of June 30, 2021 No. 45
About approval of regulations and rules on ensuring nuclear and radiation safety
Based on item 4 of article 21 of the Law of the Republic of Belarus of June 18, 2019 No. 198-Z "About radiation safety", the paragraph of the fourth of part three of article 6 of the Law of the Republic of Belarus of July 30, 2008 No. 426-Z "About use of atomic energy", subitem 7.4 of Item 7 of the Regulations on the Ministry of Emergency Situations of the Republic of Belarus approved by the Presidential decree of the Republic of Belarus of December 29, 2006 No. 756, the Ministry of Emergency Situations of the Republic of Belarus DECIDES:
1. Approve:
2. This resolution becomes effective after its official publication.
Minister
V. I. Sinyavsky
Approved by the Resolution of the Ministry of Emergency Situations of the Republic of Belarus of June 30, 2021 No. 45
1. Regulations and rules on ensuring nuclear and radiation safety of "Rules for the Construction and Safe Operation of the equipment and pipelines of nuclear power plants" (further – Rules) establish the main technical requirements to safe handling of radiation objects, including to operation of the subjects to use of atomic energy, the device, production, installation, engineering certification and operation working under the excessive, hydrostatic or vakuummetrichesky pressure of the equipment and pipelines of the nuclear power plants (further – the NPP) carried to the A, B and C groups according to Items 5-7 of these rules.
2. Action of these rules, except for carrying out hydraulic, pneumatichydraulic and pneumatic testing by pressure of the equipment and pipelines, extends to production of welded connections of the equipment and pipelines of the A, B and C groups with the details and (or) assembly units which are not working under pressure.
3. Requirements of these rules do not extend on:
the fuel elements and assemblies, working bodies of management system and protection and other designs in cases of reactors, technological and other NPPs channels which are containing sharing, absorbing or slowing down materials;
the pipes and devices which are built in in the equipment or the pipeline of the NPP which destruction does not lead to exit of working environment out of limits of this equipment or pipeline or to leakage through the elements dividing different environments or environment with different parameters;
the mechanical and electric devices located in the equipment;
the devices placed in the equipment or in pipelines for check of their working capacity;
internal metal facing of hermetic barrier, pools of overload and endurance, pools storages of spent nuclear fuel of the NPP;
pipelines and cases of the equipment manufactured of nonmetallic materials;
cases of turbines, gate-type fittings of intermediate overheat of vapor, perepuskny pipelines within the turbine, pipelines of selection of vapor from the turbine to the first shutoff valves, and also elements and nodes of hydraulic system of regulation of the turbine plant of the NPP;
support, suspension brackets, dampers, hydroshock-absorbers and limiters of movements of the equipment and pipelines;
sealing elements of the NPP;
the metalwork located in the equipment and not loaded in the project modes with heat carrier pressure;
the parts of the equipment which are not representing independent vessels;
hydrolocks, pipelines of modulation of tanks, vessels of the NPP working under hydrostatic pressure;
the pipelines of measuring systems and diagnostics, sampling of the NPP relating to safety class elements 3, with nominal internal diameter less than 15 mm;
the equipment and pipelines which are used only during the commissioning, maintenance and repair.
4. For the purposes of these rules terms and their determinations in the values established by the Law of the Republic of Belarus of June 18, 2019 No. 198-Z "About radiation safety", the Law of the Republic of Belarus of July 30, 2008 No. 426-Z "About use of atomic energy", the resolution of Council of Ministers of the Republic of Belarus of February 3, 2021 No. 71 "About measures for implementation of the Presidential decree of the Republic of Belarus of November 30, 2020 No. 447" and also the following terms and their determinations are used:
perished – the knee made of pipe using deformation of bend;
additional production – process of completion of production of the equipment of the NPP which delivery to the platform of the NPP is provided by separate parts under the terms of transportation or installation;
manufacturer – the organization which is carrying out works on production of the equipment and pipelines or assembly units and details for the NPP;
knee – detail or assembly unit of the pipeline in which the direction of flow of working environment changes;
set of samples witnesses – the set of samples witnesses which is at the same time unloaded from the case of the reactor of the NPP;
design documentation – graphical and textual records which in total or separately determine structure and the device of product and contain necessary data for its development, production, control, operation, repair and utilization;
materials – the main materials in the form of semifinished products from staly and alloys (forgings, pipes, sheets, high-quality rolled metal, castings), the welding and naplavochny materials (electrodes, welding and naplavochny wire and tape, gumboils, protective gases) applied to production of the equipment and pipelines and also in case of their installation and repair;
the mounting organization – the organization performing works on installation and production of the equipment and pipelines, and also developing technologies of installation;
the irreplaceable equipment – the equipment which in case of operation of the block of the NPP is not subject to replacement owing to technical impossibility or economic inexpediency;
the equipment – working under pressure (excessive, hydrostatic or vakuummetrichesky) cases of reactors, vessels, heat exchangers, tanks, armature, and also cases of pumps and filters of the NPP;
operational control – control of products or process during execution of or after completion of technological transaction;
designing – development of the complex technical documentation (project) containing feasibility statements, calculations, drawings, prototypes, the estimates, explanatory notes and other documents necessary for equipment manufacturing and pipelines of the NPP;
working pressure – the maximum excessive pressure in the equipment and pipelines in case of normal operation determined taking into account the hydraulic resistance and hydrostatic pressure;
developer – the organization designing and (or) designing the equipment and (or) pipelines;
settlement temperature – temperature of wall of the equipment or pipeline of the NPP equal to the maximum arithmetic-mean value of temperatures on its outside and internal surfaces in one section in case of normal operation. For parts of cases of reactors of the NPP settlement temperature is determined taking into account internal heat releases as sredneintegralny value of distribution of temperatures by case wall thickness;
settlement pressure – the maximum excessive pressure in the equipment or pipelines used when calculating on durability in case of the choice of the main sizes in case of which normal operation of this equipment or pipeline of the NPP is allowed at settlement temperature;
sector branch – the branch made of pieces of the pipes welded at an angle to each other;
the specialized organization – the organization performing works in the field of nondestructive control, welding, related processes and technologies, and also rendering services in production certification (qualification) of technology of welding and certification of personnel in the field of welding production when implementing activities for use of atomic energy;
the heatmechanical equipment – the heatpower, mechanical and water treatment equipment, and also devices of thermal automatic equipment and heattechnical measurements established on this equipment;
engineering certification – establishment of compliance of the equipment and pipelines to requirements of these rules, the project of reactor installation (further – RU) or the NPP and the working documentation, and determination of their serviceable condition developed according to it with possibility of operation on parameters of working environment;
the pipeline – the set of the details connected among themselves and assembly units intended for transportation of working environment;
the device – arrangement, ratio of parts, design of the equipment and pipelines.
