carried out (P.CP.01.OPR.033) by results of which accomplishment acceptance and processing of the specified notification are performed.
84. Transaction "Submission to the central customs authority of purpose of data on completion of action of customs procedure of customs transit in connection with change of delivery location" (P.CP.01.OPR.034) is carried out provided that the region (zone) of activities of the central customs authority making unplanned earlier customs activities do not match with the region (zone) of activities of the central customs authority of appointment. By results of transaction accomplishment the central customs authority making unplanned earlier customs activities creates and represents to the central customs authority of purpose of the data on completion of action of customs procedure of customs transit in connection with change of delivery location.
85. When obtaining by the central customs authority of purpose of data on completion of action of customs procedure of customs transit in connection with change of delivery location transaction "Acceptance and processing in the central customs authority of purpose of data on completion of action of customs procedure of customs transit in connection with change of delivery location" is carried out (P.CP.01.OPR.035) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of data on completion of action of customs procedure of customs transit goes to the central customs authority making unplanned earlier customs activities.
86. When obtaining by the central customs authority making unplanned earlier customs activities, notifications on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location transaction "Receipt of the notification on processing in the central customs authority of purpose of data on completion of action of customs procedure of customs transit in connection with change of delivery location" is carried out (P.CP.01.OPR.036) by results of which accomplishment acceptance and processing of the specified notification are performed.
87. Transaction "Submission to the central intermediate customs authority of data on completion of action of customs procedure of customs transit in connection with change of delivery location" (P.CP.01.OPR.037) is carried out provided that data on release of goods contain information on customs authorities in which confirmation of observance of the established transportation route is planned (taking into account the changes made to route of transportation (transportation) of goods), and (or) on customs authorities, in which implementation of cargo operations is planned, and the specified customs authorities are out of the region (zone) of activities of the central intermediate customs authority making unplanned earlier customs activities. In case of transaction accomplishment "Submission to the central intermediate customs authority of data on completion of action of customs procedure of customs transit in connection with change of delivery location" (P.CP.01.OPR.037) creates the central customs authority making unplanned earlier customs activities and represents to the central intermediate customs authority of the data on completion of action of customs procedure of customs transit in connection with change of delivery location. Transaction "Submission to the central intermediate customs authority of data on completion of action of customs procedure of customs transit in connection with change of delivery location" (P.CP.01.OPR.037) is carried out for each central intermediate customs authority meeting transaction accomplishment condition.
88. When obtaining by the central intermediate customs authority, data on completion of action of customs procedure of customs transit in connection with change of delivery location transaction "Acceptance and processing in the central intermediate customs authority of data on completion of action of customs procedure of customs transit in connection with change of delivery location" is carried out (P.CP.01.OPR.038) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location goes to the central customs authority making unplanned earlier customs activities.
89. When obtaining by the central customs authority making unplanned earlier customs activities, notifications on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location transaction "Receipt of the notification on processing in the central intermediate customs authority of data on completion of action of customs procedure of customs transit in connection with change of delivery location" is carried out (P.CP.01.OPR.039) by results of which accomplishment acceptance and processing of the specified notification are performed.
90. Transaction "Submission to the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit in connection with change of delivery location" (P.CP.01.OPR.040) is carried out provided that in case of release of goods according to customs procedure of customs transit as the document confirming provision of ensuring payment of customs duties, taxes the certificate of providing and the region (zone) of activities of the central customs authority making unplanned earlier customs activities was used does not match with the region (zone) of activities of the central customs authority of registration of the certificate. By results of transaction accomplishment the central customs authority making unplanned earlier customs activities creates and represents to the central customs authority of registration of the certificate, data on completion of action of customs procedure of customs transit in connection with change of delivery location.
91. In case of receipt by the central customs authority of registration of the certificate, data on completion of action of customs procedure of customs transit in connection with change of delivery location, transaction "Acceptance and processing in the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit in connection with change of delivery location" is carried out (P.CP.01.OPR.041) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location goes to the central customs authority making unplanned earlier customs activities.
92. When obtaining by the central customs authority making unplanned earlier customs activities, notifications on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location transaction "Receipt of the notification on processing in the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit in connection with change of delivery location" is carried out (P.CP.01.OPR.042) by results of which accomplishment acceptance and processing of the specified data are performed.
93. Result of accomplishment of the "Informing on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" procedure (P.CP.01.PRC.005) is processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location by all central customs authorities to which the specified data are provided.
94. The list of the transactions of general process which are carried out within the "Informing on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" procedure (P.CP.01.PRC.005), is given in table 43.
Table 43
The list of the transactions of general process which are carried out within the procedure "Informing on completion of action of customs procedure of customs transit in connection with change of delivery location" (P.CP.01.PRC.005)
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.OPR.031 |
submission to the central customs authority of departure of data on completion of action of customs procedure of customs transit in communication |
it is provided in table 44 of these rules |
|
P.CP.01.OPR.032 |
acceptance and processing in the central customs authority of departure of data on completion of action of customs procedure of customs transit in communication |
it is provided in table 45 of these rules |
|
P.CP.01.OPR.033 |
receipt of the notification on processing in the central customs authority of departure of data on completion of action of customs procedure of customs transit in communication |
it is provided in table 46 of these rules |
|
P.CP.01.OPR.034 |
submission to the central customs authority of purpose of data on completion of action of customs procedure of customs transit in communication |
it is provided in table 47 of these rules |
|
P.CP.01.OPR.035 |
acceptance and processing in the central customs authority of purpose of data on completion of action of customs procedure of customs transit in communication |
it is provided in table 48 of these rules |
|
P.CP.01.OPR.036 |
receipt of the notification on processing in the central customs authority of purpose of data on completion of action of customs procedure of customs transit in communication |
it is provided in table 49 of these rules |
|
P.CP.01.OPR.037 |
submission to the central intermediate customs authority of data on completion of action of customs procedure of customs transit in communication |
it is provided in table 50 of these rules |
|
P.CP.01.OPR.038 |
acceptance and processing in the central intermediate customs authority of data on completion of action of customs procedure of customs transit in communication |
it is provided in table 51 of these rules |
|
P.CP.01.OPR.039 |
receipt of the notification on processing in the central intermediate customs authority of data on completion of action of customs procedure of customs transit in communication |
it is provided in table 52 of these rules |
|
P.CP.01.OPR.040 |
submission to the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit in communication |
it is provided in table 53 of these rules |
|
P.CP.01.OPR.041 |
acceptance and processing in the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit in communication |
it is provided in table 54 of these rules |
|
P.CP.01.OPR.042 |
receipt of the notification on processing in the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit in communication |
it is provided in table 55 of these rules |
Table 44
Activity description "Submission to the Central Customs Authority of Departure of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.031)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.031 |
|
2 |
Name of transaction |
submission to the central customs authority of departure of data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of data on completion of action of customs procedure of customs transit in connection with change of delivery location provided that the region (zone) of activities of the contractor does not match with the region (zone) of activities of the central customs authority of departure |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor creates and represents data |
|
7 |
Results |
data on completion of action of customs procedure of customs transit in communication |
Table 45
Activity description "Acceptance and Processing in the Central Customs Authority of Departure of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.032)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.032 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of departure of data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt of data by the contractor |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of data on completion of action of customs procedure of customs transit in communication |
|
7 |
Results |
data on completion of action of customs procedure of customs transit in communication |
Table 46
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Departure of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.033)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.033 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of departure of data |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location (transaction "Acceptance and processing in the central customs authority of departure of data |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
7 |
Results |
the notification on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location is processed |
Table 47
Activity description "Submission to the Central Customs Authority of Purpose of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.034)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.034 |
|
2 |
Name of transaction |
submission to the central customs authority of purpose of data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of data on completion of action of customs procedure of customs transit in connection with change of delivery location provided that the region (zone) of activities of the contractor does not match with the region (zone) of activities of the central customs authority of appointment |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor creates and represents data |
|
7 |
Results |
data on completion of action of customs procedure of customs transit in communication |
Table 48
Activity description "Acceptance and Processing in the Central Customs Authority of Purpose of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.035)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.035 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of purpose of data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
3 |
Contractor |
central customs authority of appointment |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt of data by the contractor |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of data on completion of action of customs procedure of customs transit in communication |
|
7 |
Results |
data on completion of action of customs procedure of customs transit in communication |
Table 49
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Purpose of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.036)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.036 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of purpose of data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location (transaction "Acceptance and processing in the central customs authority of purpose of data |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
7 |
Results |
the notification on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location is processed |
Table 50
Activity description "Submission to the Central Intermediate Customs Authority of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.037)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.037 |
|
2 |
Name of transaction |
submission to the central intermediate customs authority of data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of data on completion of action of customs procedure of customs transit in connection with change of delivery location provided that data on release of goods contain information on customs authorities in which confirmation of observance of the established transportation route is planned (taking into account the changes made to route of transportation (transportation) of goods), and (or) on customs authorities, in which implementation of cargo operations is planned, and the specified customs authorities are out of the region (zone) of activities of the contractor |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor creates and represents data |
|
7 |
Results |
data on completion of action of customs procedure of customs transit in communication |
Table 51
Activity description "Acceptance and Processing in the Central Intermediate Customs Authority of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.038)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.038 |
|
2 |
Name of transaction |
acceptance and processing in the central intermediate customs authority of data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
3 |
Contractor |
central intermediate customs authority |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt of data by the contractor |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of data on completion of action of customs procedure of customs transit in communication |
|
7 |
Results |
data on completion of action of customs procedure of customs transit in communication |
Table 52
Activity description "Receipt of the Notification on Processing in the Central Intermediate Customs Authority of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.039)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.039 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central intermediate customs authority of data |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location (transaction "Acceptance and processing in the central intermediate customs authority of data |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
7 |
Results |
the notification on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location is processed |
Table 53
Activity description "Submission to the Central Customs Authority of Registration of the Certificate of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.040)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.040 |
|
2 |
Name of transaction |
submission to the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of information on completion of action of customs procedure of customs transit in connection with change of delivery location, |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor creates and represents data |
|
7 |
Results |
data on completion of action of customs procedure of customs transit in communication |
Table 54
Activity description "Acceptance and Processing in the Central Customs Authority of Registration of the Certificate of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.041)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.041 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
3 |
Contractor |
central customs authority of registration of the certificate |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt of data by the contractor |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location, creates and sends to the central customs authority making unplanned earlier customs activities, the notification on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
7 |
Results |
data on completion of action of customs procedure of customs transit in communication |
Table 55
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Registration of the Certificate of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.042)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.042 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit in communication |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location (transaction "Acceptance and processing in the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit in communication |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
7 |
Results |
the notification on processing of data on completion of action of customs procedure of customs transit in connection with change of delivery location, is processed |
"Change of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" procedure (P.CP.01.PRC.006)
95. The scheme of accomplishment of the "Change of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" procedure (P.CP.01.PRC.006) is provided in the figure 12.
