ORDER OF THE GOVERNMENT OF THE RUSSIAN FEDERATION

of October 6, 2026 No. 1300

About introduction of amendments to some acts of the Government of the Russian Federation

The government of the Russian Federation decides:

1. Approve the enclosed changes which are made to acts of the Government of the Russian Federation.

2. Determine that the changes approved by this resolution extend to the legal relationship on technological connection of power receiving devices of consumers of electrical energy which arose based on requests for technological connection of power receiving devices of the consumers of electrical energy to power networks (further - the request for technological accession) given before entry into force of this resolution, except as specified, the stipulated in Item 3 presents of the resolution.

3. If before entry into force of this resolution the application for technological accession on the first, second or third category of reliability of power receiving devices with which use it is performed or planned to perform mining of digital currency (including participation in mining-pools) was submitted and (or) activities of the operator of mayningovy infrastructure (further - power receiving devices for mining), such accession is not complete and at the same time the conditions provided by subitems "an" - "in", "д" and "е" Item 119 of Rules of technological connection of power receiving devices of consumers of electrical energy, facilities for production of electrical energy, and also objects of electric grid economy belonging to the network organizations and other persons to power networks are complied, approved by the order of the Government of the Russian Federation of December 27, 2004 No. 861 "About approval of Rules of non-discriminatory access to services in transfer of electrical energy and rendering these services, Rules of non-discriminatory access to services in supervisory control in power industry and rendering these services, Rules of non-discriminatory access to services of the commercial operator of the wholesale market and rendering these services and Rules of technological connection of power receiving devices of consumers of electrical energy, facilities for production of electrical energy, and also the objects of electric grid economy belonging to the network organizations and other persons to power networks" (further - Rules of technological accession):

a) the network organization within 30 calendar days from the date of entry into force of this resolution notifies the applicant on possibility of completion of technological connection of power receiving devices for mining on the fourth category of reliability if the applicant does not direct to the network organization refusal of the request for technological accession or unilateral refusal of the agreement on implementation of technological accession or the agreement on order of interaction of the applicant and the network organization signed on its basis for the purpose of accomplishment of actions for technological accession on the individual project;

b) before the expiration of 60 calendar days from the date of the direction by the network organization of the notification provided by the subitem "an" of this Item, implementation of actions for technological connection of power receiving devices for mining stops;

c) in cases when the refusal provided by the subitem "an" of this Item did not arrive in the network organization within 60 calendar days from the date of the direction to the applicant of the notification from the network organization provided by the subitem "an" of this Item:

provisions of subitems "an" - "in", "д" and "е" Item 119, of Items 121, of 122, of 124 and 125 Rules of technological accession are applied to the relations on technological connection of power receiving devices for mining including which arose from earlier signed agreements on implementation of technological accession or agreements on order of interaction of the applicant and the network organization for the purpose of accomplishment of actions for technological accession on the individual project (conditions of the corresponding contracts or agreements before introduction of changes in them are applied in the part which is not contradicting the specified provisions of Rules of technological accession);

for the purpose of technological connection of power receiving devices for mining on the fourth category of reliability the network organization approves the project of the specifications corrected taking into account requirements of Item 122 of Rules of technological accession with the system operator (calculation of terms of implementation of actions for technological accession for such approval stops);

d) the applicant within 30 calendar days from the date of presentation of relevant requirements pays the network organization the expenses which are actually suffered by it in connection with accomplishment of the actions necessary for technological connection of power receiving devices on the fourth category of reliability according to requirements of Item 122 of Rules of technological accession if accomplishment of the specified actions was not provided by the specifications issued before entry into force of this resolution for technological connection of power receiving devices for mining and expenses on their accomplishment were not considered as a part of payment for technological accession.

4. The application for technological accession submitted before entry into force of this resolution is cancelled, the technological accession performed according to it stops in the following cases:

a) concerning power receiving devices for mining the conditions provided by subitems "an" - "in", "д" and "е" Item 119 of Rules of technological accession are not complied;

b) in the territory in which it was planned to perform technological connection of power receiving devices for mining the Government of the Russian Federation establishes prohibition on implementation of mining of digital currency (including participation in mining-pools) which extends to the power receiving devices for mining which are technologically attached to power networks on the fourth category of reliability.