5. The group A of the equipment and pipelines turns on the equipment and pipelines carried to elements of the NPP of class of safety 1.
6. The group B of the equipment and pipelines turns on the equipment and pipelines carried to elements of the NPP of class of safety 2, and the equipment and pipelines carried to safety class elements 3, failure or destruction of which brings to:
unremovable regular means of the NPP to leakage of the heat carrier which is directly contacting to the fuel elements;
to failure to carry out by any security system of the NPP of the functions.
7. The group C of the equipment and pipelines turns on the equipments and pipelines carried to elements of the NPP of class of safety 3, failure or destruction of which which did not enter into group B requires enforcement of security systems of the NPP and brings to:
removable regular means to leakage of the heat carrier of the NPP which is directly contacting to the fuel elements of the NPP;
to failure of one of channels of any security system of the NPP;
to exceeding of the established values of maximum permissible emissions or admissible dumpings of radioactive materials of the NPP, or admissible levels of radioactive pollution of working premises of the NPP.
8. For the specific equipment and pipelines belonging to group is established by developers of the project of the NPP (RU).
9. As borders between the equipment and the pipeline belonging to different groups or between the pipelines of the NPP belonging to different groups serve welded or demountable connections.
10. Boundary welded connections and fasteners belong to the equipment or the pipeline to which more high requirements for safety are imposed.
11. The equipment, products and technologies for the NPP are subject to confirmation of fulfillment of requirements of these rules.
12. Durability and functional characteristics of the equipment and pipelines are proved in the project of the NPP (RU) for all service life of the equipment and pipelines.
13. Service life and resource characteristics of the equipment and pipelines are established by developer and are specified in the design and (or) project documentation.
14. The developer of the project of the NPP (RU) and developer of the equipment and pipelines provide possibility of their survey, maintenance, repair, diagnosing, carrying out testing by pressure and nondestructive control of metal after production, installation and in case of operation, and also replacements of the equipment and pipelines with service life of less project service life of the NPP.
In case of possibility of carrying out ultrasonic control of metal preference is given to the automated control.
15. For the equipment (except for fittings) and pipelines of the first contour of the water-to-water power reactor of the NPP content of cobalt in the main and naplavochny materials of the details and assembly units contacting to the heat carrier of the first contour of the NPP shall not exceed % 0,05.
16. For the equipment and pipelines contacting to radioactive circles the possibility of drainage of the heat carrier and removal of products of pollution, deactivations of surfaces and removal of the flushing and deactivating solutions is provided.
17. In RU NPP with water-to-water power reactors containers with samples witnesses of metal of the case of the reactor of the NPP for assessment of impact of temperature and neutron radiation are placed.
18. The quantity of sets of samples witnesses and containers with samples witnesses in sets, locations of containers and frequency of control of characteristics of metal of samples witnesses are proved in the RU project.
The quantity of sets of samples witnesses is determined from sufficiency for periodic confirmation of each controlled characteristic of metal during service life of the NPP.
19. Design documentation joins the program of control of radiation embrittlement and thermal aging which contents conforms to the following requirements:
19.1. zones of control of the equipment, design, quantity and locations of samples witnesses are determined by design documentation, and also these rules;
19.2. the program of control for the samples witnesses or samples which are cut out from the case of the reactor of the NPP is part of design documentation;
19.3. the organization of works on accounting of fluence of bystry neutrons with energy of more 0,5 of MEV on cases of reactors of the NPP is performed by the operating organization;
19.4. control of radiation embrittlement of metal of the irradiated elements of the NPP in case of operation which includes:
control of the current parameter value of neutron radiation in zones of the control RU received as a result of monitoring;
assessment of parameters of neutron radiation of metal of samples witnesses and zones of control RU;
control of parameters of radiation embrittlement and temperature aging of metal of samples witnesses;
control of parameters of radiation embrittlement of metal on the samples which are cut out from control RU zone (if necessary);
control of temperature of models witnesses of radiation embrittlement with use of materials which temperature of melting is in the range from (Ttepl – 2 °C) to (Ttepl + 20 °C) where Ttepl – heat carrier temperature, with step on melting temperature no more than 10 °C.
Opportunity and need of cutting of samples from control RU zone for the purpose of establishment of parameters of radiation embrittlement is proved by the operating organization;
19.5. control of temperature aging of metal of not irradiated elements of the NPP in case of operation which includes:
control of parameters of temperature aging of metal of samples witnesses;
control of temperature of endurance of samples from sets of models witnesses of thermal aging;
19.6. control of parameters of radiation embrittlement and temperature aging includes determination of mechanical properties of metal (limit of flowability, strength, relative lengthening, relative narrowing), characteristics of resistance to brittle destruction (critical temperature of fragility and (or) viscosity of destruction);
19.7. testing of sets of models witnesses of radiation embrittlement and thermal aging are carried out on the same equipment and with use of the same techniques of testing and processings of experimental results which were used when testing control sets;
19.8. unloading and testing of sets of samples witnesses are performed at least 6 times for project service life. The first time unloading and testing of samples witnesses are carried out no later than in 10 years after the beginning of operation of the NPP;
19.9. samples witnesses are established in the case of the reactor of the NPP with the advancing coefficient on fluence of neutrons providing confirmation of the characteristics of metal accepted in the RU project for the period before the following unloading of samples witnesses;
19:10. results of testing are drawn up in report type and used in case of reasons for safe operation of RU.