Fig. 12. Scheme of accomplishment of the "Change of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" procedure (P.CP.01.PRC.006)
96. The "Change of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" procedure (P.CP.01.PRC.006) is performed after modification of data on completion of action of customs procedure of customs transit in connection with change of delivery location provided that the "Informing on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" procedure (P.CP.01.PRC.005) is executed successfully. In case of accomplishment of the "Change of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" procedure (P.CP.01.PRC.006) the central customs authority making unplanned earlier customs activities represents the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location to the central customs authorities to which data on completion of action of customs procedure of customs transit in case of accomplishment of the "Informing on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" procedure are provided (P.CP.01.PRC.005).
97. Transaction "Submission to the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location" (P.CP.01.OPR.043) is carried out provided that data on completion of action of customs procedure of customs transit in connection with change of delivery location are provided to the central customs authority of departure. By results of transaction accomplishment the central customs authority making unplanned earlier customs activities creates and represents to the central customs authority of departure the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location.
98. When obtaining by the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location transaction "Acceptance and processing in the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location in connection with change of delivery location" is carried out (P.CP.01.OPR.044) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location goes to the central customs authority making unplanned earlier customs activities.
99. When obtaining by the central customs authority making unplanned earlier customs activities, notifications on processing of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location transaction "Receipt of the notification on processing in the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location" is carried out (P.CP.01.OPR.045) by results of which accomplishment acceptance and processing of the specified notification are performed.
100. Transaction "Submission to the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location" (P.CP.01.OPR.046) is carried out provided that data on completion of action of customs procedure of customs transit in connection with change of delivery location are provided to the central customs authority of appointment. By results of transaction accomplishment the central customs authority making unplanned earlier customs activities creates and represents to the central customs authority of appointment the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location.
101. In case of receipt of appointment by the central customs authority, the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location, transaction "Acceptance and processing in the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location" is carried out (P.CP.01.OPR.047) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location goes to the central customs authority making unplanned earlier customs activities.
102. When obtaining by the central customs authority making unplanned earlier customs activities, notifications on processing of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location transaction "Receipt of the notification on processing in the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location" is carried out (P.CP.01.OPR.048) by results of which accomplishment acceptance and processing of the specified notification are performed.
103. Transaction "Submission to the central intermediate customs authority of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location" (P.CP.01.OPR.049) is carried out provided that data on completion of action of customs procedure of customs transit in connection with change of delivery location are provided to the central intermediate customs authority. By results of transaction accomplishment the central customs authority making unplanned earlier customs activities creates and represents to the central intermediate customs authority the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location. Transaction "Submission to the central intermediate customs authority of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location" (P.CP.01.OPR.049) is carried out for each central intermediate customs authority meeting transaction accomplishment condition.
104. When obtaining by the central intermediate customs authority, the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location, transaction "Acceptance and processing in the central intermediate customs authority of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location" is carried out (P.CP.01.OPR.050) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location goes to the central customs authority making unplanned earlier customs activities.
105. When obtaining by the central customs authority making unplanned earlier customs activities, notifications on processing of the changed data on completion of action of customs procedure of customs transit transaction "Receipt of the notification on processing in the central intermediate customs authority of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location" is carried out (P.CP.01.OPR.051) by results of which accomplishment acceptance and processing of the specified data are performed.
106. Transaction "Submission to the central customs authority of registration of the certificate of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location" (P.CP.01.OPR.052) is carried out provided that data on completion of action of customs procedure of customs transit are provided to the central customs authority of registration of the certificate. By results of transaction accomplishment the central customs authority making unplanned earlier customs activities creates and represents to the central customs authority of registration of the certificate the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location.
107. In case of receipt of registration of the certificate by the central customs authority, the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location transaction "Acceptance and processing in the central customs authority of registration of the certificate of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location" is carried out (P.CP.01.OPR.053) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location goes to the central customs authority making unplanned earlier customs activities.
108. When obtaining by the central customs authority making unplanned earlier customs activities, notifications on processing of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location transaction "Receipt of the notification on processing in the central customs authority of registration of the certificate of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location" is carried out (P.CP.01.OPR.054) by results of which accomplishment acceptance and processing of the specified notification are performed.
109. Result of accomplishment of the "Change of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" procedure (P.CP.01.PRC.006) is processing of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location by all central customs authorities to which the specified data are provided.
110. The list of the transactions of general process which are carried out within the "Change of Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" procedure (P.CP.01.PRC.006), is given in table 56.
Table 56
The list of the transactions of general process which are carried out within the procedure "Change of data on completion of action of customs procedure of customs transit in connection with change of delivery location" (P.CP.01.PRC.006)
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.OPR.043 |
submission to the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit in communication |
it is provided in table 57 of these rules |
|
P.CP.01.OPR.044 |
acceptance and processing in the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit in communication |
it is provided in table 58 of these rules |
|
P.CP.01.OPR.045 |
receipt of the notification on processing in the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit in communication |
it is provided in table 59 of these rules |
|
P.CP.01.OPR.046 |
submission to the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in communication |
it is provided in table 60 of these rules |
|
P.CP.01.OPR.047 |
acceptance and processing in the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in communication |
it is provided in table 61 of these rules |
|
P.CP.01.OPR.048 |
receipt of the notification |
it is provided in table 62 of these rules |
|
P.CP.01.OPR.049 |
submission to the central intermediate customs authority of the changed data on completion of action of customs procedure of customs transit in communication |
it is provided in table 63 of these rules |
|
P.CP.01.OPR.050 |
acceptance and processing in the central intermediate customs authority of the changed data on completion of action of customs procedure of customs transit in communication |
it is provided in table 64 of these rules |
|
P.CP.01.OPR.051 |
receipt of the notification on processing in the central intermediate customs authority of the changed data on completion of action of customs procedure of customs transit in communication |
it is provided in table 65 of these rules |
|
P.CP.01.OPR.052 |
submission to the central customs authority of registration of the certificate of the changed data |
it is provided in table 66 of these rules |
|
P.CP.01.OPR.053 |
acceptance and processing in the central customs authority of registration of the certificate of the changed data |
it is provided in table 67 of these rules |
|
P.CP.01.OPR.054 |
receipt of the notification on processing in the central customs authority of registration of the certificate of the changed data |
it is provided in table 68 of these rules |
Table 57
Activity description "Submission to the Central Customs Authority of Departure of the Changed Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.043)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.043 |
|
2 |
Name of transaction |
submission to the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of the changed data |
|
5 |
Restrictions |
format and structure of the changed data |
|
6 |
Activity description |
the contractor creates and represents the changed data on completion of action of customs procedure of customs transit to bonds |
|
7 |
Results |
the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location are provided |
Table 58
Activity description "Acceptance and Processing in the Central Customs Authority of Departure of the Changed Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.044)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.044 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out when obtaining by the contractor of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location (transaction "Submission to the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location" (P.CP.01.OPR.043)) |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location, creates |
|
7 |
Results |
the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location are processed, the notification on processing of the changed data |
Table 59
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Departure of the Changed Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.045)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.045 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit in communication |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of the changed data |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of the changed data |
|
7 |
Results |
the notification on processing of the changed data |
Table 60
Activity description "Submission to the Central Customs Authority of Purpose of the Changed Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.046)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.046 |
|
2 |
Name of transaction |
submission to the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out carried out after fixing |
|
5 |
Restrictions |
format and structure of the changed data |
|
6 |
Activity description |
the contractor creates and represents the changed data on completion of action of customs procedure of customs transit to bonds |
|
7 |
Results |
the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location are provided to the central customs authority of appointment |
Table 61
Activity description "Acceptance and Processing in the Central Customs Authority of Purpose of the Changed Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.047)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.047 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
3 |
Contractor |
central customs authority of appointment |
|
4 |
Accomplishment conditions |
it is carried out when obtaining by the contractor of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location (transaction "Submission to the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location" (P.CP.01.OPR.046)) |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location, creates and sends to the central customs authority making unplanned earlier customs activities, the notification on processing of the changed data on completion of action of customs procedure of customs transit in communication |
|
7 |
Results |
the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location are processed, the notification on processing of the changed data |
Table 62
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Purpose of the Changed Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.048)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.048 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of the changed data |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of the changed data |
|
7 |
Results |
the notification on processing of the changed data |
Table 63
Activity description "Submission to the Central Intermediate Customs Authority of the Changed Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.049)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.049 |
|
2 |
Name of transaction |
submission to the central intermediate customs authority of the changed data |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of the changed data |
|
5 |
Restrictions |
format and structure of the changed data |
|
6 |
Activity description |
the contractor creates and represents the changed data on completion of action of customs procedure of customs transit to bonds |
|
7 |
Results |
the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location are provided to the central intermediate customs authority |
Table 64
Activity description "Acceptance and Processing in the Central Intermediate Customs Authority of the Changed Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.050)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.050 |
|
2 |
Name of transaction |
acceptance and processing in the central intermediate customs authority of the changed data |
|
3 |
Contractor |
central intermediate customs authority |
|
4 |
Accomplishment conditions |