5. The network organization within 30 calendar days from the date of entry into force of this resolution notifies the applicant on cancellation of the request for technological accession according to item 4 of this resolution.

6. If the applicant directs to the network organization refusal of the request for technological accession or unilateral refusal of the agreement on implementation of technological accession or the agreement on order of interaction of the applicant and the network organization signed on its basis for the purpose of accomplishment of actions for technological accession on the individual project or the request for technological accession is cancelled according to item 4 of this resolution:

a) the network organization within 30 calendar days from the date of entry into force of this resolution (in case of the direction the applicant in the network organization of refusal of the request for technological accession or unilateral refusal of the agreement on implementation of technological accession or the agreement on order of interaction of the applicant and the network organization signed on its basis for the purpose of accomplishment of actions for technological accession on the individual project - within 30 days from the date of receipt of the corresponding refusal) returns to the applicant the received payment for technological accession in the amount of, exceeding expenses of the network organization which are actually suffered in case of accomplishment of actions for such technological accession;

b) the applicant within 30 calendar days from the date of presentation of relevant requirements pays the network organization the expenses which are actually suffered by it in case of accomplishment of actions for technological accession, in the amount of, exceeding the amount of the payment for technological accession brought by the applicant.

7. This resolution becomes effective from the date of its official publication.

Russian Prime Minister

M. Mishustin

Approved by the Order of the Government of the Russian Federation of October 6, 2026 No. 1300

Changes which are made to acts of the Government of the Russian Federation

1. In Rules of technological connection of power receiving devices of consumers of electrical energy, facilities for production of electrical energy, and also the objects of electric grid economy belonging to the network organizations and other persons, to power networks, approved by the order of the Government of the Russian Federation of December 27, 2004 No. 861 "About approval of Rules of non-discriminatory access to services in transfer of electrical energy and rendering these services, Rules of non-discriminatory access to services in supervisory control in power industry and rendering these services, Rules of non-discriminatory access to services of the commercial operator of the wholesale market and rendering these services and Rules of technological connection of power receiving devices of consumers of electrical energy, facilities for production of electrical energy, and also the objects of electric grid economy belonging to the network organizations and other persons to power networks" (Russian Federation Code, 2004, No. 52, Art. 5525; 2009, No. 17, Art. 2088; 2010, No. 40, Art. 5086; 2012, No. 23, Art. 3008; 2013, No. 42, Art. 5373; 2014, No. 9, Art. 913; 2015, No. 25, Art. 3669; 2016, No. 9, Art. 1266; No. 49, Art. 6928; 2017, No. 21, Art. 3009; 2018, No. 34, Art. 5483; 2020, No. 14, Art. 2136; 2021, No. 6, Art. 985; No. 42, Art. 7123; 2022, No. 1, Art. 255; No. 27, Art. 4863; 2023, No. 13, Art. 2279; 2024, No. 13, Art. 1801; No. 16, Art. 2245; No. 22, Art. 2949; No. 36, Art. 5451, 5482; No. 45, Art. 6825; 2026, No. 6, Art. 581):

a) in Item 9:

add the subitem "e" with words "(in cases, stipulated in Item 117(1) these rules, only the fourth category of reliability is specified, in other cases the fourth category of reliability can be specified in case of observance of the conditions provided by subitems "b", "v", "d" and "e" of Item 119 of these rules)";

state the subitem "p" in the following edition:

"o) concerning applicants whose power receiving devices correspond to the conditions specified in subitems "b", "v", "d" and "e" of Item 119 of these rules - information on the consent of the applicant to the conclusion of the agreement and permanent technological connection of power receiving devices on the fourth category of reliability or on allocation of separate stage of the technological accession providing temporary accession on the fourth category of reliability if by preparation of specifications need of implementation of actions on construction (reconstruction) of object (objects) for production of electrical energy and (or) on strengthening of power network of the network organizations for creation of technical capability of technological connection of power receiving devices of the applicant will be established, with indication of the size of the maximum capacity concerning which such consent is expressed (it is specified at the request of the applicant in case, when for power receiving devices in the request according to the subitem "e" of this Item the first, second or third category of reliability is specified, or it shall be specified if the separate stage of technological accession providing temporary accession on the fourth category of reliability is provided by the scheme of external electric utility service).";

b) in the subitem "k" of Item 10 of the word "except for the request containing information on the consent of the applicant provided by the subitem "p" of Item 9 of these rules" shall be replaced with words "except for the request providing technological connection of power receiving devices of the applicant only on the fourth category of reliability on permanent basis";

c) Item 10 (to state 6) in the following edition:

"10(6). In case of the planned connection of power receiving devices of the consumer of electrical energy only on the fourth category of reliability on permanent basis (without allocation of separate stage of the technological accession providing temporary accession on the fourth category of reliability to implementation of actions, providing creation of technical capability of technological accession on the first, second or third category of reliability) development and approval of the scheme of external electric utility service are not required.";

d) add with Item 117 (1) the following content:

"117(1). Technological connection of power receiving devices with which use it is performed or planned to perform mining of digital currency (including participation in mining-pools) and (or) activities of the operator of mayningovy infrastructure, is allowed only on the fourth category of reliability with observance of requirements of subitems "an" - "in", "д" and "е" Item 119, of Items 121, of 122, of 124 and 125 these rules.";

e) state Item 118 in the following edition:

"118. If the Government of the Russian Federation makes the decision on prohibition of implementation of mining of digital currency (including participations in mining-pools) in the subject of the Russian Federation or in its separate territories which extends to the power receiving devices which are technologically attached to power networks on the fourth category of reliability (further - the decision on total ban of implementation of mining):

a) about day of cancellation of the decision on total ban of implementation of mining:

in the specified subject of the Russian Federation or in its separate territories requests on the fourth category of reliability with which use it is performed or planned to perform mining of digital currency (including participation in mining-pools) and (or) activities of the operator of mayningovy infrastructure are not accepted;

concerning the power receiving devices specified in the paragraph the second this subitem, attached to power network on the fourth category of reliability consideration of earlier received applications for technological accession, the conclusion based on such requests of agreements on implementation of technological accession and agreements on order of interaction, calculation of terms of accomplishment of actions for such contracts and agreements stops if they are already imprisoned;

b) concerning the power receiving devices specified in the paragraph the second the subitem "an" of this Item establishment of payment for technological accession on the individual project stops;

c) in the presence of the signed agreement on implementation of technological accession, terms of accomplishment of actions for which were suspended according to the subitem "an" of this Item, the network organization within 30 calendar days from the date of cancellation of the decision on total ban of implementation of mining:

sends to the applicant the supplementary agreement to the agreement on implementation of technological accession containing calculation of the payment for technological accession determined in the prices of the year corresponding to year of the direction of such supplementary agreement, except as specified, specified in paragraph three of this subitem;

in case of technological accession on the individual project addresses to authorized body of the executive authority in the field of state regulation of rates behind establishment of payment for technological accession and sends the supplementary agreement to the agreement on implementation of technological accession to the applicant with appendix of the decision of the specified body within 3 working days from the date of entry into force of such decision.";

e) in Item 119:

in the subitem "v" of the word "objects of electric grid economy with the highest class of voltage of 110 kV and shall be replaced with words above which belong to the territorial network organizations" "the existing or again constructed object of electric grid economy with the highest class of voltage of 110 kV and above which belongs to the territorial network organization";

g) state the subitem "g" in the following edition:

"d) for ensuring technical capability of technological connection of power receiving devices of the applicant on the first, second or third category of reliability inclusion in specifications and accomplishment of actions for construction (reconstruction) of the facility for production of electrical energy and (or) on strengthening of the existing power network of the network organization and (or) the adjacent network organization are required (it is applied in case concerning the specified power receiving devices of the applicant in the request the first, second or third category of reliability and their technological accession on the fourth category of reliability is specified it is performed temporarily as one of stages of technological accession);";

h) add with Item 119 (1) the following content:

"119(1). If in the request concerning power receiving devices according to the subitem "e" of Item 9 of these rules the fourth category of reliability is specified, technological connection of power receiving devices is performed with observance of requirements of subitems "an" - "in", "д" and "е" Item 119, of Items 121, of 122, of 124 and 125 these rules.";

i) state Items 120 and 121 in the following edition:

"120. If concerning power receiving devices conditions, stipulated in Item 119 these rules are satisfied, and in the request there is no information on the consent of the applicant provided by the subitem "p" of Item 9 of these rules, the territorial network organization along with the direction of the draft agreement about the implementation of technological accession and specifications containing the actions specified in the subitem "g" of Item 119 of these rules shall notify the applicant on possibility of allocation in specifications and the agreement on implementation of technological accession of stage of technological connection of power receiving devices on the fourth category of reliability or possibility of the conclusion of the agreement on implementation of the technological accession providing technological connection of power receiving devices to power networks on the fourth category of reliability on permanent basis.