20. The developer of the project of the NPP provides possibility of carrying out separate testing by pressure of pipelines of the NPP attached to the soaking-up and pressure head parts of pumps of the NPP if the last are designed on different pressure.
21. In the design and (or) project documentation of the NPP measures for protection of the equipment and pipelines from physical and chemical and physical impact of working environment shall be specified.
22. The equipment and pipelines with temperature of outside surface of walls is above 45 °C, located in the serviced premises of the NPP, and it is above 60 °C, the NPPs located in rooms of limited access, are heat-insulated. Temperature of outside surface of heat insulation of the equipment and pipelines does not exceed the values specified in this Item. On the RU main circulating pipelines on all their extent and on other pipelines in the places which are subject to nondestructive operational control, heat insulation is removable.
23. The space arrangement of pipelines of the NPP, and also methods and conditions of fixing of the equipment and pipelines shall exclude their damage owing to mutual movements.
24. The possibility of removal of air when filling with working or test environment is provided in the equipment and pipelines, and also the condensate which is formed in the course of warming up or cooling. Handling capacity of devices of the NPP for removal of air is confirmed by calculation.
25. In the design and (or) project documentation of the NPP on assembly drawings of the equipment and on drawings of details and assembly units of pipelines of the NPP their belonging to the corresponding group shall be specified. On assembly drawings of the equipment the class of safety and category of seismic stability, and also size of settlement pressure and pressure of testing are specified by pressure.
The tables establishing amount and methods of quality control of metal are provided in design documentation.
26. The list of the irreplaceable equipment is provided in the design and (or) project documentation of the NPP.
27. Design documentation on the equipment is developed according to the specification of developer of the project of the NPP or RU.
The design documentation on the equipment of the A and B groups is coordinated with developer of the project of the NPP or RU.
28. The developer provides verification of the design and (or) project documentation on the equipment and pipelines on compliance to requirements of these rules by the specialists of the specified organization who were not participating in its development.
29. The developer ensures safety of the design and (or) project documentation on the equipment and pipelines throughout the term of their service.
30. The relation of the nominal height of elliptic covers and the bottoms measured from internal surface to the nominal internal diameter of cylindrical part of H/Dv shall be at least 0,2 according to the figure 1a of appendix 1, and the relation of nominal diameter of the central opening if that is available, to the nominal internal diameter of cover or bottom of d/Dv – no more 0,6 according to the figure 1b of appendix 1.
31. The relation of nominal height of the convex part of torosferichesky and dish-shaped covers and the bottoms measured from their internal surface to the nominal internal diameter of cylindrical part of H/Dv shall be at least 0,25.
The relation of nominal diameter of the central opening if that is available, to the nominal internal diameter of cover or bottom of d/Dv – no more 0,6.
The relation of nominal radiuses of R and r of spherical segment the Torah to the nominal internal diameter of cylindrical part of cover or bottom of Dv constitutes no more 1,0 of at least 0,1 respectively according to figures 2a and 2b of appendix 1.
32. Connections of covers and bottoms with feedwells (pipes) and flanges are carried out by joint welding. Application of angular and tee welded connections is allowed only in case of control possibility by nondestructive methods.
33. The elliptic, spherical, torosferichesky, dish-shaped, conic and flat covers and the bottoms which are subject to welding to feedwells, pipes or flanges are made with cylindrical collaring or boring.
The minimum height of collaring or boring of l of covers and bottoms according to figures 1a, 1b and 2a, 2b of appendix 1 corresponds to the table of 1 appendix 2, where S – the nominal thickness of wall of cover or bottom in the place of collaring.
34. On otbortovanny flat covers and the bottoms the radius of curvature of transition from collaring, flat to cylindrical part, constitutes at least 5 mm.
35. The equipment has the removable covers or hatches located in places, available to maintenance and repair.
It is allowed to carry out welded covers of the hatches used only for internal survey of the equipment in case of production, installation and before start-up of the NPP in operation on condition of monitoring procedure of their welded connections.
36. The equipment with the cylindrical case in which vvarena pipe boards, it is allowed to make without hatches in cases when maintenance and repair of his internal cavities are not provided.
37. The sizes of hatches through passage of oval form on the smallest and greatest axes constitute at least 320 mm and 420 mm respectively. The device of hatches of round form with a through passage diameter at least 400 mm is allowed.
38. The design pivotally - folding and plug-in bolts, collars, and also tightening devices of hatches, covers and flanges provides their fixing in standard position.
39. The minimum distance of l 1, on the median line between centers of two next openings makes at least 1,4 of half-sum of diameters of these openings according to the figure 3 of appendix 1.
40. A distance on internal surface from opening edge in spherical, elliptic, torosferichesky and dish-shaped covers and the bottoms to their cylindrical part measured on projection makes at least 0,1 from the internal diameter of cylindrical part of Dv according to the figure 4 of appendix 1.
41. L distance between the center of opening under bolt or hairpin in flanges, covers or press rings and their edge makes at least 0,85 of diameter of opening according to figures 5a and 5b of appendix 1.
42. Demountable connections are applied to connection of the pipeline to the equipment (pipeline) which is subject to maintenance with periodic detachment of the equipment (pipeline). In all other cases connection of pipelines to the equipment, and also connection of pipelines is among themselves made by welding.
43. Application of welded sector branches, welded tees and transitions is allowed for group B pipelines with working pressure to 1, in MPa and with the settlement temperature up to 100 °C, and also for group C pipelines with working pressure to 3,9 of MPa and with the settlement temperature up to 350 °C. In welded sectors the corner of Q constitutes no more than 15 °, l distance – at least 100 mm according to the figure 6 of appendix 1.
Application of welded sector branches, welded tees and transitions is proved by developer of the project of the NPP and is approved with the operating organization regarding ensuring control of their welded connections.
44. Horizontal sites of pipelines have bias of at least 0,004 towards organized drainage. For steam lines the drainage is provided at temperatures not big, than temperature of saturation of vapor with working pressure.
