of January 14, 2022 No. 24
About change of resolutions of Council of Ministers of the Republic of Belarus of March 1, 2016 No. 169 and of January 18, 2019 No. 32
Council of Ministers of the Republic of Belarus DECIDES:
1. Make changes to the following resolutions of Council of Ministers of the Republic of Belarus:
to be reworded as follows the cross-industry package of measures for increase in electric power consumption till 2025 approved by the resolution of Council of Ministers of the Republic of Belarus of March 1, 2016 No. 169, it (is applied);
to be reworded as follows the list of investment projects on construction of peak and reserve power sources and installation of electric boilers approved by the resolution of Council of Ministers of the Republic of Belarus of January 18, 2019 No. 32, it (is applied).
2. This resolution becomes effective after its official publication and extends the action to the relations which arose since January 1, 2021.
Prime Minister of the Republic of Belarus
R. Golovchenko
______________________________
* Are determined according to the legislation among the specified organizations.
** The final decision on economic feasibility of realization of project data will be made following the results of development of feasibility statements after cost determination of works on construction of the power networks and substations necessary for ensuring electric utility service of the specified boiler rooms.
No. 169 is approved by the Resolution of Council of Ministers of the Republic of Belarus of March 1, 2016
(in edition of the Resolution of Council of Ministers of the Republic of Belarus of January 14, 2022 No. 24)
Cross-industry package of measures for increase in electric power consumption till 2025
|
Name of actions |
Contractors |
Year zaver- |
Ustanov- |
Increase electro- |
|
|
||||
|
|
||||
|
1. The organization of koltseraskatny production and production ободьев career for dump trucks with a loading capacity of 90-450 tons |
JSC Plant of Devices of Automatic Control |
2024 |
7,4 |
30,6 |
|
2. Production of high-precision high-strength iron casting in branch of JSC "Managing company of MINSK MOTOR PLANT holding of. Columns. First priority of construction |
JSC Managing Company of Holding MINSKY MOTORNY ZAVOD |
2022 |
11,1 |
7,0 |
|
3. Purchase of technology and the equipment for the line of coloring of nodes of plumage of dump trucks with a loading capacity of 30-320 tons and special equipment, ободьев for dump trucks with a loading capacity of 30-55 tons with coloring implementation by 2-K materials |
JSC BELAZ – managing company of BELAZ-HOLDING holding |
2020 |
2,2 |
7,1 |
|
4. Implementation of investment actions for technical retrofitting of production |
JSC MTZ |
2025 |
17,0 |
39,0 |
|
5. Implementation of high-productive engineering procedure of production of castings of the increased accuracy of high-strength and gray cast iron |
Atlant Ltd |
2024 |
5,0 |
10,9 |
|
6. Performance improvement of extra oven processing of steel in the electrosteel-smelting workshop |
JSC BMZ – managing company of BMK holding |
2019 |
50,0 |
113,0 |
|
7. Complex reconstruction of PGU-3 |
" |
2023 |
5,0 |
25,0 |
|
8. Electrification of sites Gomel – Zhlobin – Osipovichi and Zhlobin – Kalinkovichi. Third queue. The site Zhlobin – Kalinkovichi |
Belarusian railroad |
2021 |
98,0 |
36,0 |
|
9. Electrification of sites Baranovichi – Luninets – Sitnitsa and Sitnitsa – Kalinkovichi1 |
" |
2025 |
237,0 |
85,0 |
|
10. Creation of production of spring plugs for railway tracks based on JSC Baranovichi Plant of Automatic Transfer Lines |
JSC Baranovichi Plant of Automatic Transfer Lines |
2021 |
0,719 |
2,46 |
|
11. Illumination of trunk line roads |
RUP "Brestavtodor" |
2022 |
0,02 |
0,08 |
|
12. Illumination of trunk line roads |
RUP "Vitebskavtodor" |
2020 |
0,01 |
0,039 |
|
13. Illumination of trunk line roads |
RUP "Gomelyavtodor" |
2023 |
0,05 |
0,18 |
|
14. Illumination of trunk line roads |
RUP "Minskavtodor-center" |
2020 |
0,25 |
0,195 |
|
15. Illumination of trunk line roads |
RUP "Mogilevavtodor" |
2020 |
0,03 |
0,12 |
|
16. Reconstruction of electric utility power grids on SMALLPOX "Greenhouse facility" (increase in capacity) |
JSC DORORS |
2019 |
6,0 |
5,78 |
|
17. Construction of the educational and training case in the territory of UO "Belarusian State Academy of Aircraft" |
UO "Belarusian State Academy of Aircraft" |
2025 |
0,63 |
0,86 |
|
18. Production organization of medical glass and products from it with implementation of innovative technologies and laser cutting of steklotrubka |
JSC Belmedsteklo |
2021 |
1,6 |
7,45 |
|
19. Construction of the steklovarenny furnace of borosilicate glass of medical appointment |
" |
2025 |
0,7 |
6,048 |
|
20. Construction of new object " JSC Grodno Glass Plant production of glass container of "Auls", at the address: SEZ "Grodnoinvest", site No. 4, "Auls", Grodno" |
JSC Grodno Glass Plant |
2022 |
6,0 |
42,048 |
Full text is available with an active Subscribtion after logging in.
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Search in text CTRL-F
If you are guest on our site, you will work in Demo mode. In Demo mode you can see only first page of each document.
With full access you can
Database include more 65000 documents. You can find needed documents using search system.
For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions.
This section provides answers to questions set by users.