In the specified in paragraph one of this Item case the applicant has the right within 10 calendar days from the date of receipt of the draft agreement about implementation of technological accession and specifications to notify the network organization on consent to allocation of the specified stage of technological accession or to the conclusion of the agreement on implementation of the technological accession providing technological connection of power receiving devices to power networks on the fourth category of reliability on permanent basis.

In case of receipt of the notification specified in the paragraph the second this Item, the network organization shall:

within 5 working days from the date of receipt of consent specified in the paragraph the second this Item to direct the project of the specifications providing technological accession on the fourth category of reliability or allocation of stage of accession on the fourth category of reliability (with application of a copy of such consent of the applicant), to approval to the system operator;

within 20 working days from the date of approval by the system operator of this Item of the project of specifications specified in paragraph four to send to the applicant 2 copies of the draft agreement signed in return about implementation of technological accession;

in case of obtaining from the system operator of information on lack of possibility of technological accession on the fourth category of reliability according to Item 121 of these rules to notify the applicant on lack of possibility of technological connection of its power receiving devices on the fourth category of reliability within 5 working days from the date of receipt of such information.

If in the request according to the subitem "e" of Item 9 of these rules the fourth category of reliability was specified or information on the consent of the applicant to technological connection of power receiving devices on the fourth category of reliability provided by the subitem "p" of Item 9 of these rules or on allocation of stage of technological connection of power receiving devices on the fourth category of reliability contains, the territorial network organization shall execute one of the following actions:

in stipulated in Item 15 these rules term to send to the applicant 2 copies of the agreement on implementation of technological accession and the specifications providing technological accession on the fourth category of reliability, approved by the system operator signed in return as the integral appendix to the agreement;

in case of obtaining from the system operator of information on lack of possibility of technological accession on the fourth category of reliability according to Item 121 of these rules to notify the applicant on lack of possibility of technological connection of its power receiving devices on the fourth category of reliability within 5 working days from the date of receipt of such information.

121. Determination of size of the maximum capacity which accession is allowed on the fourth category of reliability is performed by the system operator only if the applicant according to the subitem "e" or "p" of Item 9 or Item 120 of these rules expresses consent to technological connection of power receiving devices on the fourth category of reliability or on allocation of stage of technological connection of power receiving devices on the fourth category of reliability.

The size of the maximum capacity of power receiving devices which accession is allowed on the fourth category of reliability is determined by the system operator proceeding from observance of the condition specified in the subitem "an" of Item 119 of these rules:

by consideration and approval of the draft of the scheme of external electric utility service of power receiving devices it is also carried to the applicant and the territorial network organization;

by consideration and approval of the project of specifications received from the territorial network organization according to Item 21 of these rules it is also carried to such network organization.

If technological accession on the fourth category of reliability proceeding from the condition provided by the subitem "an" of Item 119 of these rules is impossible, the system operator refuses approval of the specifications providing technological accession on the fourth category of reliability (allocation of stage of technological accession on the fourth category of reliability), or refuses inclusion in the scheme of external electric utility service of stage of technological accession on the fourth category of reliability with indication of the reason of such refusal.

If the application was submitted for technological accession only on the fourth category of reliability and is refused by the network organization from the system operator in approval of the specifications providing technological accession on the fourth category of reliability, the request is cancelled.