On horizontal sites of pipelines with nominal outer diameter up to 60 mm from corrosion-resistant staly austenitic class, contacting to water, steam-and-water mix and vapor, it is allowed not to provide bias on condition of possibility of washing of pipelines. On horizontal sites of pipelines with nominal outer diameter more than 60 mm from staly the same structural class or from plated staly perlitic class, contacting to the specified circles, it is allowed not to provide bias if the relation of length of the horizontal site to the nominal internal diameter of the pipeline does not exceed 25.
45. Devices for pipeline drainage are provided in the lower points of each section of the pipeline which is disconnected by latches which does not have natural drain at the expense of bias. The design of drainage devices provides possibility of check of operability of their condition.
The specified requirement does not extend to the pipelines with nominal outer diameter no more than 89 mm manufactured from corrosion-resistant staly austenitic class.
46. For warming up and purge all sites of steam lines which can be disconnected by shutoff valves are supplied in trailer points with locking valves. The steam lines operated with working pressure over MPa 2,16 and group B steam lines, irrespective of pressure, are supplied with two consistently located valves: throttle and locking. In case of warming up of the site of steam line the purge since each end of the site is provided in two directions.
47. For steam lines of saturated steam and for deadlock sites of steam lines of superheated vapor permanent removal of condensate is provided.
48. In the upper points of pipelines in case of impossibility of removal of air or gas directly via the equipment lines of removal of air (gas) are established. On the pipelines working under vakuummetrichesky pressure, lines of removal of air (gas) are not established if air (gas) when testing by pressure is removed otherwise.
49. On drainage pipelines and lines of removal of air (gas) from contours with radioactive circles two units of shutoff valves are established. On the line of removal of air (gas) it is allowed to establish one throttle and one locking valve.
Consolidation of lines of removal of air (gas) and pipelines of drainage in the general pipeline after the shutoff valves located in their not integrated parts with installation on it general shutoff valves is allowed. Consolidation of lines of removal of air (gas) from the sites of the pipelines located after the first on the course of environment of throttle valves which are disconnected or not disconnected from each other is allowed.
50. Angular welded connections with constructional gap are allowed to be applied in the zones not subject to impact of the bending loadings, and also in the presence of the special fixtures reducing the specified loads of welded connections.
51. Tee welded connections with constructional gap are allowed to be applied to welding of support and auxiliary details (suspension brackets, brackets, edges) to the equipment and pipelines.
52. Lap welded connections are allowed to be applied when welding to the equipment and pipelines of such elements as the strengthening slips, support plates, podkladny sheets, plates, levels under platforms, ladders, brackets, membranes. The rings welded from the inside of cases for strengthening of such elements as hatches, the union, are manufactured with alarm openings for control of hermeticity of welded connection. The specified alarm openings after control of hermeticity are closed by traffic jams, traffic jams scald, and welded connections of obvarka are exposed to capillary control.
53. Joint welded connections are carried out with complete foundering.
54. Longitudinal welded connections of cases of the equipment intended for work in horizontal position are not located within the bottom central corner equal 140 °, except as specified, when survey and control of the specified connections in case of operation are provided.
55. Welded connections are located out of support, except as specified, when the following conditions are at the same time satisfied:
the design and placement of support do not interfere with control of welded connection under support in case of operation;
in case of production or installation of equipment welded connection is exposed to continuous ultrasonic or radio graphical control, and the site of welded connection located under support is exposed to magnetic powder or capillary control.
It is not allowed to block support of zone of crossing and interface of welded connections.
56. The arrangement of ring welded connection on the curvilinear site of pipes is not allowed.
57. In sector withdrawal of welded pipes l distance between interfaces of cross ring seam of branch to longitudinal or spiral seams of the connected sectors or pipes makes at least 100 mm according to the figure 7 of appendix 1. The specified distance is measured between points of interface of axes of the corresponding seams.
58. Cross welded connections on ring collectors and spiralno curved pipes of heat exchange are applied only on condition of carrying out continuous radio graphical or ultrasonic control of the specified connections.
In case of unavailability of cross welded connections spiralno of curved pipes of surfaces of heat exchange for continuous control after their production welding of the above-stated pipes and control of welded connections are carried out to are flexible pipes.
59. When crossing cross joint welded connections of details (or assembly units) with longitudinal welded connections combination of axes of longitudinal seams of two next details is not allowed.
Axes of the specified seams are displaced relatively each other on the distance making at least the triple nominal thickness of more thick-walled of the connected details, but on 100 mm at least.
The specified requirement does not extend to seams of details with nominal outer diameter less than 100 mm and to the details (or assembly units) with longitudinal seams executed by automatic welding on condition of carrying out radio graphical and (or) ultrasonic, and also capillary or magnetic powder control of sites of interface or crossing of longitudinal and cross seams.
60. In case of production of the bottoms or covers from several details with arrangement of seams on chord a distance from outer edge of seam to diameter of the bottom parallel to chord or cover on projection makes no more 0,2 from the nominal internal diameter of the bottom or cover D according to the figure 8 appendices 1.
B distance between outer edge of circular seam on the bottoms and covers (except for spherical and dish-shaped) and the center of the bottom or cover makes no more 0,25 from the nominal internal diameter of the D bottom or cover. The minimum distance of "c" between edges of two next radial or circular seams makes at least three nominal thickness S bottoms or covers, but at least 100 mm according to the figure 9 of appendix 1. Requirements to arrangement of circular seam do not extend to seams of welding of covers and the bottoms to flanges and feedwells.
61. The distance with between edge of angular seam of welding of the union, hatch, pipe or other cylindrical hollow details and edge of the next joint seam of the equipment or pipeline makes at least triple design altitude of angular seam of h 1, at least the triple nominal thickness of wall of S1 of the welded detail according to the figure 10 of appendix 1.
62. L distance between edge of joint seam of the equipment or pipeline and the center of the next to it of opening makes at least 0,9 from diameter of opening of d in case of observance of requirements of Item 60 of these rules.