it is carried out when obtaining by the contractor of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location (transaction "Submission to the central intermediate customs authority of the changed data |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location, creates |
|
7 |
Results |
the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location are processed, the notification on processing of the changed data |
Table 65
Activity description "Receipt of the Notification on Processing in the Central Intermediate Customs Authority of the Changed Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.051)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.051 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central intermediate customs authority of the changed data on completion of action of customs procedure of customs transit in communication |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of the changed data |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of the changed data |
|
7 |
Results |
the notification on processing of the changed data |
Table 66
Activity description "Submission to the Central Customs Authority of Registration of the Certificate of the Changed Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.052)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.052 |
|
2 |
Name of transaction |
submission to the central customs authority of registration of the certificate of the changed data |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of the changed data |
|
5 |
Restrictions |
format and structure of the changed data |
|
6 |
Activity description |
the contractor creates and represents the changed data on completion of action of customs procedure of customs transit to bonds |
|
7 |
Results |
the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location are provided to the central customs authority of registration of the certificate |
Table 67
Activity description "Acceptance and Processing in the Central Customs Authority of Registration of the Certificate of the Changed Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.053)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.053 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of registration of the certificate of the changed data |
|
3 |
Contractor |
central customs authority of registration of the certificate |
|
4 |
Accomplishment conditions |
it is carried out when obtaining by the contractor of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location (transaction "Submission to the central customs authority of registration of the certificate of the changed data |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location, creates |
|
7 |
Results |
the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location are processed, the notification on processing of the changed data |
Table 68
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Registration of the Certificate of the Changed Data on Completion of Action of Customs Procedure of Customs Transit in connection with Change of Delivery Location" (P.CP.01.OPR.054)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.054 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of registration of the certificate of the changed data on completion of action of customs procedure of customs transit in connection with change of delivery location |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of the changed data |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of the changed data |
|
7 |
Results |
the notification on processing of the changed data |
"Informing on Completion of Action of Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.007)
111. The scheme of accomplishment of the "Informing on Completion of Action of Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.007) is provided in the figure 13.
Fig. 13. Scheme of accomplishment of the "Informing on Completion of Action of Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.007)
112. The "Informing on Completion of Action of Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.007) is performed in case of completion of action of customs procedure of customs transit. After fixing in information system of the central customs authority of purpose of data on completion of action of customs procedure of customs transit, the central customs authority of appointment represents the specified data to the central customs authorities of other state members. The list of participants of information exchange in case of accomplishment of the "Informing on Completion of Action of Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.007) is determined by conditions of accomplishment of separate transactions of the procedure of general process.
113. The first carries out transaction "Submission to the central customs authority of departure of data on completion of action of customs procedure of customs transit" (which P.CP.01.OPR.055) by results of accomplishment the central customs authority of appointment, creates and represents to the central customs authority of departure of the data on completion of action of customs procedure of customs transit.
114. When obtaining by the central customs authority of departure of data on completion of action of customs procedure of customs transit transaction "Acceptance and processing in the central customs authority of departure of data on completion of action of customs procedure of customs transit" is carried out (P.CP.01.OPR.056) by results of which accomplishment acceptance and processing of the specified data are performed. In the central customs authority of appointment, the notification on processing of data on completion of action of customs procedure of customs transit goes.
115. When obtaining by the central customs authority of purpose of the notification on processing of data on completion of action of customs procedure of customs transit transaction "Receipt of the notification on processing in the central customs authority of departure of data on completion of action of customs procedure of customs transit" is carried out (P.CP.01.OPR.057) by results of which accomplishment acceptance and processing of the specified notification are performed.
116. Transaction "Submission to the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit" (P.CP.01.OPR.058) is carried out provided that in case of release of goods according to customs procedure of customs transit as the document confirming provision of ensuring payment of customs duties, taxes the certificate of providing and the region (zone) of activities of the central customs authority of appointment was used does not match with the region (zone) of activities of the central customs authority of registration of the certificate. By results of transaction accomplishment the central customs authority of appointment creates and represents to the central customs authority of registration of the certificate, data on completion of action of customs procedure of customs transit.
117. When obtaining by the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit transaction "Acceptance and processing in the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit" is carried out (P.CP.01.OPR.059) by results of which accomplishment acceptance and processing of the specified data are performed. In the central customs authority of appointment, the notification on processing of data on completion of action of customs procedure of customs transit goes.
118. When obtaining by the central customs authority of purpose of the notification on processing of data on completion of action of customs procedure of customs transit transaction "Receipt of the notification on processing in the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit" is carried out (P.CP.01.OPR.060) by results of which accomplishment acceptance and processing of the specified notification are performed.
119. Result of accomplishment of the "Informing on Completion of Action of Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.007) is processing of data on completion of action of customs procedure of customs transit by all central customs authorities to which the specified data are provided.
120. The list of the transactions of general process which are carried out within the "Informing on Completion of Action of Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.007), is given in table 69.
Table 69
The list of the transactions of general process which are carried out within the procedure "Informing on completion of action of customs procedure of customs transit" (P.CP.01.PRC.007)
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.OPR.055 |
submission to the central customs authority of departure of data on completion of action of customs procedure of customs transit |
it is provided in table 70 of these rules |
|
P.CP.01.OPR.056 |
acceptance and processing in the central customs authority of departure of data on completion of action of customs procedure of customs transit |
it is provided in table 71 of these rules |
|
P.CP.01.OPR.057 |
receipt of the notification on processing in the central customs authority of departure of data on completion of action of customs procedure of customs transit |
it is provided in table 72 of these rules |
|
P.CP.01.OPR.058 |
submission to the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit |
it is provided in table 73 of these rules |
|
P.CP.01.OPR.059 |
acceptance and processing in the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit |
it is provided in table 74 of these rules |
|
P.CP.01.OPR.060 |
receipt of the notification on processing in the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit |
it is provided in table 75 of these rules |
Table 70
Activity description "Submission to the Central Customs Authority of Departure of Data on Completion of Action of Customs Procedure of Customs Transit" (P.CP.01.OPR.055)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.055 |
|
2 |
Name of transaction |
submission to the central customs authority of departure of data on completion of action of customs procedure of customs transit |
|
3 |
Contractor |
central customs authority of appointment |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of data on completion of action of customs procedure of customs transit |
|
5 |
Restrictions |
the format and structure of data on completion of action of customs procedure of customs transit shall match the Description of formats |
|
6 |
Activity description |
the contractor creates and represents data |
|
7 |
Results |
data on completion of action of customs procedure of customs transit are provided |
Table 71
Activity description "Acceptance and Processing in the Central Customs Authority of Departure of Data on Completion of Action of Customs Procedure of Customs Transit" (P.CP.01.OPR.056)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.056 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of departure of data on completion of action of customs procedure of customs transit |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt of data by the contractor |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of data on completion of action of customs procedure of customs transit, creates |
|
7 |
Results |
data on completion of action of customs procedure of customs transit are processed, the notification on processing of data on completion of action of customs procedure of customs transit is sent to the central customs authority of appointment |
Table 72
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Departure of Data on Completion of Action of Customs Procedure of Customs Transit" (P.CP.01.OPR.057)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.057 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of departure of data |
|
3 |
Contractor |
central customs authority of appointment |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of data on completion of action of customs procedure of customs transit (transaction "Acceptance and processing |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of data on completion of action of customs procedure of customs transit according to Regulations of information exchange when implementing transit |
|
7 |
Results |
the notification on processing of data on completion of action of customs procedure of customs transit is processed |
Table 73
Activity description "Submission to the Central Customs Authority of Registration of the Certificate of Data on Completion of Action of Customs Procedure of Customs Transit" (P.CP.01.OPR.058)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.058 |
|
2 |
Name of transaction |
submission to the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit |
|
3 |
Contractor |
central customs authority of appointment |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of data on completion of action of customs procedure of customs transit in case of use of the certificate of providing as the document confirming provision of ensuring payment of customs duties, taxes in case of release of goods according to customs procedure of customs transit |
|
5 |
Restrictions |
the format and structure of data on completion of action of customs procedure of customs transit shall match the Description of formats |
|
6 |
Activity description |
the contractor creates and represents data |
|
7 |
Results |
data on completion of action of customs procedure of customs transit are provided |
Table 74
Activity description "Acceptance and Processing in the Central Customs Authority of Registration of the Certificate of Data on Completion of Action of Customs Procedure of Customs Transit" (P.CP.01.OPR.059)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.059 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit |
|
3 |
Contractor |
central customs authority of registration of the certificate |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt of data by the contractor |
|
5 |
Restrictions |
the format and structure of the provided data shall match the Description of formats |
|
6 |
Activity description |
the contractor performs acceptance and processing of data on completion of action of customs procedure of customs transit, creates |
|
7 |
Results |
data on completion of action of customs procedure of customs transit are processed, the notification on processing of data on completion of action of customs procedure of customs transit is sent to the central customs authority of appointment |
Table 75
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Registration of the Certificate of Data on Completion of Action of Customs Procedure of Customs Transit" (P.CP.01.OPR.060)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.060 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of registration of the certificate of data on completion of action of customs procedure of customs transit |
|
3 |
Contractor |
central customs authority of appointment |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of data on completion of action of customs procedure of customs transit (transaction "Acceptance and processing |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of data on completion of action of customs procedure of customs transit according to Regulations of information exchange when implementing transit |
|
7 |
Results |
the notification on processing of data on completion of action of customs procedure of customs transit is processed |
"Change of Data on Completion of Action of Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.008)
121. The scheme of accomplishment of the "Change of Data on Completion of Action of Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.008) is provided in the figure 14.