In certain subjects of the Russian Federation or in their separate territories on which the Government of the Russian Federation makes the decision on establishment of prohibition on implementation of the mining of digital currency (including participation in mining-pools) allowing implementation of mining of digital currency (including participation in mining-pools) with use of the power receiving devices which are technologically attached to power network on the fourth category of reliability, the size of the maximum capacity of other power receiving devices which accession is allowed on the fourth category of reliability in the territories specified in such decision is determined by the system operator without the maximum capacity of the power receiving devices which are technologically attached or attached to power network on the fourth category of reliability with which use it is performed or planned to perform mining of digital currency (including participation in mining-pools) and (or) activities of the operator of mayningovy infrastructure, and proceeding from possibility of restriction of the mode of consumption of electrical energy of the specified power receiving devices in full.";

j) to add subitems "b" and "v" of Item 122 after words of "control center of networks of the territorial network organization" with words ", being primary receiver of teams about emergency restrictions,";

k) add Item 125 with the paragraph of the following content:

"Consumers of electrical energy whose power supply of power receiving devices is performed on the first, second or third category of reliability having no right to redistribute the maximum capacity of such power receiving devices for benefit of consumers whose technological connection of power receiving devices is performed on the fourth category of reliability.";

l) add with Item 126 of the following content:

"126. Consideration and approval of projects of the specifications by the system operator (made to them changes) concerning the power receiving devices which are technologically attached to power network on the fourth category of reliability are performed by the system operator regarding the technical solutions and requirements specified in Item 122 of these rules (in case of allocation in accession stage specifications on the fourth category of reliability - regarding technical solutions and requirements, the specified in paragraphs seven of Item 21 and Item 122 of these rules).".

2. The Section XXIII of Rules of the wholesale market of electrical energy and the capacity approved by the order of the Government of the Russian Federation of December 27, 2010 No. 1172 "About approval of Rules of the wholesale market of electrical energy and capacity and about introduction of amendments to some acts of the Government of the Russian Federation concerning the organization of functioning of the wholesale market of electrical energy and capacity" (The Russian Federation Code, 2011, No. 14, Art. 1916; 2024, No. 16, of the Art. 2245) to add with Item 312 (1) the following content:

"312(1). If power receiving devices with which use the mining of digital currency (including participation in mining-bullet) or activities of the operator of mayningovy infrastructure is performed enter into structure of aggregative object of the management which is selected on current period of rendering the services in management of change of the mode of consumption of electrical energy (constituting it subjects to regulation of consumption of electrical energy), and the Government of the Russian Federation since the date falling on the specified period establishes prohibition on implementation of mining of digital currency (including participation in mining-bullet) in the certain subject of the Russian Federation or in the separate territories of the subject of the Russian Federation within which such aggregative object of management (the subjects to regulation of consumption of electrical energy which are its part) is located, since Date of Introduction of prohibition on implementation of mining of digital currency (including participation in mining-bullet) in the corresponding territory:

in case of determination concerning such aggregative object of management of the amount of decrease in consumption of electrical energy and indicators of unavailability which is actually performed in the wholesale market within rendering services in management of change of the mode of consumption of electrical energy in current period decrease (termination) in consumption of electrical energy is not considered by the power receiving devices which are its part with which use the mining of digital currency (including participation in mining-bullet) or activities of the operator of mayningovy infrastructure is performed;

the contractor of services in management of change of the mode of consumption of electrical energy does not bear responsibility for non-execution (improper execution) of agreement obligations of rendering services in management of change of the mode of consumption in current period of rendering such services if such non-execution (improper execution) resulted from decrease (termination) in consumption of electrical energy the power receiving devices which are part of aggregative object of management with which use the mining of digital currency (including participation in mining-bullet) or activities of the operator of mayningovy infrastructure is performed;

the impossibility of rendering services in management of change of the mode of consumption of electrical energy in connection with establishment of prohibition on implementation of mining of digital currency (including participation in mining-bullet) is not the basis for recognition of the contractor of services by the change of the mode of consumption of electrical energy which refused rendering services in management with use of this aggregative object of management and does not involve obligations on payment of sum of money to them according to the procedure, stipulated in Item 302 these rules.".

