RESOLUTION OF COUNCIL OF MINISTERS OF THE REPUBLIC OF BELARUS

of March 1, 2016 No. 169

About approval of comprehensive plan of development of the electrical power sphere till 2025 taking into account input of the Belarusian nuclear power plant and cross-industry package of measures for increase in electric power consumption till 2025

(as amended on 20-10-2022)

The Council of Ministers of the Republic of Belarus DECIDES:

1. Approve enclosed:

comprehensive plan of development of the electrical power sphere till 2025 taking into account input of the Belarusian nuclear power plant (further - comprehensive plan);

cross-industry package of measures for increase in electric power consumption till 2025 (further - cross-industry package of measures).

2. Responsible for coordination of work on accomplishment of comprehensive plan to determine the Department of Energy.

2-1. To impose control over the implementation of cross-industry package of measures on Department for energy efficiency of the State committee on standardization.

3. To perform financing of actions of comprehensive plan and cross-industry package of measures at the expense of the means of the republican budget provided within implementation of state programs, own means of the organizations - contractors of comprehensive plan, and also other sources.

4. To represent to the republican state bodies and other state organizations subordinated to the Government of the Republic of Belarus, regional executive committees and the Minsk Gorispolkom annually till February 15 of the year following reporting:

in the Department of Energy - information on the course of accomplishment of comprehensive plan;

in Department on energy efficiency of the State committee on standardization - information on the course of accomplishment of cross-industry package of measures.

Inform Council of Ministers of the Republic of Belarus annually till March 1 of the year following reporting:

To Department of Energy - about the course of accomplishment of the actions included in comprehensive plan;

To department on energy efficiency of the State committee on standardization - about the course of accomplishment of the actions included in cross-industry package of measures.

Prime Minister of the Republic of Belarus

A. Kobyakov

Approved by the Resolution of Council of Ministers of the Republic of Belarus of March 1, 2016 , No. 169

Comprehensive plan of development of the electrical power sphere till 2025 taking into account input of the Belarusian nuclear power plant

Name of actions

Realization term

Contractors

The expected result

Realization of technical actions

1. Completion of construction of the Belarusian nuclear power plant

2019–2022

Ministry of Energy, republican unitary enterprise "Belarusian Nuclear Power Plant"

commissioning of the Belarusian nuclear power plant (2400 MW)

2. Development and implementation of subprogrammes (Sections of subprogrammes) of the state programs, the industry development program of power industry including:

2016–2020,
2021–2025

Ministry of Energy, GPO "Belenergo"

share of the dominating resource (gas) in production of heat and electrical energy:

in 2020 – 70 percent

in 2025 – 60 percent

the balanced development and upgrade of the generating sources based on implementation of innovative technologies and conclusion from operation physically and the obsolete energy equipment

2016–2025

Ministry of Energy

the total relation of installed capacity to the maximum actual load in power supply system:

in 2020 – 160 percent

in 2025 – 155 percent

specific weight of accumulated depreciation in original cost of fixed assets of the organizations for production of electricity:

in 2020 – no more than 43 percent

in 2025 – less than 45 percent

construction and reconstruction of power networks and substations, including in areas of the housing estate, the individual housing estate and in rural settlements, of annually at least 1500 km

2016–2025

"

the relation of average daily number of violations of electric utility service of settlements to total quantity of settlements – percent 0,4

specific weight of accumulated depreciation in original cost of fixed assets of the organizations for construction and reconstruction of power networks and substations:

in 2020 – 50 percent

in 2025 – 45 percent

construction and reconstruction of thermal networks, including infrastructures to housing (amounts of replacement of thermal networks are determined annually taking into account their technical condition and the allocated financing)

2016–2025

Ministry of Energy, GPO "Belenergo"

specific weight of accumulated depreciation in original cost of fixed assets of the organizations for construction and reconstruction of thermal networks:

in 2020 – 45 percent

in 2025 – 45 percent

Warning!!!

This is not a full text of document! Document shown in Demo mode!

If you have active License, please Login, or get License for Full Access.

With Full access you can get: full text of document, original text of document in Russian, attachments (if exist) and see History and Statistics of your work.

Get License for Full Access Now

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.

Search engine created by SoyuzPravoInform LLC.