63. B distance between edges of the next angular seams of welding of branch pipes, unions or pipes to the equipment (or to pipelines) makes at least three design altitudes of angular seam or three nominal thickness of walls of the welded details according to the figure 10 of appendix 1. In case of different values of the specified heights or thickness their bigger value is accepted.
The requirements specified in part one of this Item do not extend to vvarka of pipes in pipe boards (lattices) and collectors, pipe boards of technological channels, channels of management system and protection and other channels.
64. The distance between axes of the next cross joint seams of cylindrical and conic details makes at least the triple nominal thickness of wall of the welded details (on bigger thickness), but at least 100 mm for the details having nominal outer diameter more than 100 mm, and diameter at least specified in case of its value to 100 mm inclusive.
The requirement specified in paragraph one of this Item does not extend to seams of welding of pipelines to equipment branch pipes if branch pipes were exposed to heat treatment as a part of the equipment, and also on seams of welding of pipe boards and details like the rings having thickness exceeding more than twice collaring height under welding.
65. The distance from edge of angular seam of the union to edge of the next seam of pipe when welding unions to cameras of measuring diaphragms makes at least three thickness of wall of the welded union and triple design altitude of angular seam. The specified requirement does not extend on the union with the outer diameter up to 30 mm of measuring devices with nozzles and diaphragms.
66. When welding of the flat details which are not loaded by pressure to the surfaces of the equipment and pipelines a distance between edge of angular seam of welding of these details and edge of the next joint seam and b distance between edges of angular seams of the next welded details is constituted by at least three design altitudes of angular seams according to the figure 11 of appendix 1. The distance of b is determined by the greatest design altitude of angular seam.
When welding details and devices crossing of joint seams of the case by angular seams with design altitude of no more 0,5 from the nominal thickness of wall of the case, but no more than 10 mm is allowed to the case of the equipment.
67. L distance between edge of joint seam of the pipeline with branch pipe or the union of the equipment and edge of the next joint seam on the pipeline makes at least 100 mm for pipelines with nominal outer diameter more than 100 mm, but the nominal outer diameter of D for pipelines of smaller diameter according to the figure 12 of appendix 1 suffices.
68. In the joint welded connections of cylindrical details which are subject to local heat treatment length of the L free direct site each party from seam axis (or from axes of extreme seams in case of simultaneous heat treatment of group of welded connections) is determined by formula
where D – the nominal outer diameter of the connected details, S – the greatest of nominal thickness of the connected details.
Length of the specified sites constitutes at least the nominal outer diameter of the welded details in case of its values to 100 mm inclusive and at least 100 mm in case of values of diameter more than 100 mm.
The site is considered the free direct site (with inclination no more than 15 °) from seam axis to edge of the next welded detail, began gib, edges of the next cross seam.
69. In the joint welded connections of pipelines which are subject to ultrasonic control length of the free direct site each party from axis of seam constitutes at least specified in the table 2 of appendix 2.
70. The distance from edge of joint seam prior to the beginning of the curvilinear site of gib on pipelines with the nominal outer diameter of 100 mm and more makes at least 100 mm, and for pipelines with nominal outer diameter up to 100 mm – the nominal outer diameter of pipe suffices.
71. When welding branch pipes or unions with the group C pipelines manufactured of pipes with spiral or longitudinal seams exit of seams of pipes in angular points of intersection of the forming pipes and the union is not allowed. The minimum distance measured on outside surface from the specified points to axes of seams of pipes makes at least 100 mm according to figures 13a and 13b of appendix 1.
When welding slips under support and suspension brackets with pipelines from pipes with spiral seams the minimum distance between edge of angular seam of welding of slip and edge of joint spiral seam of pipe makes at least three nominal thickness of wall of pipe.
72. Materials (the main, welding, naplavochny) for production of the equipment and pipelines are applied taking into account their physicomechanical and technical characteristics, and also service conditions to ensuring operability of the equipment and pipelines during their service life.
73. By transfers of materials for production of the equipment and pipelines the accompanying documentation is transferred in full.
74. Materials of different structural classes (steel of perlitic and austenitic classes, non-ferrous metals) are transported and stored in the conditions preventing their contact among themselves. Also in case of accomplishment of installation works the measures excluding contact of these materials are undertaken. These requirements are considered in case of development of documentation regulating working procedures on installation.
75. For production of the specific equipment or the pipeline use of new materials on the technical solution prepared by developer with involvement of the specialized organization is allowed.
76. Technical solution with the documents proving it confirming possibility of production of the equipment and pipelines with ensuring required quality is represented for approval in the operating organization. At the same time the amount and the nomenclature of the represented data (from among the these rules specified in Chapter 18) are determined by the organizations which constituted technical solution depending on specific conditions of operation of the equipment or pipeline.
The approved technical solution is applied to the passport of the equipment or to the certificate on production of details and assembly units of the pipeline, and the proving materials are stored in the operating organization during all useful life of the equipment or the pipeline of the NPP.
77. Production and installation of the heatmechanical equipment and pipelines are performed according to technological documentation, including the working drawings, projects of works developed according to requirements of the design and (or) project documentation, and results of accomplishment of technological and control transactions are documented. The persons participating in process of performance of works, exercising operational control shall be informed of technological documentation. At all fabrication stages and installation safety of the equipment, pipelines, elements is ensured.
78. Methods and amounts of control of the main materials, and also regulations of quality evaluation of the equipment are established in the technological and working documentation providing the detail level and opredelennost in case of performance of works on installation of processing equipment and pipelines.
79. Welding, building up, heat treatment, control of welded connections and naplavka in case of production and installation of equipment and pipelines are carried out according to the regulations and rules on ensuring nuclear and radiation safety "The organization and accomplishment of welding works on subjects to use of atomic energy" approved by the resolution of the Ministry of Emergency Situations of the Republic of Belarus of June 12, 2017 No. 26.