3. In the order of the Government of the Russian Federation of May 4, 2012 No. 442 "About functioning of the retail markets of electrical energy, complete and (or) partial restriction of the mode of consumption of electrical energy" (The Russian Federation Code, 2012, No. 23, Art. 3008; 2013, No. 1, Art. 68; 2017, No. 23, Art. 3323; 2018, No. 34, Art. 5483; No. 39, Art. 5970; 2024, No. 45, Art. 6825; No. 53, Art. 8750; 2026, No. 6, Art. 581; No. 8, Art. 917):

a) Item 7 (Basic provisions of functioning of the retail markets of electrical energy approved by the specified resolution after the words "such prohibition" to add 2) with words "(including data on the territories where such prohibition extends to cases of use of the power receiving devices which are technologically attached to power networks on the fourth category of reliability)";

b) in the Rules of complete and (or) partial restriction of the mode of consumption of electrical energy approved by the specified resolution:

Item 33 (1) after the paragraph of the fourth to add with the paragraph of the following content:

"If the Government of the Russian Federation establishes prohibition on implementation of mining of digital currency (including participation in mining-pools) in the certain subject of the Russian Federation or in the separate territories of the subject of the Russian Federation and such prohibition does not extend to cases of use of the power receiving devices which are technologically attached to power networks on the fourth category of reliability, introduction concerning power receiving devices which are technologically attached to power network on the fourth category of reliability and with which use are performed mining of digital currency (including participation in mining-pools) and (or) activities of the operator of mayningovy infrastructure, in such territories of restriction of the mode of consumption for the purpose of carrying out repair work on power generation facility (equipment) is performed in priority procedure in relation to other power receiving devices of consumers, attached to power network on the fourth category of reliability.";

in Item 37:

add paragraph two with words ", with obligatory specifying of the power receiving devices included in schedules of emergency restriction attached to power network on the fourth category of reliability. In the territories, the specified in paragraphs six and the seventh Item 1 of these rules, power receiving devices with which use are performed mining of digital currency (including participation in mining-pools) and (or) activities of the operator of mayningovy infrastructure are also specified";

the fourteenth to state the paragraph in the following edition:

"In case of schedule development of emergency restriction and modification of the approved schedules of emergency restriction according to Item 39 (1) these rules the network organization performs inclusion in schedules of emergency restriction of all power receiving devices attached to power network on the fourth category of reliability with consumption loading in volume of all maximum capacity of such power receiving devices provided by documents on their technological accession to power networks.";

Item 37 in paragraph four (words "the paragraph the seventh" shall be replaced with words 1) "paragraphs the sixth and seventh";

in paragraph five of Item 38 of the word "in full" shall be replaced with words "in volume of all maximum capacity of such power receiving devices provided by documents on their technological accession to power networks";

add with Item 38 (2) the following content:

"38(2). In case of completion of technological connection of power receiving devices to power network on the fourth category of reliability during the period after issue by the subject of supervisory control in power industry of requirements to amounts, time and places of input of emergency restriction the network organization includes loading of such power receiving devices in the developed schedules of emergency restriction in addition to amounts of the emergency restrictions provided by requirements of the subject of supervisory control in power industry. Decision making, stipulated in Item 38(1) these rules, in the specified case is not required.";

in Item 39 (1):

in paragraph five "new" to replace the word with the word of "attached";

after the paragraph of the eleventh to add with the paragraph of the following content:

"inclusion in schedules of emergency restriction of the power receiving devices attached to power network on the fourth category of reliability.";

in the paragraph the twelfth:

"the first - the eleventh" shall be replaced with words words "the first - the twelfth";

add with the offer of the following content: "In case of modification of schedules of emergency restriction due to the need of turning on in them of the power receiving devices attached to power network on the fourth category of reliability, inclusion of loading of such power receiving devices in schedules of emergency restriction it is performed in addition to amounts of the emergency restrictions provided by requirements of the subject of supervisory control in power industry.";

in Item 40:

the fourth to add the paragraph with the words "and paragraph the fifth this Item";

after the paragraph of the fourth to add with the paragraph of the following content:

"If the Government of the Russian Federation establishes prohibition on implementation of mining of digital currency (including participation in mining-pools) in the certain subject of the Russian Federation or in the separate territories of the subject of the Russian Federation and such prohibition does not extend to cases of use of the power receiving devices which are technologically attached to power networks on the fourth category of reliability in case of enforcement of schedules of emergency restriction in such territories restriction (shutdown) of giving of electrical energy on power receiving devices which are technologically attached to power network on the fourth category of reliability and with which use are performed mining of digital currency (including participation in mining-pools) and (or) activities of the operator of mayningovy infrastructure, is performed in priority procedure in relation to other power receiving devices of consumers, attached to power network on the fourth category of reliability.";

word in paragraph eight "the paragraph the fourth" shall be replaced with words "paragraphs the fourth and fifth";

