Document from CIS Legislation database © 2012-2026 CIS Legislation Company

ORDER OF THE MINISTER OF INDUSTRY AND CONSTRUCTION OF THE REPUBLIC OF KAZAKHSTAN

of June 26, 2026 No. 336

About introduction of amendments to some orders

I ORDER:

1. Bring in the order of the Minister of Industry and construction of the Republic of Kazakhstan of May 29, 2026 No. 268 "About approval of forms of the conclusions about quality of installation and construction works and compliance of the performed works to the construction project, the declaration of conformity" (it is registered in the Register of state registration of regulatory legal acts for No. 38832) the following changes:

in appendix 1 to the order in the form of the conclusion about the quality of installation and construction works approved by the specified order:

state Items 3 and 4 in following editions:

"3. Estimated cost on the approved project (design estimates): in total ___ thousands of tenges, including installation and construction works ___ thousands of tenges, equipment, tool and stock ___ thousands of tenges;

4. Estimated cost of the fixed assets accepted in operation ___ thousands of tenges

including:

cost of installation and construction works ___ thousands of tenges;

cost of the equipment, tool and stock ___ thousands of tenges;".

2. Bring in the order of the Minister of Industry and construction of the Republic of Kazakhstan of June 09, 2026 No. 291 "About approval of form of the acceptance act of construction object in operation" (it is registered in the Register of state registration of regulatory legal acts for No. 38940) the following changes:

in the form of the acceptance act of construction object in operation, approved by the specified order:

state Items 7 and 8 in the following edition:

"7. Estimated cost on the approved project (project-estimate documentation): in total ___ thousands of tenges, including installation and construction works ___ thousands of tenges, equipment, tool and stock ___ thousands of tenges;

8. Estimated cost of the fixed assets accepted in operation ___ thousands of tenges including: cost of installation and construction works ___ thousands of tenges; cost of the equipment, tool and stock ___ thousands of tenges;".

paid document

Full text is available with an active Subscribtion after logging in.

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Search in text CTRL-F

Demo Access

If you are guest on our site, you will work in Demo mode. In Demo mode you can see only first page of each document.


Full Access

With full access you can

  • see full text
  • see original text of document in Russian
  • download attachment (if exist)
  • see History and statistics

Get Full Access Now

Effectively work with search system

Database include more 65000 documents. You can find needed documents using search system.
For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions.
This section provides answers to questions set by users.

Search engine created by CIS Legislation Company