80. Materials in case of their obtaining by the manufacturer undergo incoming inspection on lack of mechanical, corrosion and other damages, on compliance of the accompanying documentation of marking, quantity, weight and overall dimensions with documentation of results, and also control before issue in production. Components in case of their obtaining by the mounting organization undergo incoming inspection on lack of mechanical, corrosion and other damages, on compliance of the accompanying documentation of marking, quantity, weight and overall dimensions with documentation of results, control of parameters and characteristics according to operational documents, and also control before issue in installation.
81. Transportation and storage of the equipment, details, assembly units of equipment and pipelines, and also the materials intended for their production, installation and repair are carried out taking into account data of the accompanying documentation on specific materials, the parameters and characteristics specified in operational documents.
The measures excluding mistakes in case of marking transfer, interoperational warehousing of materials are provided.
82. Details and assembly units have the marking allowing to identify them in the course of production, installation and operation.
Places and methods of drawing marking are specified in design documentation.
83. The manufacturer performs complete supply of equipment, including components, samples witnesses, control technological tests, spare parts and the tool for installation and maintenance if other is not provided by delivery conditions.
84. Acceptance tests of the equipment are carried out at stands, in the conditions which are brought closer to service conditions, and in the absence of such stands – as a part of systems on the NPP according to the separate decision of the operating organization and developer for each unit of equipment.
85. In cases when supply of equipment is provided by separate parts, its additional production using welding is performed by the manufacturer or on floor spaces of the operating organization by the mounting organization.
86. In cases when supply of equipment under the terms of installation is provided by separate parts, its installation and additional production using welding are carried out by the mounting organization under control of the authorized representative of the manufacturer.
87. On equipment cases the manufacturer establishes the plate on which are specified:
name or trademark of the manufacturer;
name of the equipment;
safety class;
group of the equipment;
category of seismic stability;
type of working environment;
serial number and year of production;
values of settlement pressure, settlement temperature and pressure of testing by pressure.
Installation sites of plates are specified in design documentation and are available to visual survey in case of operation.
Requirements of part one of this Item do not extend to armature cases.
88. The data listed in part one of Item 87 of these rules, the manufacturer puts also on one of the most visible parts of the equipment with method of shock and mechanical marking. Drawing the specified data paint is not allowed.
89. Cutting of semifinished products (procurements) and cutting of openings is carried out on the technology excluding formation of cracks. After thermal cutting machining of edges is carried out.
90. After cutting and machining end faces of details and (or) assembly units and surface of openings are controlled on lack of cracks, stratifications and other defects.
91. The bottoms, covers and their details are made by stamping of one leaf or welded sheet procurement from the sheets which are previously welded among themselves.
Production of the bottoms, covers and their details by free forging by machine method on condition of carrying out their subsequent continuous ultrasonic control is allowed.
92. Disembarkation of mouths in feedwells, the bottoms, covers and other details or assembly units is carried out by machine method.
93. Cold flaring (sinking) of pipes which minimum value of relative lengthening of metal at temperature of 20 °C makes at least 18% is allowed. At the same time in design and technological documentation the maximum size of admissible flaring (sinking) is specified.
Opportunity and conditions of application of hot flaring (sinking) of the ends of pipes are established in design and (or) technological documentation.
94. The integrated surfaces of welded details have the same configuration, as surface in places of welding of the specified details.
The admissible gap between edges of surface of welded detail and surface of product constitutes no more than a half of design altitude of angular seam, but no more than 5 mm if in design documentation more strict requirements are not established.
95. The cold tightness of pipelines if it is provided by the design and (or) project documentation, is carried out after accomplishment of all welded connections (except for the closing seam) on the site of tightness, their heat treatment (if it is provided), quality control of the executed welded connections and final fixing of motionless support on the ends of the site of tightness. The admissible size of cold tightness of pipelines (distance between the ends of the pulled together pipes) is specified in the design and (or) project documentation. Assembly and welding of the closing seam in assembly adaptation is made in the presence of the representative of the operating organization. Assembly adaptation is removed from the closing seam only after its complete cooling.
96. If the tightness is applied to assembly of the completing welded connection of the pipeline, then parameters characterizing it are brought in the certificate on installation and the passport of the pipeline.
97. Installation of pipelines is carried out so that welded connection of the equipment with the pipeline was not the closing welded connection. Works on installation of pipelines can be begun after installation of the heatmechanical equipment.
98. Welded connections of details or assembly units of the pipeline with the equipment except for of armature of group C are exposed to continuous radio graphical control, and results of control are applied to the certificate on installation of the pipeline.
99. The variation of outer diameter of the cylindrical details (except for pipes) made of sheets, forgings and castings constitutes no more than 1% of its nominal rate, but no more than 20 mm. Ovality of the above-stated cylindrical details does not exceed 1%.
In places of welding of unions, branch pipes, pipes, support, pins and other details the variation of outer diameter constitutes no more 1,5 of % of its nominal rate, but no more than 30 mm, at the same time ovality does not exceed % 1,5.
100. The variation of internal diameter of the spherical bottoms and covers constitutes no more than 1% of its nominal rate, but no more than 20 mm.
101. The variation from profile of the bottoms and covers (except spherical) constitutes no more than 1% of nominal rate of internal diameter of the bottom (cover), but no more than 20 mm.
102. In the landed mouths radius galtel on the outside surface of mouth of R constitutes at least nominal thickness of wall of detail in the place of disembarkation of mouth of S, but at least 20 mm according to the figure 14 of appendix 1.
It is allowed to establish value R on formula
provided that after disembarkation of mouth the detail is subjected to heat treatment and capillary or magnetic powder control of outside and internal surfaces of mouth within the zone specified in the drawing 14, where to L> 30 mm.
The sizes of this zone are established by technological documentation. For details from staly austenitic class and from carbonaceous and kremnemargantsovisty staly perlitic class it is allowed to combine hot disembarkation of mouth and heat treatment. Capillary and magnetic powder control is carried out after machining of mouth.
Requirements to radiuses of galtel are maintained both before machining of mouths, and after it.
103. Ovality of bent sites of pipes does not exceed 6% on details of pipelines of group A, 8% – on details of pipelines of group B and 12% – on details of pipelines of group C.
