of October 7, 2025 No. 443
About approval of the List of requirements of industrial safety which violation attracts application of measures of operational impact, and also specific types of measures of operational impact, terms of their action (if necessary) concerning specific violations of requirements
According to subitem 2-1) of article 12-2 of the Law of the Republic of Kazakhstan "About civil protection", PRIKAZYVAYU:
1. Approve the enclosed List of requirements of industrial safety which violation attracts application of measures of operational impact, and also specific types of measures of operational impact, terms of their action (if necessary) concerning specific violations of requirements.
2. To provide to committee of industrial safety of the Ministry of Emergency Situations of the Republic of Kazakhstan:
1) state registration of this order in the Ministry of Justice of the Republic of Kazakhstan;
2) placement of this order on Internet resource of the Ministry of Emergency Situations of the Republic of Kazakhstan.
3. To impose control of execution of this order on the supervising vice-Minister of Emergency Situations of the Republic of Kazakhstan.
4. This order becomes effective since January 1, 2026 and is subject to official publication.
Minister of Emergency Situations of the Republic of Kazakhstan
Ch. Arinov
|
It is approved Ministry of national economy of the Republic of Kazakhstan |
|
Approved by the Order of the Minister of Emergency Situations of the Republic of Kazakhstan of October 7, 2025, No. 443
|
№ |
Requirements to subjects (objects) of control and supervision in the field of industrial safety |
Measure of operational impact |
Effective period of measure of operational impact | |
|
The list of requirements in the field of the state control and supervision in the field of industrial safety concerning hazardous production facilities | ||||
|
1. |
Availability of results and accomplishment of recommendations of examination of the technical devices which fulfilled normative service life |
prohibition of activities, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
2. |
Observance, established by the passport or the operation manual on regulation on timely updating of the technical devices which fulfilled normative service life |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
3. |
Availability of acts of the engineering certifications which are carried out when commissioning dangerous technical devices with participation of the state inspector |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
The list of requirements in the field of the state control and supervision in the field of industrial safety concerning hazardous production facilities in case of geological exploration, production and conversion of uranium | ||||
|
4. |
Non-admissions of acceptance in operation of the new and reconstructed objects having subquality work and departures from the project documentation |
prohibition of activities, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
5. |
Non-admission of use of the defective equipment, equipment, tool and individual protection equipment, and also their uses not to destination |
prohibition of activities, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
6. |
Non-admission of operation of electric equipment in cases: 1) availability defective protection and blocking devices (protective and working grounding, zero, maksimalnotokovy and protection against current of overload, blocking); 2) isolation violations, damage of the body (electric motor, actuator), failure of contacts; 3) availability on the body of flammable materials; 4) spontaneous its inclusions and shutdown; 5) lack of reliable barrier of conclusions of windings of electric motors; 6) lack of reliable fixing of cables in case of their input in the electric tool and other portable (portable) electric equipment; 7) lack of reliable fixing (to the bases, frames and others) if it is provided by electric equipment design |
prohibition of activities, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
7. |
Non-admission of works in case of defect of sensors of depths and tension or in case of their absence |
prohibition of activities, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
8. |
Non-admission of use of defective delivery pumps and pipelines |
prohibition of activities, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
9. |
Non-admission of operation of processing equipment which work is followed by allocation of dangerous and hazardous substances, in case of defective systems of ventilation |
prohibition of activities, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
The list of requirements in the field of the state control and supervision in the field of industrial safety concerning hazardous production facilities in case of production of beryllium, its connections and products from them | ||||
|
10. |
Availability of two inputs with automatic input of reserve from independent source of electric utility service for prevention to sudden stop of the equipment which can lead to accident |
prohibition of activities, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
11. |
Non-admission of accumulating of products of beryllium production in the reservoirs which are not adapted for conducting engineering procedure |
prohibition of activities, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
The list of requirements in the field of the state control and supervision in the field of industrial safety concerning hazardous production facilities in case of the address with sources of ionizing radiation | ||||
|
12. |
Non-admission of acceptance in operation of the new and reconstructed subjects to use of atomic energy having subquality work and departures from the project |
prohibition of activities, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
13. |
Ensuring continuous work of all main forced-air and exhaust ventilating installations in operating time of processing equipment. Non-admission of closing of ventilating latches and shiber, stitched and exhaust openings (channels) |
prohibition of activities, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
14. |
Non-admission use of the closed radiation sources in case of violation of their hermeticity, and also after fixed term of operation |
prohibition of activities, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
The list of requirements in the field of the state control and supervision in the field of industrial safety concerning hazardous production facilities in case of production of ftoristovodorodny acid | ||||
|
15. |
Availability of system of local suctions with subsequent their cleaning in places of possible allocation of vapors of acids and dust |
prohibition of activities, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
16. |
Availability of the gas analyzers blocked with emergency exhaust systems and giving of light and sound signals for continuous control of air of the working area in case of possible allocation of hazardous substances of the first and second classes of danger |
prohibition of activities, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
17. |
Availability on pipelines of the shutoff valves allowing to disconnect both all pipeline, and its certain sites from the working technology systems, to establish caps and to provide possibility of emptying, washing, purge and testing of pipelines for durability and hermeticity |