Fig. 14. Scheme of accomplishment of the "Change of Data on Completion of Action of Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.008)
122. The "Change of Data on Completion of Action of Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.008) is performed by the central customs authority of appointment after modification of data on completion of action of customs procedure of customs transit provided that the "Informing on Completion of Action of Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.007) is executed successfully. In case of accomplishment of the "Change of Data on Completion of Action of Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.008) the central customs authority of appointment represents the changed data on completion of action of customs procedure of customs transit to the central customs authorities to which data on completion of action of customs procedure of customs transit in case of accomplishment of the "Informing on Completion of Action of Customs Procedure of Customs Transit" procedure are provided (P.CP.01.PRC.007).
123. The first carries out transaction "Submission to the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit" (which P.CP.01.OPR.061) by results of accomplishment the central customs authority of appointment creates and represents the changed data on completion of action of customs procedure of customs transit to the central customs authority of departure.
124. When obtaining by the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit transaction "Acceptance and processing in the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit" is carried out (P.CP.01.OPR.062) by results of which accomplishment acceptance and processing of the specified data are performed. In the central customs authority of appointment, the notification on processing of the changed data on completion of action of customs procedure of customs transit goes.
125. When obtaining by the central customs authority of purpose of the notification on processing of the changed data on completion of action of customs procedure of customs transit transaction "Receipt of the notification on processing in the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit" is carried out (P.CP.01.OPR.063) by results of which accomplishment acceptance and processing of the specified notification are performed.
126. Transaction "Submission to the central customs authority of registration of the certificate of the changed data on completion of action of customs procedure of customs transit" (P.CP.01.OPR.064) is carried out provided that data on completion of action of customs procedure of customs transit are provided to the central customs authority of registration of the certificate. By results of transaction accomplishment the central customs authority of appointment creates and represents the changed data on completion of action of customs procedure of customs transit to the central customs authority of registration of the certificate.
127. When obtaining by the central customs authority of registration of the certificate of the changed data on completion of action of customs procedure of customs transit transaction "Acceptance and processing in the central customs authority of registration of the certificate of the changed data on completion of action of customs procedure of customs transit" is carried out (P.CP.01.OPR.065) by results of which accomplishment acceptance and processing of the specified data are performed. In the central customs authority of appointment, the notification on processing of the changed data on completion of action of customs procedure of customs transit goes.
128. When obtaining by the central customs authority of purpose of the notification on processing of the changed data on completion of action of customs procedure of customs transit transaction "Receipt of the notification on processing in the central customs authority of registration of the certificate of the changed data on completion of action of customs procedure of customs transit" is carried out (P.CP.01.OPR.066) by results of which accomplishment acceptance and processing of the specified notification are performed.
129. Result of accomplishment of the "Change of Data on Completion of Action of Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.008) is processing of the changed data on completion of action of customs procedure of customs transit by all central customs authorities to which the specified data are provided.
130. The list of the transactions of general process which are carried out within the "Change of Data on Completion of Action of Customs Procedure of Customs Transit" procedure (P.CP.01.PRC.008), is given in table 76.
Table 76
The list of the transactions of general process which are carried out within the procedure "Change of data on completion of action of customs procedure of customs transit" (P.CP.01.PRC.008)
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.OPR.061 |
submission to the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit |
it is provided in table 77 of these rules |
|
P.CP.01.OPR.062 |
acceptance and processing in the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit |
it is provided in table 78 of these rules |
|
P.CP.01.OPR.063 |
receipt of the notification on processing in the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit |
it is provided in table 79 of these rules |
|
P.CP.01.OPR.064 |
submission to the central customs authority of registration of the certificate of the changed data |
it is provided in table 80 of these rules |
|
P.CP.01.OPR.065 |
acceptance and processing in the central customs authority of registration of the certificate of the changed data |
it is provided in table 81 of these rules |
|
P.CP.01.OPR.066 |
receipt of the notification on processing in the central customs authority of registration of the certificate of the changed data about completion of action of customs procedure of customs transit |
it is provided in table 82 of these rules |
Table 77
Activity description "Submission to the Central Customs Authority of Departure of the Changed Data on Completion of Action of Customs Procedure of Customs Transit" (P.CP.01.OPR.061)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.061 |
|
2 |
Name of transaction |
submission to the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit |
|
3 |
Contractor |
central customs authority of appointment |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of the changed data |
|
5 |
Restrictions |
format and structure of the changed data |
|
6 |
Activity description |
the contractor creates and represents the changed data on completion of action of customs procedure of customs transit to the central customs authority of departure in compliance |
|
7 |
Results |
the changed data on completion of action of customs procedure of customs transit are provided to the central customs authority of departure |
Table 78
Activity description "Acceptance and Processing in the Central Customs Authority of Departure of the Changed Data on Completion of Action of Customs Procedure of Customs Transit" (P.CP.01.OPR.062)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.062 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out when obtaining by the contractor of the changed data on completion of action of customs procedure of customs transit (transaction "Submission to the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit" (P.CP.01.OPR.062)) |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of the changed data on completion of action of customs procedure of customs transit, creates and sends the notification on processing of the changed data on completion of action of customs procedure of customs transit to the central customs authority of appointment |
|
7 |
Results |
the changed data on completion of action of customs procedure of customs transit are processed, the notification on processing of the changed data on completion of action of customs procedure of customs transit is directed |
Table 79
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Departure of the Changed Data on Completion of Action of Customs Procedure of Customs Transit" (P.CP.01.OPR.063)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.063 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of departure of the changed data on completion of action of customs procedure of customs transit |
|
3 |
Contractor |
central customs authority of appointment |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of the changed data |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of the changed data |
|
7 |
Results |
the notification on processing of the changed data |
Table 80
Activity description "Submission to the Central Customs Authority of Registration of the Certificate of the Changed Data on Completion of Action of Customs Procedure of Customs Transit" (P.CP.01.OPR.064)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.064 |
|
2 |
Name of transaction |
submission to the central customs authority of registration of the certificate of the changed data |
|
3 |
Contractor |
central customs authority of appointment |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of the changed data |
|
5 |
Restrictions |
format and structure of the changed data |
|
6 |
Activity description |
the contractor creates and represents the changed data on completion of action of customs procedure of customs transit to the central customs authority of registration of the certificate |
|
7 |
Results |
the changed data on completion of action of customs procedure of customs transit are provided to the central customs authority of registration of the certificate |
Table 81
Activity description "Acceptance and Processing in the Central Customs Authority of Registration of the Certificate of the Changed Data on Completion of Action of Customs Procedure of Customs Transit" (P.CP.01.OPR.065)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.065 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of registration of the certificate of the changed data |
|
3 |
Contractor |
central customs authority of registration of the certificate |
|
4 |
Accomplishment conditions |
it is carried out when obtaining by the contractor of the changed data on completion of action of customs procedure of customs transit (transaction "Submission to the central customs authority of registration of the certificate of the changed data on completion of action of customs procedure of customs transit" (P.CP.01.OPR.064)) |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of the changed data on completion of action of customs procedure of customs transit, creates and sends the notification on processing of the changed data on completion of action of customs procedure of customs transit to the central customs authority of appointment |
|
7 |
Results |
the changed data on completion of action of customs procedure of customs transit are processed, the notification on processing of the changed data on completion of action of customs procedure of customs transit is directed |
Table 82
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Registration of the Certificate of the Changed Data on Completion of Action of Customs Procedure of Customs Transit" (P.CP.01.OPR.066)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.066 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of registration of the certificate of the changed data on completion of action of customs procedure of customs transit |
|
3 |
Contractor |
central customs authority of appointment |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of the changed data |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of the changed data |
|
7 |
Results |
the notification on processing of the changed data about completion of action of customs procedure of customs transit it is processed |
"Informing on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" procedure (P.CP.01.PRC.009)
131. The scheme of accomplishment of the "Informing on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" procedure (P.CP.01.PRC.009) is provided in the figure 15.