Ovality of bent sites of pipes of the heat-exchanging equipment of all groups does not exceed 12%.
Specified in parts one and the second this Item of the requirement do not extend to the thin-walled cylindrical details changing the form under the influence of dead load and (or) weight of the attached details with the relation of nominal thickness of wall to the nominal outer diameter of less 0,02.
104. Steeply curved (withdrawal) of knee with nominal outer diameter more than 57 mm and normally curved knee with nominal outer diameter more than 150 mm, intended for production of the equipment and pipelines of the A and B groups, is subject to continuous control of ovality and thinning of wall. In other cases control of ovality and thinning of wall of knees on curvilinear sites is carried out selectively of at least 10% of the knees of each standard size made by one order and on the same technology (but at least two knees).
The knee is considered steeply curved (normally curved) if the average radius of its curvature of less 3,5 (3,5) from the nominal outer diameter of knee suffices.
105. Need of heat treatment of assembly units and details in case of production, installation or repair is established by design and (or) technological documentation.
106. Type of heat treatment and its modes are set by design and (or) technological documentation on assembly units and details.
Types and the modes of heat treatment set by design and (or) technological documentation are approved with the specialized organization.
Control of the set modes of heating, excerpts and chillings is performed by registration of their parameters.
107. Mechanical characteristics of the metal which underwent heat treatment are determined when testing the samples which are cut out from allowances or specially made control tests. Tests are made of metal of the same batch (melting), as controlled detail and (or) assembly unit. Tests are exposed to heat treatment in the same amount and on the same modes, as product in the course of production or installation (together with controlled product or separately from it) taking into account leaves in cases of correction of defects of metal.
108. Feedwells, the bottoms, covers and other details from carbonaceous and kremnemargantsovisty staly after cold rolling or stamping are subject to heat treatment if the relation of nominal thickness of wall to the nominal internal radius of the feedwell or to the smallest radius of curvature of the bottom or cover exceeds 0,05.
109. Bent sites of pipes from carbonaceous and kremnemargantsovisty staly are subject to heat treatment if the relation of average radius of gib to the nominal outer diameter of pipe constitutes less 3,5, and the relation of nominal thickness of wall of pipe to its nominal outer diameter exceeds 0,05.
110. In the cases which are not specified in Items 108 and 109 of these rules, need of heat treatment of details after deformation is established by design and (or) technological documentation.
111. Heat treatment of details from carbonaceous and kremnemargantsovisty staly after hot rolling, are flexible or stamping is allowed be not to carried out if at the time of the end of deformation temperature of metal was not below 700 °C, except for the branches made flexible with heating by currents of high frequency.
Heat treatment of the bottoms and details from staly is allowed be not to carried out austenitic class after stamping or rolling if at the time of the end of deformation temperature of metal was not below 900 °C.
112. It is allowed to combine heat treatment after deformation of details (assembly units) from carbonaceous and kremnemargantsovisty staly, and also from staly austenitic class with the subsequent heat treatment of product after other technological transactions.
113. During the tempering and normalization the product can be located in the thermal furnace entirely.
114. In case of leave and austenization of product of big length its heat treatment in the furnace in parts with ensuring difference of temperatures of metal of product in zone of border of heating and at distance of 1 m from edge of the furnace no more than 100 °C on the technology approved with the specialized organization is allowed.
115. In case of leave and austenization of bent sites of pipes local heat treatment of the site of gib and the direct sites of pipes adjoining it from each party is allowed by extent the triple nominal thickness of wall, but at least 100 mm suffices.
116. In case of technological leaves of control tests reduction of duration of endurance in comparison with the endurance established for products, but no more than for 20% is allowed.
117. If controlled products are subject to repeated technological leaves at one temperature with identical total duration of endurance, control test is allowed to be subjected to single leave at the same temperature lasting endurance at least 80% and no more than 100% from the total duration of endurance of leaves.
118. If controlled products are subject to repeated technological leaves at different temperatures with identical (total) duration of endurance at the same temperature, control test is allowed to be subjected to single leave with endurance duration at each temperature at least 80% and no more than 100% from (total) duration of endurance of the corresponding leave (leaves). At first the endurance is carried out at lower temperature, then – in case of more high temperature. Transition time from one temperature to another in duration of endurance is not set off.
If among the provided repeated technological leaves at different temperatures are available leave with the same temperature and identical total duration of endurance, when carrying out single leave of control test endurance duration at each such temperature constitutes at least 80% and no more than 100% of total leave duration.
119. It is allowed to carry out control of characteristics of metal on one control test with observance of requirements of Items 116-118 of these rules in cases when duration (total duration) of endurance of leaves provided at the same temperature is different, but the difference between the maximum and minimum duration (total duration) of endurance does not exceed 20% of the maximum duration (total duration) of endurance. In case of spending vacation of control test duration of endurance constitutes at least 80% and no more than 100% of the maximum duration of endurance of leave (the maximum total duration of endurance of the corresponding leaves).
120. If controlled products are subject to leaves at the different temperatures except as specified specified in Item 118 of these rules, and (or) with different duration of endurance except as specified, the these rules specified in Item 119, characteristics of metal are performed on two separate control tests.
The first control test is exposed to the same leave, as product for which the smallest temperature of leave and (or) the minimum duration of endurance of single leave, or the lowest temperatures and (or) the smallest total duration of endurance are provided at the largest leave temperature for this product in case of repeated leaves.
The first control test is not subject to leave if among controlled products are available both subject, and not subject to leave.
Verification of characteristics of metal on the first test is allowed be not to carried out if prior to production (installation) of products of the characteristic of metal of procurements were checked and legislations on use of atomic energy conformed to requirements.
The second control test is exposed to the same leave, as product for which the most high temperature of leave and (or) the maximum duration of endurance of single leave, or the most high temperatures of leaves and (or) the maximum total duration of endurance are provided at the largest leave temperature for this product in case of repeated leaves.
In case of determination of the maximum total duration of endurance are considered all provided in technological documentation leave, including leave after correction of defects in metal.