Item 44 (to add 1) with the paragraph of the following content:

"If the Government of the Russian Federation establishes prohibition on implementation of mining of digital currency (including participation in mining-pools) in the certain subject of the Russian Federation or in the separate territories of the subject of the Russian Federation and such prohibition does not extend to cases of use of the power receiving devices which are technologically attached to power networks on the fourth category of reliability, recovery in such territories of electric utility service of power receiving devices which are technologically attached to power network on the fourth category of reliability and with which use are performed mining of digital currency (including participation in mining-pools) and (or) activities of the operator of mayningovy infrastructure, is performed in the last queue after recovery of electric utility service of other power receiving devices of the consumers attached to power network on the fourth category of reliability.".

4. In the order of the Government of the Russian Federation of November 1, 2024 No. 1468 "About approval of Rules of establishment of prohibition on implementation of mining of digital currency (including participation in mining-bullet) in certain subjects of the Russian Federation or in their separate territories" (The Russian Federation Code, 2024, No. 45, Art. 6817; 2025, No. 12, Art. 1318):

a) in word preamble "According to part 12 of article 14 of the Federal law "About Digital Financial Assets, Digital Currency and about Modification of Separate Legal Acts of the Russian Federation" to exclude;

b) Item 2 Corrected establishments of prohibition on implementation of mining of digital currency (including participation in mining-bullet) in certain subjects of the Russian Federation or in their separate territories approved by the specified resolution to state in the following edition:

"2. The government of the Russian Federation has the right to establish prohibition on implementation of mining of digital currency (including participation in mining-bullet) in certain subjects of the Russian Federation or in their separate territories:

in case of availability in certain subjects of the Russian Federation or in their separate territories of the existing and (or) predicted deficit of electrical energy and (or) capacity, including in case of their reference according to last approved by the scheme and the development program of electric utility systems of Russia to the territories of technologically necessary generation;

in case of the appeal of the management official of the subject of the Russian Federation (the chairman of the supreme executive body of the subject of the Russian Federation) to the Government of the Russian Federation about establishment of prohibition on implementation of mining of digital currency (including participation in mining-bullet);

in case of reference of the subject of the Russian Federation or its separate territories to the territories which are united in not price zones of the wholesale market, specified in appendix No. 2 to the Rules of the wholesale market of electrical energy and capacity approved by the order of the Government of the Russian Federation of December 27, 2010 No. 1172 "About approval of Rules of the wholesale market of electrical energy and capacity and about introduction of amendments to some acts of the Government of the Russian Federation concerning the organization of functioning of the wholesale market of electrical energy and capacity" (further - Rules of the wholesale market);

in case of reference of the subject of the Russian Federation or its separate territories to the territories of price zones of the wholesale market for which features of functioning wholesale and the retail markets, specified in appendix No. 3 to Rules of the wholesale market are established;

in case of reference of the subject of the Russian Federation to subjects of the Russian Federation in the territory of which the differential tariffs on services in transfer of electrical energy in single (national) power network, specified in appendix No. 2 to the pricing Bases in the field of regulated prices (rates) in power industry approved by the order of the Government of the Russian Federation of December 29, 2011 No. 1178 "About pricing in the field of regulated prices (rates) in power industry" are established;

in case of reference of the subject of the Russian Federation to subjects of the Russian Federation concerning which features of application of provisions of the legislation of the Russian Federation on power industry according to the order of the Government of the Russian Federation of July 29, 2023 No. 1230 "About features of application of the legislation of the Russian Federation in the field of power industry in the territories of the Donetsk People's Republic, the Luhansk People's Republic, the Zaporizhia region and Kherson region" are established.

The prohibition on implementation of mining of digital currency (including participation in mining-bullet) does not extend to the separate territories of subjects of the Russian Federation concerning which confirmations are received from the organization for management of single national (all-Russian) power network, the systemically important territorial network organization, and also from the system operator of electric utility systems of Russia about lack of technological connection of the power receiving devices located on them with which use the mining of digital currency is performed (including participation in mining-bullet), and power generation facilities from which electric utility service of such power receiving devices, to power networks as a part of Power pool system of Russia and technologically isolated territorial electric utility systems is performed.