Fig. 15. Scheme of accomplishment of the "Informing on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" procedure (P.CP.01.PRC.009)
132. The "Informing on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" procedure (P.CP.01.PRC.009) is performed in case of completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union. After fixing in information system of the central customs authority of departure of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union, the central customs authority, departures represents the specified data to the central customs authority of appointment.
133. The first carries out transaction "Submission to the central customs authority of purpose of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union" (P.CP.01.OPR.067) by results of which accomplishment the central customs authority of departure creates and represents to the central customs authority of purpose of the data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union.
134. When obtaining by the central customs authority of purpose of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union transaction "Acceptance and processing is carried out
in the central customs authority of purpose of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union" (P.CP.01.OPR.068) by results of which accomplishment acceptance and processing of the specified data are performed. In the central customs authority of departure, the notification on processing of data on completion of action of customs procedure of customs transit in case of return of goods of the Union goes to customs area of the Union.
135. When obtaining by the central customs authority of departure of the notification on processing of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union transaction "Receipt of the notification on processing in the central customs authority of purpose of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union" is carried out (P.CP.01.OPR.069) by results of which accomplishment acceptance and processing of the specified notification are performed.
136. Result of accomplishment of the "Informing on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" procedure (P.CP.01.PRC.009) is processing of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union in the central customs authority of appointment.
137. The list of the transactions of general process which are carried out within the "Informing on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" procedure (P.CP.01.PRC.009), is given in table 83.
Table 83
The list of the transactions of general process which are carried out within the procedure "Informing on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union" (P.CP.01.PRC.009)
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.OPR.067 |
submission to the central customs authority of purpose of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union |
it is provided in table 84 of these rules |
|
P.CP.01.OPR.068 |
acceptance and processing in the central customs authority of purpose of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union |
it is provided in table 85 of these rules |
|
P.CP.01.OPR.069 |
receipt of the notification on processing in the central customs authority of purpose of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union |
it is provided in table 86 of these rules |
Table 84
Activity description "Submission to the Central Customs Authority of Purpose of Data on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" (P.CP.01.OPR.067)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.067 |
|
2 |
Name of transaction |
submission to the central customs authority of purpose of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union |
|
5 |
Restrictions |
the format and structure of data on completion of action of customs procedure of customs transit shall match the Description of formats |
|
6 |
Activity description |
the contractor creates and represents data |
|
7 |
Results |
data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union are provided to the central customs authority of appointment |
Table 85
Activity description "Acceptance and Processing in the Central Customs Authority of Purpose of Data on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" (P.CP.01.OPR.068)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.068 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of purpose of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union |
|
3 |
Contractor |
central customs authority of appointment |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt of data by the contractor |
|
5 |
Restrictions |
the format and structure of the provided data shall match the Description of formats |
|
6 |
Activity description |
the contractor performs acceptance and processing of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union, creates and sends to the central customs authority of departure the notification on processing of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union |
|
7 |
Results |
data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union are processed, the notification on processing of data |
Table 86
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Purpose of Data on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" (P.CP.01.OPR.069)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.069 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of purpose of data |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union (transaction "Acceptance and processing in the central customs authority of purpose of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union" (P.CP.01.OPR.068)) |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union according to Regulations of information exchange when implementing transit |
|
7 |
Results |
the notification on processing of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union is processed |
"Change of Data on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" procedure (P.CP.01.PRC.010)
138. The scheme of accomplishment of the "Change of Data on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" procedure (P.CP.01.PRC.010) is provided in the figure 16.
Fig. 16. Scheme of accomplishment of the "Change of Data on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" procedure (P.CP.01.PRC.010)
139. The "Change of Data on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" procedure (P.CP.01.PRC.010) is performed by the central customs authority after modification of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union provided that the "Informing on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" procedure (P.CP.01.PRC.009) is executed successfully.
140. The first carries out transaction "Submission to the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union" (P.CP.01.OPR.070) by results of which accomplishment the central customs authority of departure creates and represents to the central customs authority of appointment the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union.
141. When obtaining by the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union transaction "Acceptance and processing in the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union" is carried out (P.CP.01.OPR.071) by results of which accomplishment acceptance and processing of the specified data are performed. In the central customs authority of departure, the notification on processing of the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union goes to customs area of the Union.
142. When obtaining by the central customs authority of departure of the notification on processing of the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union transaction "Receipt of the notification on processing in the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union" is carried out (P.CP.01.OPR.072) by results of which accomplishment acceptance and processing of the specified notification are performed.
143. Result of accomplishment of the "Change of Data on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" procedure (P.CP.01.PRC.010) is processing of the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union in the central customs authority of appointment.
144. The list of the transactions of general process which are carried out within the "Change of Data on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" procedure (P.CP.01.PRC.010), is given in table 87.
Table 87
The list of the transactions of general process which are carried out within the procedure "Change of data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union" (P.CP.01.PRC.010)
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.OPR.070 |
submission to the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union |
it is provided in table 88 of these rules |
|
P.CP.01.OPR.071 |
acceptance and processing in the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union |
it is provided in table 89 of these rules |
|
P.CP.01.OPR.072 |
receipt of the notification on processing in the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union |
it is provided in table 90 of these rules |
Table 88
Activity description "Submission to the Central Customs Authority of Purpose of the Changed Data on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" (P.CP.01.OPR.070)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.070 |
|
2 |
Name of transaction |
submission to the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of the changed data |
|
5 |
Restrictions |
format and structure of the changed data |
|
6 |
Activity description |
the contractor creates and represents the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union |
|
7 |
Results |
the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union are provided to the central customs authority of appointment |
Table 89
Activity description "Acceptance and Processing in the Central Customs Authority of Purpose of the Changed Data on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" (P.CP.01.OPR.071)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.071 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union |
|
3 |
Contractor |
central customs authority of appointment |
|
4 |
Accomplishment conditions |
it is carried out when obtaining by the contractor of the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union (transaction "Submission of the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of the changed data on completion of action of customs procedure of customs transit, in case of return of goods of the Union on customs area of the Union creates and sends to the central customs authority of departure the notification on processing of the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union |
|
7 |
Results |
the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union are processed, the notification on processing of the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union on customs area of the Union is sent to the central customs authority of departure |
Table 90
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Purpose of the Changed Data on Completion of Action of Customs Procedure of Customs Transit in case of Return of Goods of the Union on Customs Area of the Union" (P.CP.01.OPR.072)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.072 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of purpose of the changed data on completion of action of customs procedure of customs transit in case of return of goods of the Union |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of the changed data |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of the changed data |
|
7 |
Results |
the notification on processing of the changed data |
"Informing on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.011)
145. The scheme of accomplishment of the "Informing on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.011) is provided
in the figure 17.
Fig. 17. Scheme of accomplishment of the "Informing on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.011)
146. The "Informing on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.011) is performed in case of decision making about prolongation of term of customs transit. After fixing in information system of the central customs authority making unplanned earlier customs activities, data on prolongation of term of customs transit concerning the goods placed under customs procedure of customs transit, the central customs authority making unplanned earlier customs activities represents the specified data to the central customs authorities of other state members. The list of participants of information exchange in case of accomplishment of the "Informing on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.011) is determined by conditions of accomplishment of separate transactions of the procedure of general process.
147. Transaction "Submission to the central customs authority of departure of data on prolongation of term of customs transit" (P.CP.01.OPR.073) is carried out provided that the region (zone) of activities of the central customs authority making unplanned earlier customs activities does not match with the region (zone) of activities of the central customs authority of departure. By results of transaction accomplishment the central customs authority making unplanned earlier customs activities creates and represents to the central customs authority of departure of the data on prolongation of term of customs transit.
148. When obtaining by the central customs authority of departure of data on prolongation of term of customs transit transaction "Acceptance and processing in the central customs authority of departure of data on prolongation of term of customs transit" is carried out (P.CP.01.OPR.074) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of data on prolongation of term of customs transit goes to the central customs authority making unplanned earlier customs activities.
149. When obtaining by the central customs authority making unplanned earlier customs activities, notifications on processing of data on prolongation of term of customs transit transaction "Receipt of the notification on processing in the central customs authority of departure of data on prolongation of term of customs transit" is carried out (P.CP.01.OPR.075) by results of which accomplishment acceptance and processing of the specified notification are performed.
150. Transaction "Submission to the central customs authority of purpose of data on prolongation of term of customs transit" (P.CP.01.OPR.076) is carried out provided that the region (zone) of activities of the central customs authority making unplanned earlier customs activities does not match with the region (zone) of activities of the central customs authority of appointment. By results of transaction accomplishment the central customs authority making unplanned earlier customs activities creates and represents to the central customs authority of purpose of the data on prolongation of term of customs transit.
151. When obtaining by the central customs authority of purpose of data on prolongation of term of customs transit transaction "Acceptance and processing in the central customs authority of purpose of data on prolongation of term of customs transit" is carried out (P.CP.01.OPR.077) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of data on prolongation of term of customs transit goes to the central customs authority making unplanned earlier customs activities.
