Document from CIS Legislation database © 2012-2026 CIS Legislation Company

THE JOINT ORDER OF THE MINISTER OF INDUSTRY AND CONSTRUCTION OF THE REPUBLIC OF KAZAKHSTAN AND THE DEPUTY PRIME MINISTER - THE MINISTER OF NATIONAL ECONOMY OF THE REPUBLIC OF KAZAKHSTAN

of June 30, 2026 No. 342, on June 30, 2026 No. 96

About modification and amendments in the joint order of the Minister of investments and development of the Republic of Kazakhstan of November 19, 2018 No. 807 and the Minister of national economy of the Republic of Kazakhstan of November 26, 2018 No. 81 "About approval of criteria for evaluation of risk degree and checking sheets in the field of architecture, town planning and construction behind activities of subjects of architectural, town-planning and construction activities"

According to articles 141 and 143 of the Entrepreneurial code of the Republic of Kazakhstan and the subitem 32) of article 24 of the Construction Code of the Republic of Kazakhstan, we ORDER:

1. Bring in the joint order of the Minister of investments and development of the Republic of Kazakhstan of November 19, 2018 No. 807 and the Minister of national economy of the Republic of Kazakhstan of November 26, 2018 No. 81 "About approval of criteria for evaluation of risk degree and checking sheets in the field of architecture, town planning and construction behind activities of subjects of architectural, town-planning and construction activities" (further - the Joint order) (it is registered in the Register of state registration of regulatory legal acts for No. 17818) the following changes and amendments:

state preamble in the following edition:

"According to articles 141 and 143 of the Entrepreneurial code of the Republic of Kazakhstan and the subitem 32) of article 24 of the Construction Code of the Republic of Kazakhstan, we ORDER:";

add Item 1 with subitem 3-1) of the following content:

"3-1) checking leaf in the field of architecture, town planning and construction concerning persons performing engineering-geological researches for construction according to appendix 3-1 to this joint order;";

7) of Item 1 to state the subitem in the following edition:

"7) checking leaf in the field of architecture, town planning and construction concerning the organization carrying-out expert works on technical inspection of reliability and stability of buildings and constructions, according to appendix 7 to this joint order;";

add Item 1 with subitem 8-1) of the following content:

"8-1) checking leaf in the field of architecture, town planning and construction concerning bodies of architecture and town planning, according to appendix 8-1 to this joint order;";

14) of Item 1 to state the subitem in the following edition:

"14) checking leaf in the field of architecture, town planning and the construction concerning the organization which are carrying out expert works on technical inspection of reliability and stability of buildings and constructions on compliance to requirements according to appendix 17 to this joint order;";

add Item 1 with subitem 18-1) of the following content:

"checking leaf in the field of architecture, town planning and construction concerning bodies of architecture and town planning on compliance to requirements, according to appendix 21-1 to this joint order;";

in Criterion for evaluation of risk degree and risk management in the field of architecture, town planning and construction when conducting checks concerning subjects of architectural, town-planning and construction activities approved by the specified joint order:

state Item 1 in the following edition:

"1. These criteria for evaluation of risk degree in the field of architecture, town planning and construction when conducting checks concerning subjects of architectural, town-planning and construction activities (further – Criteria) are developed according to articles 141 and 143 of the Entrepreneurial code of the Republic of Kazakhstan (further - the Code), the order of the acting minister of national economy of the Republic of Kazakhstan of July 31, 2018 No. 3 "About approval of form of checking leaf" (No. 48 "About approval of Rules of forming by regulatory state agencies of system of assessment and risk management is registered in the Register of state registration of regulatory legal acts for No. 17371) and the order of the acting minister of national economy of the Republic of Kazakhstan of June 23, 2022 and about introduction of amendments to the order of the acting minister of national economy of the Republic of Kazakhstan of July 31, 2018 No. 3 "About approval of Rules of forming by state bodies of system of risks assessment and form of checking sheets" (it is registered in the Register of state registration of regulatory legal acts for No. 28577).";

3) of Item 2 to state the subitem in the following edition:

"3) subjects (objects) of control and supervision – persons performing author's maintenance; the non-state certification centers for certification of the engineering employees participating in design process and constructions; project organization (general designer); the organizations the carrying-out expert works on technical inspection of reliability and stability of buildings and constructions; licensees; contractor (prime contractor); the legal entities who are carrying out complex non-departmental expertize of construction projects; the organizations the rendering engineering project management services of construction of facilities; customer (builder); the legal entities and physical persons exercising technical supervision; bodies of architecture and town planning; persons the performing engineering-geological researches for construction;";

state Item 6 in the following edition:

"6. For assessment of degree of risks by subjective criteria for carrying out preventive control and supervision with visit of subject (object) of control and supervision the following sources of information are used:

1) results of monitoring of the reporting and the data represented by the subject of control and supervision;

2) results of the previous checks and preventive control with visit of subjects (objects) of control and supervision;

3) availability and the number of the confirmed claims and addresses;

For assessment of degree of risks by subjective criteria for conducting check on compliance to requirements the following sources of information are used:

1) availability and the number of the confirmed claims and addresses;

2) results of monitoring of the data represented by the subject of control and supervision;

3) results of the previous checks and preventive control with visit of subjects (objects) of control and supervision.";

to be reworded as follows appendix 1 to Criteria for evaluation of risk degree and risk management in the field of architecture, town planning and construction when conducting checks concerning subjects of architectural, town-planning and construction activities according to appendix 1 to this order;

to be reworded as follows appendix 2 to Criteria for evaluation of risk degree and risk management in the field of architecture, town planning and construction when conducting checks concerning subjects of architectural, town-planning and construction activities according to appendix 2 to this order;

to be reworded as follows appendix 3 to Criteria for evaluation of risk degree and risk management in the field of architecture, town planning and construction when conducting checks concerning subjects of architectural, town-planning and construction activities according to appendix 3 to this order;

to be reworded as follows appendix 4 to Criteria for evaluation of risk degree and risk management in the field of architecture, town planning and construction when conducting checks concerning subjects of architectural, town-planning and construction activities according to appendix 4 to this order;

to be reworded as follows appendix 2 to the Joint order according to appendix 5 to this order;

Add the joint order with appendix 3-1, according to appendix 6 to this joint order;

to be reworded as follows appendix 4 to the Joint order according to appendix 7 to this order;

to be reworded as follows appendix 5 to the Joint order according to appendix 8 to this order;

to be reworded as follows appendix 7 to the Joint order according to appendix 9 to this order;

Add the joint order with appendix 8-1, according to appendix 10 to this joint order;

to be reworded as follows appendix 15 to the Joint order according to appendix 11 to this order;

to be reworded as follows appendix 16 to the Joint order according to appendix 12 to this order;

to be reworded as follows appendix 17 to the Joint order according to appendix 13 to this order;

to be reworded as follows appendix 18 to the Joint order according to appendix 14 to this order;

to be reworded as follows appendix 19 to the Joint order according to appendix 15 to this order;

to be reworded as follows appendix 20 to the Joint order according to appendix 16 to this order;

to be reworded as follows appendix 21 to the Joint order according to appendix 17 to this order;

Add the joint order with appendix 21-1, according to appendix 18 to this joint order;

to be reworded as follows appendix 22 to the Joint order according to appendix 19 to this order.

2. To provide to committee on cases of construction and housing and communal services of the Industry ministry and construction of the Republic of Kazakhstan in the procedure established by the legislation:

1) state registration of this order in the Ministry of Justice of the Republic of Kazakhstan;

2) placement of this order on Internet resource of the Industry ministry and construction of the Republic of Kazakhstan after its official publication.

3. To impose control of execution of this order on the supervising vice-Minister of Industry and construction of the Republic of Kazakhstan.

4. This order becomes effective since July 1, 2026 and is subject to official publication.

The deputy prime minister is the Minister of national economy of the Republic of Kazakhstan


 

__________ S. Zhumangarin

Minister of Industry and constructions of the Republic of Kazakhstan

 

__________ E.Nagaspayev

It is approved

Committee on legal statistics and special accounting of the Prosecutor General's Office of the Republic of Kazakhstan

 

 

Appendix 1

to the joint Order of the Minister of Industry and construction of the Republic of Kazakhstan and the Deputy prime minister - the Minister of national economy of the Republic of Kazakhstan of June 30, 2026 No. 342, on June 30, 2026 No. 96

Appendix 1

to Criteria for evaluation of risk degree and risk management in the field of architecture, town planning and construction when conducting checks concerning subjects of architectural, town-planning and construction activities

Extents of violations of requirements in the field of architecture, town planning and construction for carrying out preventive control with visit of subject (object) of control and supervision

№ of payment order

Name of requirements

Extent of violation

Customer (builder)

1

Use of the parcel of land for building (including laying of communications, engineering training of the territory, improvement, gardening and other types of arrangement of the site) according to the approved project documentation and respect for purpose or the servitude, zoning of the territory, red lines and lines of regulation of building

rough

2

Compliance of the performed (performed) installation and construction works, the applied construction materials (products, designs) and the equipment to the approved project decisions and the state (interstate) standard rates, including on ensuring durability, stability, reliability of the bearing and protecting designs and operational qualities of buildings (constructions)

rough

3

Availability of permission of the relevant organizations to works in zone of overhead power transmission lines and communication lines, in strip of withdrawal of the railroads, in zones of side job of the parcels of land mining operations located on the building site

rough

4

Availability of written consent and presence of the representative of the relevant organization operating lines and constructions of communication

rough

5

Rejection of measures to arrangement of places of excavation, and also building sites after the termination of construction and repair also blocking up of the yards, streets and areas construction materials

rough

6

Availability of the approved design estimates

rough

7

Availability of positive experimental testimony of projects, including repeated experimental testimony of projects in case of adjustment

rough

8

Availability of the agreement signed between the customer (the investor of the project or program) and the contractor (prime contractor) elected by it

insignificant

9

Availability at contract organization of the state license for the right of implementation of the licensed architectural, town-planning and construction types of activity on category

