of July 7, 2014 No. 36
About modification and amendments in the resolution of the Ministry of Architecture of the Republic of Belarus of April 15, 2008 No. 18
Based on subitems 5.6 and 5.34 of Item 5 of the Regulations on the Ministry of Architecture of the Republic of Belarus approved by the resolution of Council of Ministers of the Republic of Belarus of July 31, 2006 No. 973 "Questions of the Ministry of Architecture of the Republic of Belarus", the Ministry of Architecture of the Republic of Belarus DECIDES:
1. Bring in the Instruction for cost determination of construction of one meter of the square apartment house in basic and current price levels approved by the resolution of the Ministry of Architecture of the Republic of Belarus of April 15, 2008 No. 18 (The national register of legal acts of the Republic of Belarus, 2008, No. 106, 8/18659; No. 211, 8/19367; No. 303, 8/19905; 2011, No. 38, 8/23484), changes and amendments, having been reworded as follows it it (is applied).
2. This resolution becomes effective after its official publication.
Minister
A.B.Cherny
|
It is approved Minister of Economic Affairs of the Republic of Belarus N. G. Snopkov June 9, 2014 |
It is approved First Deputy Minister of Finance of the Republic of Belarus V. V. Amarin June 10, 2014 |
|
It is approved Chairman of the Brest regional executive committee K. A. Sumar June 11, 2014 |
It is approved Chairman of the Vitebsk regional executive committee A. N. Kosinets March 24, 2014 |
|
It is approved Chairman of the Gomel regional executive committee V.A.Dvornik June 2, 2014 |
It is approved Chairman of the Grodno regional executive committee V. V. Kravtsov June 11, 2014 |
|
It is approved Chairman of the Mogilev regional executive committee P.M.Rudnik June 5, 2014 |
It is approved Chairman of the Minsk regional executive committee S. B. Shapiro June 3, 2014 |
|
It is approved Chairman of the Minsk city executive committee N. A. Ladutko June 25, 2014 |
|
Approved by the Resolution of the Ministry of Architecture of the Republic of Belarus of April 15, 2008 No. 18
(in edition of the Resolution of the Ministry of Architecture of the Republic of Belarus of July 7, 2014 No. 36)
The instruction for cost determination of construction of one meter of the square apartment house in basic and current price levels
Chapter 1 General provisions
1. This Instruction establishes procedure for cost determination of construction of one square meter of the apartment house in basic and current price levels.
2. For the purposes of this Instruction the following main terms and their determinations are used:
the built-in non-residential part of the house - the isolated space part of the house occupied with non-residential premises and located in volume of the house;
the built-in attached non-residential part of the house - the isolated space part of the house occupied with non-residential premises and having general designs with the house located as inside, and out of house amount;
residential part of the house - the isolated space part of the house occupied with premises with the auxiliary and utility rooms falling on them, intra house devices public;
change in value indexes (the prices, costs) in construction - the relation of cost indicators of the current (forecast) period to cost indicators of the basic period on resources, sets of resources or their separate calculation components, comparable on the nomenclature and structure;
non-residential part of the house - the isolated space part of the house occupied with the non-residential premises of public (social) appointment belonging to citizens non-residential premises for storage of vehicles and economic appointment (further - non-residential premises);
total area of the apartment (project) - the amount of the areas of living rooms, utility rooms, the built-in cases and its summer rooms, and also cold storage rooms;
total area of apartments (project) the apartment apartment house (residential part of the house) - the amount of total areas of apartments (project) houses (residential part of the house);
total area of non-residential part of the house - the amount of the areas of all floors (including technical, mansard, socle and basement) relating to non-residential part of the house;
total area of the one-apartment, including farmstead, and blocked apartment house - the amount of the areas of premises of the apartment (house) and total area of the utility rooms which are in the apartment (house);
the attached non-residential part of the house - the isolated space part of the house occupied with non-residential premises of public appointment and having general designs with the house located out of house amount;
cost in basic price level - the cost determined in accordance with the established procedure by estimate norms and the prices in estimate documentation;
cost in the current price level - the cost determined on the basis of the prices, rates created in accordance with the established procedure for settlement date (determinations) of cost;
the total structural volume of the apartment house (residential part of the house) - the amount of total structural volume is higher than mark + 0.000 (elevated part) and below this mark (underground part);
the total structural volume of non-residential part of the house - the amount of total structural volume is higher than mark + 0.000 (elevated part) and below this mark (underground part), the house relating to non-residential part.
3. For the purposes of this Instruction the following classification of the apartment houses by availability of the objects relating to the apartment house according to the project documentation on this house and located on one parcel of land provided for its construction is used:
3.1. apartment house;
3.2. the apartment house with non-residential part:
3.2.1. residential part of the house;
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Search in text CTRL-F
If you are guest on our site, you will work in Demo mode. In Demo mode you can see only first page of each document.
With full access you can
Database include more 65000 documents. You can find needed documents using search system.
For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions.
This section provides answers to questions set by users.
The document ceased to be valid since June 3, 2023 according to Item 2 of the Resolution of the Ministry of Architecture of the Republic of Belarus of April 12, 2023 No. 34