152. When obtaining by the central customs authority making unplanned earlier customs activities, notifications on processing of data on prolongation of term of customs transit transaction "Receipt of the notification on processing in the central customs authority of purpose of data on prolongation of term of customs transit" is carried out (P.CP.01.OPR.078) by results of which accomplishment acceptance and processing of the specified notification are performed.
153. Transaction "Submission to the central intermediate customs authority of data on prolongation of term of customs transit" (P.CP.01.OPR.079) is carried out provided that data on release of goods contain information customs authorities in which confirmation of observance of the established transportation route is planned (taking into account the changes made to route of transportation (transportation) of goods), and (or) about customs authorities in which implementation of cargo operations is planned, and the specified customs authorities are out of the region (zone) of activities of the central intermediate customs authority making unplanned earlier customs activities. By results of transaction accomplishment the central customs authority making unplanned earlier customs activities creates and represents to the central intermediate customs authority of the data on prolongation of term of customs transit. Transaction "Submission to the central intermediate customs authority of data on prolongation of term of customs transit" (P.CP.01.OPR.079) is carried out for each central intermediate customs authority meeting transaction accomplishment condition.
154. When obtaining by the central intermediate customs authority, data on prolongation of term of customs transit transaction "Acceptance and processing in the central intermediate customs authority of data on prolongation of term of customs transit" is carried out (P.CP.01.OPR.080) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of data on prolongation of term of customs transit goes to the central customs authority making unplanned earlier customs activities.
155. When obtaining by the central customs authority making unplanned earlier customs activities, notifications on processing of data on prolongation of term of customs transit transaction "Receipt of the notification on processing in the central intermediate customs authority of data on prolongation of term of customs transit" is carried out (P.CP.01.OPR.081) by results of which accomplishment acceptance and processing of the specified notification are performed.
156. Result of accomplishment of the "Informing on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.011) is processing of data on prolongation of term of customs transit by all central customs authorities to which the specified data are provided.
157. The list of the transactions of general process which are carried out within the "Informing on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.011), is given in table 91.
Table 91
The list of the transactions of general process which are carried out within the procedure "Informing on prolongation of term of customs transit" (P.CP.01.PRC.011)
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.OPR.073 |
submission to the central customs authority of departure of data on prolongation of term of customs transit |
it is provided in table 92 of these rules |
|
P.CP.01.OPR.074 |
acceptance and processing in the central customs authority of departure of data on prolongation of term of customs transit |
it is provided in table 93 of these rules |
|
P.CP.01.OPR.075 |
receipt of the notification on processing in the central customs authority of departure of data on prolongation of term of customs transit |
it is provided in table 94 of these rules |
|
P.CP.01.OPR.076 |
submission to the central customs authority of purpose of data on prolongation of term of customs transit |
it is provided in table 95 of these rules |
|
P.CP.01.OPR.077 |
acceptance and processing in the central customs authority of purpose of data on prolongation of term of customs transit |
it is provided in table 96 of these rules |
|
P.CP.01.OPR.078 |
receipt of the notification on processing in the central customs authority of purpose of data on prolongation of term of customs transit |
it is provided in table 97 of these rules |
|
P.CP.01.OPR.079 |
submission to the central intermediate customs authority of data on prolongation of term of customs transit |
it is provided in table 98 of these rules |
|
P.CP.01.OPR.080 |
acceptance and processing in the central intermediate customs authority of data on prolongation of term of customs transit |
it is provided in table 99 of these rules |
|
P.CP.01.OPR.081 |
receipt of the notification on processing in the central intermediate customs authority of data on prolongation of term of customs transit |
it is provided in table 100 of these rules |
Table 92
Activity description "Submission to the Central Customs Authority of Departure of Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.073)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.073 |
|
2 |
Name of transaction |
submission to the central customs authority of departure of data on prolongation of term of customs transit |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of data on prolongation of term of customs transit provided that the region (zone) of activities of the contractor does not match with the region (zone) of activities of the central customs authority of departure |
|
5 |
Restrictions |
the format and structure of data on prolongation of term of customs transit shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor creates and represents data |
|
7 |
Results |
data on prolongation of term of customs transit are provided to the central customs authority of departure |
Table 93
Activity description "Acceptance and Processing in the Central Customs Authority of Departure of Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.074)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.074 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of departure of data on prolongation of term of customs transit |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt of data by the contractor prolongation of term of customs transit (transaction "Submission to the central customs authority of departure of data on prolongation of term of customs transit" (P.CP.01.OPR.073)) |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of data on prolongation of term of customs transit, creates and sends to the central customs authority making unplanned earlier customs activities, the notification on processing of data on prolongation of term of customs transit |
|
7 |
Results |
data on prolongation of term of customs transit are processed, the notification on processing of data |
Table 94
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Departure of Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.075)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.075 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of departure of data |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of data on prolongation of term of customs transit (transaction "Acceptance |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of data on prolongation of term of customs transit in compliance |
|
7 |
Results |
the notification on processing of data on prolongation of term of customs transit is processed |
Table 95
Activity description "Submission to the Central Customs Authority of Purpose of Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.076)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.076 |
|
2 |
Name of transaction |
submission to the central customs authority of purpose of data on prolongation of term of customs transit |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of data on prolongation of term of customs transit provided that the region (zone) of activities of the contractor does not match with the region (zone) of activities of the central customs authority of appointment |
|
5 |
Restrictions |
the format and structure of data on prolongation of term of customs transit shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor creates and predstalyat data |
|
7 |
Results |
data on prolongation of term of customs transit are provided to the central customs authority of appointment |
Table 96
Activity description "Acceptance and Processing in the Central Customs Authority of Purpose of Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.077)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.077 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of purpose of data on prolongation of term of customs transit |
|
3 |
Contractor |
central customs authority of appointment |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt of data by the contractor |
|
5 |
Restrictions |
the format and structure of the provided data shall match the Description of formats |
|
6 |
Activity description |
the contractor performs acceptance and processing of data on prolongation of term of customs transit, creates and sends to the central customs authority making unplanned earlier customs activities, the notification on processing of data on prolongation of term of customs transit |
|
7 |
Results |
data on prolongation of term of customs transit are processed, the notification on processing of data |
Table 97
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Purpose of Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.078)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.078 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of purpose of data on prolongation of term of customs transit |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of data on prolongation of term of customs transit (transaction "Acceptance |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of data on prolongation of term of customs transit, in compliance |
|
7 |
Results |
the notification on processing of data on prolongation of term of customs transit is processed |
Table 98
Activity description "Submission to the Central Intermediate Customs Authority of Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.079)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.079 |
|
2 |
Name of transaction |
submission to the central intermediate customs authority of data on prolongation of term of customs transit |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of data on prolongation of term of customs transit provided that data |
|
5 |
Restrictions |
the format and structure of data on prolongation of term of customs transit shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor creates and represents data |
|
7 |
Results |
data on prolongation of term of customs transit are provided to the central intermediate customs authority |
Table 99
Activity description "Acceptance and Processing in the Central Intermediate Customs Authority of Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.080)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.080 |
|
2 |
Name of transaction |
acceptance and processing in the central intermediate customs authority of data on prolongation of term of customs transit |
|
3 |
Contractor |
central intermediate customs authority |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt of data by the contractor |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of data on prolongation of term of customs transit, creates and sends to the central customs authority making unplanned earlier customs activities, the notification on processing of data on prolongation of term of customs transit |
|
7 |
Results |
data on prolongation of term of customs transit are processed, the notification on processing of data |
Table 100
Activity description "Receipt of the Notification on Processing in the Central Intermediate Customs Authority of Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.081)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.081 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central intermediate customs authority of data |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of data on prolongation of term of customs transit (transaction "Acceptance |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of data on prolongation of term of customs transit in compliance |
|
7 |
Results |
the notification on processing of data on prolongation of term of customs transit is processed |
"Change of Data on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.012)
158. The scheme of accomplishment of the "Change of Data on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.012) is provided in the figure 18.
Fig. 18. Scheme of accomplishment of the "Change of Data on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.012)
159. The "Change of Data on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.012) is performed by the central customs authority making unplanned earlier customs activities after modification of data on prolongation of term of customs transit provided that the "Informing on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.011) is executed successfully. In case of accomplishment of the "Change of Data on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.012) the central customs authority making unplanned earlier customs activities represents the changed data on prolongation of term of customs transit to the central customs authorities to which data on prolongation of term of customs transit in case of accomplishment of the "Informing on Prolongation of Term of Customs Transit" procedure are provided (P.CP.01.PRC.011).
160. Transaction "Submission to the central customs authority of departure of the changed data on prolongation of term of customs transit" (P.CP.01.OPR.082) is carried out provided that data on prolongation of term of customs transit are provided to the central customs authority of departure. By results of transaction accomplishment the central customs authority making unplanned earlier customs activities creates and represents the changed data on prolongation of term of customs transit to the central customs authority of departure.
161. When obtaining by the central customs authority of departure of the changed data on prolongation of term of customs transit transaction "Acceptance and processing in the central customs authority of departure of the changed data on prolongation of term of customs transit" is carried out (P.CP.01.OPR.083) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of the changed data on prolongation of term of customs transit goes to the central customs authority making unplanned earlier customs activities.
162. When obtaining by the central customs authority making unplanned earlier customs activities, notifications on processing of the changed data on prolongation of term of customs transit transaction "Receipt of the notification on processing in the central customs authority of departure of the changed data on prolongation of term of customs transit" is carried out (P.CP.01.OPR.084) by results of which accomplishment acceptance and processing of the specified notification are performed.