rough

10

Availability of the contract with the accredited legal entities performing engineering services in technical supervision

rough

11

Availability of the contract for implementation of author's maintenance with person who developed project (project and estimate) documentation (developer of the project or the certified specialist)

rough

12

Availability of the contract with the accredited organization for rendering engineering project management services

insignificant

13

Providing asset construction with the customer (owner) with maintenance of technical supervision and author's maintenance

rough

14

Availability of the corresponding number of specialists for implementation of technical supervision by the made accredited legal entities (at least 3 specialists having the certificate on accomplishment of technical supervision)

rough

15

Availability of developed project (project and estimate) documentation for preservation (degreasing) of incomplete object which construction was suspended

rough

16

Availability of project (project and estimate) documentation when implementing dismantle and demolition (post-utilization) of buildings and constructions

rough

17

Availability of the contract with the accredited legal entity performing technical inspection of reliability and stability of buildings and constructions

insignificant

18

Availability of the contract with the physical person having the certificate of the specialist on technical inspection of reliability and stability of buildings and constructions and who is individually performing activities on objects of the third level of responsibility

insignificant

19

Ensuring provision of reliable basic data, the archive materials provided to the specialist (specialists) for carrying out technical inspection

rough

20

Ensuring execution of withdrawals and instructions for results of technical inspection

rough

21

Ensuring suspension of works in case of their implementation with departure from project (project and estimate) documentation and normative requirements

rough

22

Availability of approval and supporting documents in case of variation from the approved design estimates

rough

23

Observance of the requirement for ensuring availability of objects to disabled people and other handicapped national groups

rough

24

Notice in writing availability from the contractor (prime contractor) about readiness of object

considerable

25

Availability of the declaration of conformity

rough

26

Availability of the conclusion about quality of installation and construction works

rough

27

Availability of the conclusion about compliance of the performed works to the approved project

rough

28

Availability of the conclusion about compliance of construction object to requirements of fire safety

rough

29

Availability of approval of the local executive body of the capital, areas, the cities of republican value exercising the state architectural construction supervision and supervision of the conclusion about quality of installation and construction works

rough

30

Availability of the final report of examination of the quality of works and materials issued by the National center of quality of road assets for construction object, reconstruction and capital repairs of highways

rough

31

Availability of the approved acceptance act of the constructed object in operation

rough

32

Ensuring taking measures by the contractor to elimination of the revealed defects in the period of the guaranteed term

rough

33

Availability in the contract between the customer and the contractor (prime contractor) for construction (the warranty period for the bearing designs, roof and outside walls (facades) of buildings which took place at least five years, except for – at least ten years, from the date of acceptance of object in operation) the corresponding warranty period of the constructed object established depending on normative useful life

rough

34

Availability of the approved outline sketch

considerable

Project organization (general designer)

1

Designing of settlements, forming of residential districts, improvement of again mastered and reconstructed territories and settlements without ensuring access to handicapped national groups to residential, public and factory buildings, constructions and rooms

rough

2

Designing of the parkings placed in the territory of residential and public buildings without places for personal vehicles of handicapped national groups

rough

3

Designing of underground space for placement of autoparkings, garages and constructions of the engineering equipment of residential and public buildings without engineering-geological conditions of the platform of construction

rough

4

Project development of construction and reconstruction (re-planning, re-equipment) rooms (separate parts) of the existing buildings and constructions including connected with change of the bearing and protecting designs, engineering systems and the equipment, without requirements of initial materials (architectural and planning task, vertical planning marks, vykopirovka from the draft of the detailed layout, standard cross profiles of roads and streets, specifications, schemes of routes of outside engineering networks, the questionnaire and topographical filming)

rough

5

Project development with the violations which are directly influencing durability, stability and reliability of object

rough

Persons the performing engineering-geological researches for construction

1

Issue of the technical report (conclusion) of engineering-geological researches of the legislation of the Republic of Kazakhstan and the state standard rates executed with violation of requirements in the field of architectural, town-planning and construction activities

rough

Contractor (prime contractor)

1

Availability of the approved (reapproved) project (project and estimate) documentation

rough

2

Observance by the contractor (general contractor) of obligations on implementation of all types and forms of own production supervision of quality of construction (entrance, operational, acceptance, laboratory, geodetic)

rough

3

Compliance of the performed (performed) installation and construction works, the applied construction materials (products, designs) and the equipment to the approved project decisions and the state (interstate) standard rates, including on ensuring durability, stability, reliability of the bearing and protecting designs and operational qualities of buildings (constructions)

rough

paid document

Full text is available with an active Subscribtion after logging in.

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Search in text CTRL-F

Demo Access

If you are guest on our site, you will work in Demo mode. In Demo mode you can see only first page of each document.


Full Access

With full access you can

  • see full text
  • see original text of document in Russian
  • download attachment (if exist)
  • see History and statistics

Get Full Access Now

Effectively work with search system

Database include more 65000 documents. You can find needed documents using search system.
For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions.
This section provides answers to questions set by users.

Search engine created by CIS Legislation Company