LAW OF UKRAINE

of June 22, 2012 No. 5021-VI

About introduction of amendments to some laws of Ukraine concerning payment for accession to networks of subjects of natural monopolies

The Verkhovna Rada of Ukraine decides:

I. Make changes to the following laws of Ukraine:

1. In the Law of Ukraine "About power industry" (Sheets of the Verkhovna Rada of Ukraine, 1998 No. 1, Art. 1 with subsequent changes):

Article 1 to add 1) with paragraphs of such content:

"the electrotransfer organization - the subject of managing performing business activity on transfer of electrical energy according to the license;

the place of accession (accession point) of electroinstallation - the existing or designed border of balance sheet accessory of electroinstallations of the consumer or customer;

the place of ensuring (providing point) the capacity (recommended for accession) - the place (point) in the existing power networks of the electrotransfer organization from which the electrotransfer organization provides development of power networks for the purpose of accession of electroinstallation of the customer of the corresponding capacity or accession of the generating capacities;

electroinstallation accession (further - accession) - provision of service by the electrotransfer organization to the customer on creation of technical capability for transfer (acceptance) to the place of accession of electroinstallation of the customer of the corresponding capacity to power networks of the electrotransfer organization (including new built) electrical energy of necessary amount with observance of indicators of its quality and reliability;

development of power networks - new construction, reconstruction or technical retrofitting of power generation facilities;

standard accession - electroinstallation accession (except the electroinstallations intended for production of electrical energy) the customer to the operating networks of the electrotransfer organization on the distance which is not exceeding 300 meters in a straight line from the place of ensuring capacity to the place of accession which is differentiated on capacity degrees: the first degree - to 16 kW inclusive; the second degree - from 16 kW to 50 kW inclusive; the third degree - from 50 kW to 160 kW inclusive;

paid document

Full text is available with an active Subscribtion after logging in.

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Search in text CTRL-F

Demo Access

If you are guest on our site, you will work in Demo mode. In Demo mode you can see only first page of each document.


Full Access

With full access you can

  • see full text
  • see original text of document in Russian
  • download attachment (if exist)
  • see History and statistics

Get Full Access Now

Effectively work with search system

Database include more 65000 documents. You can find needed documents using search system.
For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions.
This section provides answers to questions set by users.

Search engine created by CIS Legislation Company