The confirmations specified in paragraph eight of this Item are issued at the request of person planning to perform mining of digital currency (including participation in mining-bullet) in the specified territories and included in the register of persons performing mining of digital currency (including participation in mining-bullet).

The prohibition on implementation of mining of digital currency (including participation in mining-bullet) in certain subjects of the Russian Federation or in their separate territories is not applied in use cases to implementation of mining of digital currency (including participations in mining-pools) and (or) activities of the operator of mayningovy infrastructure of power receiving devices which are technologically attached to power network on the fourth category of reliability. Provisions of this paragraph do not extend to subjects of the Russian Federation or to their separate territories relating:

to the territories which are united in not price zones of the wholesale market, specified in appendix No. 2 to Rules of the wholesale market;

to the territories of price zones of the wholesale market for which features of functioning wholesale and the retail markets, specified in appendix No. 3 to Rules of the wholesale market are established;

to subjects of the Russian Federation in the territory of which the differential tariffs on services in transfer of electrical energy in single (national) power network, specified in appendix No. 2 to the pricing Bases in the field of regulated prices (rates) in power industry approved by the order of the Government of the Russian Federation of December 29, 2011 No. 1178 "About pricing in the field of regulated prices (rates) in power industry" are established;

to subjects of the Russian Federation concerning which features of application of provisions of the legislation of the Russian Federation on power industry according to the order of the Government of the Russian Federation of July 29, 2023 No. 1230 "About features of application of the legislation of the Russian Federation in the field of power industry in the territories of the Donetsk People's Republic, the Luhansk People's Republic, the Zaporizhia region and Kherson region" are established.".

5. In the order of the Government of the Russian Federation of December 23, 2024 No. 1869 "About establishment of prohibition on implementation of mining of digital currency (including participation in mining-bullet) in certain subjects of the Russian Federation and in the separate territories of subjects of the Russian Federation" (The Russian Federation Code, 2024, No. 53, Art. 8699; 2025, No. 12, Art. 1318):

a) in word preamble "According to part 12 of article 14 of the Federal law "About Digital Financial Assets, Digital Currency and about Modification of Separate Legal Acts of the Russian Federation", Item 1 of article 21 of the Federal law "About Power Industry" and the order of the Government of the Russian Federation of November 1, 2024 "About approval of Rules of establishment of prohibition on implementation of mining of digital currency (including participation in mining-bullet) in certain subjects of the Russian Federation or in their separate territories" to exclude No. 1468;

b) state Item 3 in the following edition:

"3. The prohibition on implementation of mining of digital currency (including participation in mining-bullet), the stipulated in Item 1 this resolution, does not extend:

on the separate territories of subjects of the Russian Federation concerning which the condition established by the paragraph the eighth Item 2 of Rules of establishment of prohibition on implementation of mining of digital currency (including participation in mining-bullet) in certain subjects of the Russian Federation or in their separate territories approved by the order of the Government of the Russian Federation of November 1, 2024 No. 1468 "About approval of Rules of establishment of prohibition on implementation of mining of digital currency (including participation in mining-bullet is complied) in certain subjects of the Russian Federation or in their separate territories";

on cases of use of power receiving devices which are technologically attached to power network on the fourth category of reliability, for implementation of mining of digital currency (including participations in mining-bullet) and (or) activities of the operator of mayningovy infrastructure, except for the territories, the specified in paragraphs eleven - the fourteenth Item 2 of Rules of establishment of prohibition on implementation of mining of digital currency (including participation in mining-bullet) in certain subjects of the Russian Federation or in their separate territories specified in the paragraph the second this Item.".

 

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Search in text CTRL-F

Demo Access

If you are guest on our site, you will work in Demo mode. In Demo mode you can see only first page of each document.


Full Access

With full access you can

  • see full text
  • see original text of document in Russian
  • download attachment (if exist)
  • see History and statistics

Get Full Access Now

Effectively work with search system

Database include more 65000 documents. You can find needed documents using search system.
For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions.
This section provides answers to questions set by users.

Search engine created by CIS Legislation Company