121. If controlled products from carbonaceous and kremnemargantsovisty staly are subject to repeated normalization (tempering) or heatings for deformation at temperatures of normalization (tempering), control test is allowed to be subjected only to normalization (tempering) on the last mode.
122. After heat treatment mechanical properties of metal and its firmness against intercrystalline corrosion are determined (the last – only for corrosion-resistant staly austenitic class and iron-nickel alloys). Need, amount and temperature of testing, the determined characteristics and indicators, and also types and quantity of samples are established by design documentation (tables of quality control) and technological documentation.
123. Technological documentation on production and installation of equipment and pipelines regulates content and procedure for accomplishment of all technological and control transactions.
124. The executive scheme of connection of the equipment, the space executive scheme of the pipeline on the pipelines and the equipment relating to the A and B groups (including the changes made to it), is approved by developer of the project of the NPP (RU).
125. Technological documentation on smelting and pouring, thermal cutting, processing by pressure, welding, building up and heat treatment of metal of the equipment or pipeline of the A, B and C groups is approved with the specialized organization.
126. The equipment is delivered together with the passport which contains:
name of the manufacturer;
name of the equipment and its designation;
serial number and date of production of the equipment;
information about group, class of safety, category of seismic stability;
technical characteristics and parameters of the equipment;
data on chemical composition and mechanical characteristics of materials of details, welded connections and the built-up surfaces (for the last – only chemical composition);
data on heat treatment;
data on results of nondestructive control of metal;
data on correction of defects in case of production;
parameters and results of testing by pressure;
service life of the equipment and its resource characteristics;
data on preservation and packing;
the conclusion of the manufacturer about compliance of the manufactured equipment to requirements of these rules and design documentation;
warranty obligations;
other data upon the demand of the operating organization.
If the equipment doizgotavlivatsya on the assembly site, then the passport is drawn up by the manufacturer after additional production. In cases if additional production is performed by the mounting organization, the amount of data on additional production is established in coordination with the manufacturer.
In passports of the equipment in which samples witnesses are placed data on samples witnesses are provided in the amount necessary for their identification.
The accompanying documentation on materials is put to passports of the equipment.
Its resource characteristics are provided in the passport of the equipment.
127. During equipment service life the operating organization enters in its passport data on the location, registration, the executed testing by pressure, engineering certifications, repairs, operational control of condition of metal, and also the values of resource characteristics determined in case of operation.
In passports of the equipment in which samples witnesses are placed the operating organization enters data on unloading and loading of samples witnesses during equipment service life.
128. Are applied to the passport of the equipment:
to the maintenance instruction, maintenance and repair, and also other documents provided by delivery conditions;
the list of armature and (or) measuring instruments (further – the SI), necessary for retrofitting of the equipment if their delivery together with the equipment is not provided;
documents on assessment of conformity on the equipment (or their copies);
calculation on durability or the statement from it with reference to calculation and with the description of basic data and results;
drawings of the equipment;
tables of quality control of metal;
passports of armature and (or) the SI established on the equipment;
the accompanying documentation (or their verified copies) on the applied materials.
In case of use of new material according to Item 75 of these rules technical solution is put to the passport of the equipment.
Requirements of parts one and the second this Item and Item 129 of these rules do not extend to passports of armature.
129. In the presence of departures from design documentation the documents containing data on the eliminated departures, and also the report on discrepancies are put to the passport of the equipment.
130. The manufacturer reports to the operating organization of the certificate on production of details and assembly units of pipelines, set of drawings (general view and (or) assembly drawings with tables of quality control). The mounting organization transfers to the operating organization of the certificate on installation of equipment and (or) pipelines of the NPP.
131. The certificate on production of details and assembly units of pipelines contains:
name of the manufacturer;
name of details and assembly units of pipelines, date of production;
data on working environment, settlement pressure and temperature;
information about group, class of safety and category of seismic stability of the pipeline;
data on armature and (or) the SI established by the manufacturer on assembly units of the pipeline;
data on heat treatment of assembly units and details;
data on correction of defects in case of production;
results of testing by pressure;
data on results of nondestructive control of details, welded connections and the built-up surfaces;
the conclusion of the manufacturer about results of control of the made details and assembly units on observance of requirements of these rules and design documentation.
In case of use of new material according to Item 76 of these rules technical solution is put to the certificate on production of details and assembly units of pipelines.
In the presence of departures from design documentation the documents containing data on the eliminated departures, and also documents by results of control of observance of these rules and the report on discrepancies are put to the certificate on production.
132. The certificate on installation of equipment or the pipeline constituted by the operating organization together with the mounting organization contains:
name of the mounting organization;
name of the equipment or pipeline;
data on the equipment or the pipeline, including its group, class of safety and category of seismic stability, data on working environment;
the data on fasteners and (or) other details which are not included in the passport of the equipment or pipeline;
data on the welded connections, the built-up surfaces and heat treatment executed in case of installation;
data on correction of defects in case of installation;
data on armature and (or) the SI established in case of installation;
data on support and suspension brackets;
the size of cold tightness of the pipeline in case of its application;
results of testing by pressure;
the act certifying that installation of equipment and the pipeline is executed according to the project and the equipment and pipelines approved by the operating organization are in good repair.
133. The space executive scheme of the pipeline with indication of parameters of working environment, the geometrical sizes and arrangement of welded connections, places of removal of thermal isolation, installation of support, reference points, armature and the SI is put to the certificate on installation of the pipeline.
The executive scheme of turning on of the equipment with indication of parameters of working environment and sources of pressure and their parameters (most created pressure and expense), fittings, safety membranes, draw-off, blow-off, drainage devices and the SI is put to the certificate on installation of equipment.
In the presence of departures from the design and (or) project documentation the documents containing data on the eliminated departures are put to the certificate on installation of equipment or the pipeline.
Full text is available with an active Subscribtion after logging in.
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Search in text CTRL-F
If you are guest on our site, you will work in Demo mode. In Demo mode you can see only first page of each document.
With full access you can
Database include more 65000 documents. You can find needed documents using search system.
For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions.
This section provides answers to questions set by users.