prohibition of activities, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
18. |
Availability of overflow pipes on reservoirs of the acids excluding possibility of overflow and spill of acids |
prohibition of activities, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
The list of requirements in the field of the state control and supervision in the field of industrial safety concerning hazardous production facilities in case of operation of heavy lift gears | ||||
|
19. |
Protection availability in places of possible contact of cargo ropes with the main or auxiliary trolley wires of the crane |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
20. |
Availability barrier of platforms and the galleries located on hoisting cranes for servicing, trailer beams of cranes of bridge type handrail with the device of continuous barrier low and intermediate communication |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
21. |
The non-admission of installation of the equipment and making of communication in the elevator shaft which are not relating to the elevator, steam lines and gas pipelines |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
22. |
The equipment of doors of the mine the automatic lock locking it before the cabin departs from the level of the landing (loading) platform on distance of 150 mm. The equipment of door of the mine closed manually except the automatic lock the device holding door in closed position |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
23. |
Availability automatically the opening and closed cover (shutters) of the hatch of the sidewalk elevator |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
24. |
Availability ventilating opening in elevator cabin with continuous barrier and continuous doors |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
25. |
Availability and operability of the limiter of speed. Availability of the device allowing to make check of its operation in case of movement of cabin (counterbalance) with working speed |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
26. |
Availability of limiting efficient limiters of load |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
27. |
Availability of operational chains and drafts of the watching cradle navigation system in vertical position |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
28. |
Availability on elevators of the efficient trailer switches limiting servicing zone |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
29. |
Availability of efficient systems of blocking of mechanisms of rise and turn of arrow in case of the elevator which is not exposed on portable support (outrigers) |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
30. |
Availability on elevators of the efficient device of blocking of system of raising of portable support in case of working provision of arrow |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
31. |
Availability on elevators of efficient systems of emergency lowering of cradle in case of refusal of hydraulic system, the electric drive or drive of the hydraulic pump |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
32. |
Availability of the efficient device protecting from spontaneous promotion of portable support during movement of the elevator |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
33. |
Availability of efficient indexes of tilt angle of the elevator |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
34. |
Availability on elevators of efficient systems of emergency stop of the engine the control panel, as in cradle, and the lower control panel |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
35. |
Availability operational the anemometer (for elevators with rise height more than 22 meters) |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
The list of requirements in the field of the state control and supervision in the field of industrial safety concerning hazardous production facilities in case of operation of the equipment working under pressure | ||||
|
36. |
Availability of the shutoff or locking regulating valves, devices for measurement of pressure, devices for measurement of temperature, safety devices, indexes of level of liquid |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
37. |
Availability on vessels for explosive, flammable substances, substances 1 and 2 of classes of danger of evaporators with fire or gas heating of the bringing lines from the pump or the compressor, backpressure valves automatically closed pressure from vessel, the backpressure valve between the pump (compressor) and shutoff valves of vessel |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
38. |
Availability of safety valves on discharge pipelines and on pulse lines in places of possible accumulation of condensate of drainage devices, for removal of condensate |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
39. |
Non-admission of filling with gas of tanks or barrels with expired for surveys |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
40. |
Non-admission of filling with gas of tanks or barrels in case of absence or defective fittings and instrumentations |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
41. |
Non-admission of filling with gas of tanks or barrels in which there is other gas for which they are intended |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
42. |
Non-admission of filling of cylinders with expired for surveys, with review period of porous weight |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
43. |
Non-admission of filling with the damaged cylinder body, the defective gate |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
44. |
Non-admission of filling of cylinders if there is no proper coloring and texts |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
45. |
Non-admission of filling of cylinders if there is no excessive pressure of gas |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
46. |
Non-admission of filling of cylinders if there are no established brands |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
47. |
Availability and placement of destructive safety devices on copper |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
48. |
Availability on copper of pipelines of supply of nutritious or network water |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
49. |
Availability of systems of purge of copper and descent of water in case of copper stop |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
50. |
Availability of systems of purge of the boiler superheater and steam line |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
51. |
Availability of pipelines of water drainage or couple in case of kindling and stop |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
52. |
Availability on coppers of the devices protecting from increase in pressure (safety devices) |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
53. |
Availability on coppers of devices of safety, nutritious devices |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
|
54. |
Availability on coppers, except for direct-flow, at least two indexes of water level of direct action |
suspension of operations, performance of works by subject (object) of control and supervision or separate types of activity (works) |
90 calendar days |
|
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions. This section provides answers to questions set by users.