163. Transaction "Submission to the central customs authority of purpose of the changed data on prolongation of term of customs transit" (P.CP.01.OPR.085) is carried out provided that data on prolongation of term of customs transit are provided to the central customs authority of appointment. By results of transaction accomplishment the central customs authority making unplanned earlier customs activities creates and represents the changed data on prolongation of term of customs transit to the central customs authority of appointment.
164. In case of receipt of appointment by the central customs authority, the changed data on prolongation of term of customs transit, transaction "Acceptance and processing in the central customs authority of purpose of the changed data on prolongation of term of customs transit" is carried out (P.CP.01.OPR.086) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of the changed data on prolongation of term of customs transit goes to the central customs authority making unplanned earlier customs activities.
165. When obtaining by the central customs authority making unplanned earlier customs activities, notifications on processing of the changed data on prolongation of term of customs transit transaction "Receipt of the notification on processing in the central customs authority of purpose of the changed data on prolongation of term of customs transit" is carried out (P.CP.01.OPR.087) by results of which accomplishment acceptance and processing of the specified notification are performed.
166. Transaction "Submission to the central intermediate customs authority of the changed data on prolongation of term of customs transit" (P.CP.01.OPR.088) is carried out provided that data on prolongation of term of customs transit are provided to the central intermediate customs authority. By results of transaction accomplishment the central customs authority making unplanned earlier customs activities creates and represents the changed data on prolongation of term of customs transit to the central intermediate customs authority. Transaction "Submission to the central intermediate customs authority of the changed data on prolongation of term of customs transit" (P.CP.01.OPR.088) is carried out for each central intermediate customs authority meeting transaction accomplishment condition.
167. When obtaining by the central intermediate customs authority, the changed data on prolongation of term of customs transit, transaction "Acceptance and processing in the central intermediate customs authority of the changed data on prolongation of term of customs transit" is carried out (P.CP.01.OPR.089) by results of which accomplishment acceptance and processing of the specified data are performed. The notification on processing of the changed data on prolongation of term of customs transit goes to the central customs authority making unplanned earlier customs activities.
168. When obtaining by the central customs authority making unplanned earlier customs activities, notifications on processing of the changed data on prolongation of term of customs transit transaction "Receipt of the notification on processing in the central intermediate customs authority of the changed data on prolongation of term of customs transit" is carried out (P.CP.01.OPR.090) by results of which accomplishment acceptance and processing of the specified notification are performed.
169. Result of accomplishment of the "Change of Data on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.012) is processing of the changed data on prolongation of term of customs transit by all central customs authorities to which the specified data are provided.
170. The list of the transactions of general process which are carried out within the "Change of Data on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.012), is given in table 101.
Table 101
The list of the transactions of general process which are carried out within the procedure "Change of data on prolongation of term of customs transit" (P.CP.01.PRC.012)
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.OPR.082 |
submission to the central customs authority of departure of the changed data on prolongation of term of customs transit |
it is provided in table 102 of these rules |
|
P.CP.01.OPR.083 |
acceptance and processing in the central customs authority of departure of the changed data on prolongation of term of customs transit |
it is provided in table 103 of these rules |
|
P.CP.01.OPR.084 |
receipt of the notification on processing in the central customs authority of departure of the changed data on prolongation of term of customs transit |
it is provided in table 104 of these rules |
|
P.CP.01.OPR.085 |
submission to the central customs authority of purpose of the changed data on prolongation of term of customs transit |
it is provided in table 105 of these rules |
|
P.CP.01.OPR.086 |
acceptance and processing in the central customs authority of purpose of the changed data on prolongation of term of customs transit |
it is provided in table 106 of these rules |
|
P.CP.01.OPR.087 |
receipt of the notification on processing in the central customs authority of purpose of the changed data on prolongation of term of customs transit |
it is provided in table 107 of these rules |
|
P.CP.01.OPR.088 |
submission to the central intermediate customs authority of the changed data on prolongation of term of customs transit |
it is provided in table 108 of these rules |
|
P.CP.01.OPR.089 |
acceptance and processing in the central intermediate customs authority of the changed data on prolongation of term of customs transit |
it is provided in table 109 of these rules |
|
P.CP.01.OPR.090 |
receipt of the notification on processing in the central intermediate customs authority of the changed data on prolongation of term of customs transit |
it is provided in table 110 of these rules |
Table 102
Activity description "Submission to the Central Customs Authority of Departure of the Changed Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.082)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.082 |
|
2 |
Name of transaction |
submission to the central customs authority of departure of the changed data on prolongation of term of customs transit |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of the changed data |
|
5 |
Restrictions |
format and structure of the changed data |
|
6 |
Activity description |
the contractor creates and represents the changed data on prolongation of term of customs transit |
|
7 |
Results |
the changed data on prolongation of term of customs transit are provided to the central customs authority of departure |
Table 103
Activity description "Acceptance and Processing in the Central Customs Authority of Departure of the Changed Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.083)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.083 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of departure of the changed data on prolongation of term of customs transit |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out when obtaining by the contractor of the changed data on prolongation of term of customs transit (transaction "Representation |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of the changed data on prolongation of term of customs transit, creates and directs |
|
7 |
Results |
the changed data on prolongation of term of customs transit are processed, the notification on processing of the changed data on prolongation of term of customs transit is sent to the central customs authority making unplanned earlier customs activities |
Table 104
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Departure of the Changed Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.084)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.084 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of departure of the changed data on prolongation of term of customs transit |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of the changed data |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of the changed data |
|
7 |
Results |
the notification on processing of the changed data |
Table 105
Activity description "Submission to the Central Customs Authority of Purpose of the Changed Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.085)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.085 |
|
2 |
Name of transaction |
submission to the central customs authority of purpose of the changed data on prolongation of term of customs transit |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of the changed data |
|
5 |
Restrictions |
format and structure of the changed data |
|
6 |
Activity description |
the contractor creates and represents the changed data on prolongation of term of customs transit |
|
7 |
Results |
the changed data on prolongation of term of customs transit are provided to the central customs authority of appointment |
Table 106
Activity description "Acceptance and Processing in the Central Customs Authority of Purpose of the Changed Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.086)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.086 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of purpose of the changed data on prolongation of term of customs transit |
|
3 |
Contractor |
central customs authority of appointment |
|
4 |
Accomplishment conditions |
it is carried out when obtaining by the contractor of the changed data on prolongation of term of customs transit (transaction "Representation |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of the changed data on prolongation of term of customs transit, creates and directs |
|
7 |
Results |
the changed data on prolongation of term of customs transit are processed, the notification on processing of the changed data on prolongation of term of customs transit is sent to the central customs authority making unplanned earlier customs activities |
Table 107
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Purpose of the Changed Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.087)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.087 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of purpose of the changed data on prolongation of term of customs transit |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of the changed data |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of the changed data |
|
7 |
Results |
the notification on processing of the changed data |
Table 108
Activity description "Submission to the Central Intermediate Customs Authority of the Changed Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.088)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.088 |
|
2 |
Name of transaction |
submission to the central intermediate customs authority of the changed data on prolongation of term of customs transit |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of the changed data |
|
5 |
Restrictions |
format and structure of the changed data |
|
6 |
Activity description |
the contractor creates and represents the changed data on prolongation of term of customs transit |
|
7 |
Results |
the changed data on prolongation of term of customs transit are provided to the central intermediate customs authority |
Table 109
Activity description "Acceptance and Processing in the Central Intermediate Customs Authority of the Changed Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.089)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.089 |
|
2 |
Name of transaction |
acceptance and processing in the central intermediate customs authority of the changed data |
|
3 |
Contractor |
central intermediate customs authority |
|
4 |
Accomplishment conditions |
it is carried out when obtaining by the contractor of the changed data on prolongation of term of customs transit (transaction "Representation |
|
5 |
Restrictions |
the format and structure of data shall match the Description of formats and structures of electronic documents and data. Details of the electronic document (data) shall conform to the requirements provided by Regulations of information exchange when implementing transit |
|
6 |
Activity description |
the contractor performs acceptance and processing of the changed data on prolongation of term of customs transit, creates and directs |
|
7 |
Results |
the changed data on prolongation of term of customs transit are processed, the notification |
Table 110
Activity description "Receipt of the Notification on Processing in the Central Intermediate Customs Authority of the Changed Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.090)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.090 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central intermediate customs authority of the changed data on prolongation of term of customs transit |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on processing of the changed data |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on processing of the changed data |
|
7 |
Results |
the notification on processing of the changed data |
"Cancellation of Data on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.013)
171. The scheme of accomplishment of the "Cancellation of Data on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.013) is provided in the figure 19.
Fig. 19. Scheme of accomplishment of the "Cancellation of Data on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.013)
172. The "Cancellation of Data on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.013) is performed by the central customs authority making unplanned earlier customs activities in need of cancellation of earlier directed data on prolongation of effective period of customs procedure of customs transit provided that the "Informing on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.011) is executed successfully. In case of accomplishment of the procedure the central customs authority making unplanned earlier customs activities provides information on cancellation of data on prolongation of term of customs transit in the central customs authorities to which data on prolongation of term of customs transit in case of accomplishment of the "Informing on Prolongation of Term of Customs Transit" procedure are provided (P.CP.01.PRC.011).
173. Transaction "Submission to the central customs authority of departure of information on cancellation of data on prolongation of term of customs transit" (P.CP.01.OPR.091) is carried out provided that data on prolongation of term of customs transit are provided to the central customs authority of departure. By results of transaction accomplishment the central customs authority making unplanned earlier customs activities creates and provides information on cancellation of data on prolongation of term of customs transit in the central customs authority of departure.
174. When obtaining by the central customs authority of departure of information on cancellation of data on prolongation of term of customs transit transaction "Acceptance and processing in the central customs authority of departure of information on cancellation of data on prolongation of term of customs transit" is carried out (P.CP.01.OPR.092) by results of which accomplishment acceptance and processing of the specified information are performed. The notification on information processing on cancellation of data on prolongation of term of customs transit goes to the central customs authority making unplanned earlier customs activities.
175. When obtaining by the central customs authority making unplanned earlier customs activities, notifications on information processing on cancellation of data on prolongation of term of customs transit transaction "Receipt of the notification on processing in the central customs authority of departure of information on cancellation of data on prolongation of term of customs transit" is carried out (P.CP.01.OPR.093) by results of which accomplishment acceptance and processing of the specified information are performed.
176. Transaction "Submission to the central customs authority of purpose of information on cancellation of data on prolongation of term of customs transit" (P.CP.01.OPR.094) is carried out provided that data on prolongation of term of customs transit are provided to the central customs authority of appointment. By results of transaction accomplishment the central customs authority making unplanned earlier customs activities creates and provides information on cancellation of data on prolongation of term of customs transit in the central customs authority of appointment.
177. In case of receipt of appointment by the central customs authority, information on cancellation of data on prolongation of term of customs transit, transaction "Acceptance and processing in the central customs authority of purpose of information on cancellation of data on prolongation of term of customs transit" is carried out (P.CP.01.OPR.095) by results of which accomplishment acceptance and processing of the specified information are performed. The notification on information processing on cancellation of data on prolongation of term of customs transit goes to the central customs authority making unplanned earlier customs activities.
178. When obtaining by the central customs authority making unplanned earlier customs activities, notifications on information processing on cancellation of data on prolongation of term of customs transit transaction "Receipt of the notification on processing in the central customs authority of purpose of information on cancellation of data on prolongation of term of customs transit" is carried out (P.CP.01.OPR.096) by results of which accomplishment acceptance and processing of the specified notification are performed.
179. Transaction "Submission to the central intermediate customs authority of information on cancellation of data on prolongation of term of customs transit" (P.CP.01.OPR.097) is carried out provided that data on prolongation of term of customs transit are provided to the central intermediate customs authority. By results of transaction accomplishment the central customs authority making unplanned earlier customs activities creates and represents to the central intermediate customs authority about cancellation of data on prolongation of term of customs transit. Transaction "Submission to the central intermediate customs authority of information on cancellation of data on prolongation of term of customs transit" (P.CP.01.OPR.097) is carried out for each central intermediate customs authority meeting transaction accomplishment condition.
180. During the obtaining by the central intermediate customs authority, information on cancellation of data on prolongation of term of customs transit, transaction "Acceptance and processing in the central intermediate customs authority of information on cancellation of data on prolongation of term of customs transit" is carried out (P.CP.01.OPR.098) by results of which accomplishment acceptance and processing of the specified information are performed. The notification on information processing on cancellation of data on prolongation of term of customs transit goes to the central customs authority making unplanned earlier customs activities.
181. When obtaining by the central customs authority making unplanned earlier customs activities, notifications on information processing on cancellation of data on prolongation of term of customs transit transaction "Receipt of the notification on processing in the central intermediate customs authority of information on cancellation of data on prolongation of term of customs transit" is carried out (P.CP.01.OPR.099) by results of which accomplishment acceptance and processing of the specified notification are performed.
182. Result of accomplishment of the "Cancellation of Data on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.013) is information processing about cancellation of data on prolongation of term of customs transit by all central customs authorities in which the specified information is provided.
183. The list of the transactions of general process which are carried out within the "Cancellation of Data on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.013), is given in table 111.
Table 111
The list of the transactions of general process which are carried out within the "Cancellation of Data on Prolongation of Term of Customs Transit" procedure (P.CP.01.PRC.013)
|
Specification symbol |
Name |
Description |
|
1 |
2 |
3 |
|
P.CP.01.OPR.091 |
submission to the central customs authority of departure of information on cancellation of data on prolongation of term of customs transit |
it is provided in table 112 of these rules |
|
P.CP.01.OPR.092 |
acceptance and processing in the central customs authority of departure of information on cancellation of data on prolongation of term of customs transit |
it is provided in table 113 of these rules |
|
P.CP.01.OPR.093 |
receipt of the notification on processing in the central customs authority of departure of information on cancellation of data on prolongation of term of customs transit |
it is provided in table 114 of these rules |
|
P.CP.01.OPR.094 |
submission to the central customs authority of purpose of information on cancellation of data on prolongation of term of customs transit |
it is provided in table 115 of these rules |
|
P.CP.01.OPR.095 |
acceptance and processing in the central customs authority of purpose of information on cancellation of data on prolongation of term of customs transit |
it is provided in table 116 of these rules |
|
P.CP.01.OPR.096 |
receipt of the notification on processing in the central customs authority of purpose of information on cancellation of data on prolongation of term of customs transit |
it is provided in table 117 of these rules |
|
P.CP.01.OPR.097 |
submission to the central intermediate customs authority of information on cancellation of data on prolongation of term of customs transit |
it is provided in table 118 of these rules |
|
P.CP.01.OPR.098 |
acceptance and processing in the central intermediate customs authority of information on cancellation of data on prolongation of term of customs transit |
it is provided in table 119 of these rules |
|
P.CP.01.OPR.099 |
receipt of the notification on processing in the central intermediate customs authority of information on cancellation of data on prolongation of term of customs transit |
it is provided in table 120 of these rules |
Table 112
Activity description "Submission to the Central Customs Authority of Departure of Information on Cancellation of Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.091)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.091 |
|
2 |
Name of transaction |
submission to the central customs authority of departure of information on cancellation of data on prolongation of term of customs transit |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out after fixing in information system of the contractor of information on cancellation of data on prolongation of term of customs transit provided that data on prolongation of term of customs transit are provided to the central customs authority of departure |
|
5 |
Restrictions |
the format and structure of information on cancellation of data on prolongation of term of customs transit shall match the Description of formats |
|
6 |
Activity description |
the contractor creates and provides information on cancellation of data on prolongation of term of customs transit in the central customs authority of departure according to Regulations of information exchange when implementing transit |
|
7 |
Results |
information on cancellation of data on prolongation of term of customs transit is provided |
Table 113
Activity description "Acceptance and Processing in the Central Customs Authority of Departure of Information on Cancellation of Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.092)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.092 |
|
2 |
Name of transaction |
acceptance and processing in the central customs authority of departure of information on cancellation of data on prolongation of term of customs transit |
|
3 |
Contractor |
central customs authority of departure |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of information on cancellation of data on prolongation of term of customs transit (transaction "Submission to the central customs authority of departure of information on cancellation of data on prolongation of term of customs transit" (P.CP.01.OPR.091)) |
|
5 |
Restrictions |
the format and structure of the provided information shall match the Description of formats |
|
6 |
Activity description |
the contractor performs acceptance and information processing about cancellation of data on prolongation of term of customs transit, creates and sends to the central customs authority making unplanned earlier customs activities, the notification on information processing on cancellation of data on prolongation of term of customs transit |
|
7 |
Results |
information on cancellation of data on prolongation of term of customs transit is processed, the notification on information processing on cancellation of data on prolongation of term of customs transit is sent to the central customs authority making unplanned earlier customs activities |
Table 114
Activity description "Receipt of the Notification on Processing in the Central Customs Authority of Departure of Information on Cancellation of Data on Prolongation of Term of Customs Transit" (P.CP.01.OPR.093)
|
№ of payment order |
Designation of element |
Description |
|
1 |
2 |
3 |
|
1 |
Specification symbol |
P.CP.01.OPR.093 |
|
2 |
Name of transaction |
receipt of the notification on processing in the central customs authority of departure of information on cancellation of data on prolongation of term of customs transit |
|
3 |
Contractor |
the central customs authority making unplanned earlier customs activities |
|
4 |
Accomplishment conditions |
it is carried out in case of receipt by the contractor of the notification on information processing about cancellation of data on prolongation of term of customs transit (transaction "Acceptance and processing in the central customs authority of departure of information on cancellation of data on prolongation of term of customs transit" (P.CP.01.OPR.092)) |
|
5 |
Restrictions |
the format and structure of the notification shall match the Description of formats and structures of electronic documents and data |
|
6 |
Activity description |
the contractor performs acceptance and processing of the notification on information processing about cancellation of data on prolongation of term of customs transit according to Regulations of information exchange when implementing transit |
|
7 |
Results |
the notification on information processing on cancellation of data on prolongation of term of customs transit is processed |
Full text is available with an active Subscribtion after logging in.
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Search in text CTRL-F
If you are guest on our site, you will work in Demo mode. In Demo mode you can see only first page of each document.
With full access you can
Database include more 65000 documents. You can find needed documents using search system.
For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions.
This section provides answers to questions set by users.