THE ORDER OF THE FEDERAL SERVICE OF THE RUSSIAN FEDERATION ON ECOLOGICAL, TECHNOLOGY AND ATOMIC SUPERVISION

of November 28, 2016 No. 501

About approval of federal regulations and rules of industrial safety "Rules of industrial safety in case of development of oil fields by mine method"

According to subitem 5.2.2.16 (1) the Regulations on Federal Service for Environmental, Technological and Nuclear Supervision approved by the order of the Government of the Russian Federation of July 30, 2004 No. 401 (The Russian Federation Code, 2004, No. 32, Art. 3348; 2006, No. 5, Art. 544; No. 23, Art. 2527; No. 52, Art. 5587; 2008, No. 22, Art. 2581; No. 46, Art. 5337; 2009, No. 6, Art. 738; No. 33, Art. 4081; No. 49, Art. 5976; 2010, No. 9, Art. 960; No. 26, Art. 3350; No. 38, Art. 4835; 2011, No. 6, Art. 888; No. 14, Art. 1935; No. 41, Art. 5750; No. 50, Art. 7385; 2012, No. 29, Art. 4123; No. 42, Art. 5726; 2013, No. 12, Art. 1343; No. 45, Art. 5822; 2014, No. 2, Art. 108; No. 35, Art. 4773; 2015, No. 2, Art. 491; No. 4, Art. 661; 2016, to No. 28, of the Art. 4741), I order:

1. Approve the federal regulations and rules of industrial safety attached to this order "Rules of industrial safety in case of development of oil fields by mine method".

2. This order becomes effective after six months after its official publication.

Head

A. V. Alyoshin

Approved by the Order of the Federal Service of the Russian Federation on ecological, technology and atomic supervision of November 28, 2016 No. 501

Federal regulations and rules of industrial safety "Rules of industrial safety in case of development of oil fields by mine method"

I. Basic provisions

1. These Federal regulations and rules of industrial safety "Rules of industrial safety in case of development of oil fields by mine method" (further - Rules) are developed according to requirements of the Federal Law of July 21, 1997 No. 116-FZ "About industrial safety of hazardous production facilities" (The Russian Federation Code, 1997, No. 30, Art. 3588; 2000, No. 33, Art. 3348; 2003, No. 2, Art. 167; 2004, No. 35, Art. 3607; 2005, No. 19, Art. 1752; 2006, No. 52, Art. 5498; 2009, No. 1, Art. 17, Art. 21; No. 52, Art. 6450; 2010, No. 30, Art. 4002; No. 31, Art. 4195, Art. 4196; 2011, No. 27, Art. 3880; No. 30, Art. 4590, Art. 4591, Art. 4596; No. 49, Art. 7015, Art. 7025; 2012, No. 26, Art. 3446; 2013, No. 9, Art. 874; No. 27, Art. 3478; 2015, No. 1, Art. 67; No. 29, Art. 4359; 2016, No. 23, the Art. 3294), the Law of the Russian Federation of February 21, 1992 No. 2395-1 "About subsoil" (Sheets of the Congress of People's Deputies of the Russian Federation and the Supreme Council of the Russian Federation, 1992, No. 16, Art. 834; Russian Federation Code, 1995, No. 10, Art. 823; 1999, No. 7, Art. 879; 2000, No. 2, Art. 141; 2001, No. 21, Art. 2061; No. 33, Art. 3429; 2002, No. 22, Art. 2026; 2003, No. 23, Art. 2174; 2004, No. 27, Art. 2711; No. 35, Art. 3607; 2006, No. 17, Art. 1778; No. 44, Art. 4538; 2007, No. 27, Art. 3213; No. 49, Art. 6056; 2008, No. 18, Art. 1941; No. 29, Art. 3418, 3420; No. 30, Art. 3616; 2009, No. 1, Art. 17; No. 29, Art. 3601; No. 52, Art. 6450; 2010, No. 21, Art. 2527; No. 31, Art. 4155; 2011, No. 15, Art. 2018, 2025; No. 30 (p. I), Art. 4567, 4570, 4572, 4590; No. 48, Art. 6732; No. 49 (p. I), Art. 7042; No. 50, Art. 7343, 7359; 2012, No. 25, Art. 3264; No. 31, Art. 4322; No. 53, Art. 7648; 2013, No. 19, Art. 2312; No. 30, Art. 4060, 4061; No. 52, Art. 6961, 6973; 2014, No. 26, Art. 3377; No. 30, Art. 4261, 4262; No. 48, Art. 6647; 2015, No. 1, Art. 11, 12, 52; No. 27, Art. 3996; No. 29, Art. 4350, 4359; 2016, No. 15, Art. 2066; 2016, No. 27, Art. 4212).

2. Rules are obligatory for all heads, specialists and employees of the organizations operating hazardous production facilities (further - OPO) on which development of oil fields by underground method (further - oil mines), the organizations which are engaged in designing, construction of oil mines, designing, production, installation, operation and repair of the technical devices used in oil mines, the third parties performing the activities in oil mines, professional rescue units is conducted (further - PASF), employees of the organizations which activities are connected with visit of oil mines.

3. These rules establish requirements in the field of industrial safety to the organization operating OPO and are directed to the prevention of accidents and incidents in oil mines and on ensuring readiness of the organization operating OPO to localization and mitigation of consequences of accidents.

4. Reduction of the operating oil mines in compliance with requirements of these rules is performed in the terms established by the head of the organization operating OPO (further - the head of the organization).

Before reduction of the operating oil mines in compliance with requirements of these rules by the head of the organization for the purpose of ensuring safe operation of oil mines will organize development technically of reasonable actions, data on which in notifying procedure go to territorial authority of Rostekhnadzor.

5. In these rules the terms and their determinations given in appendix No. 1 to these rules are used.

II. General requirements to the organization of works

6. Transfer is allowed by the administrative document of the head of the organization of obligations for the organization and implementation of production control over observance of requirements of industrial safety to the isolated structural divisions of the organization operating OPO provided that in these isolated structural divisions the organization and implementation of production supervision correspond to Rules of the organization and implementation of production control over the observance of requirements of industrial safety on hazardous production facility approved by the order of the Government of the Russian Federation of March 10, 1999 No. 263 (The Russian Federation Code 1999, No. 11, of Art. 1305; 2005, No. 7, Art. 560; 2013, No. 31, Art. 4214; 2014, No. 32, the Art. 4499) (further - the isolated structural division).

7. In the organization operating OPO or in its isolated structural divisions the service which tasks include ensuring aerological safety (further - AB) is created.

8. Are established by the organizational and administrative document of the isolated structural division the list of persons having the right to issue tasks (further - the job specification), procedure for issue of job specifications to work and procedure for the admission of workers to accomplishment of job specifications.

The job specification is drawn up in writing.

It is forbidden to issue the job specification on work in places in which there are violations of requirements of industrial safety, safety of conducting mining operations, safety of conducting works on oil extraction, except works on elimination of violations.

In case of identification of violations of requirements of industrial safety, safety of conducting mining operations, safety of works on oil extraction of work stop and the separate job specification on elimination of the revealed violations is issued.

9. Works of the increased danger in the oil mine are performed according to Federal regulations and rules of industrial safety "Regulations on application of work permits in case of performance of works of the increased danger on hazardous production facilities of the mining and metallurgical industry", approved by the order of Rostekhnadzor of January 18, 2012 No. 44 (registration No. 23411 is registered by the Ministry of Justice of the Russian Federation on March 6, 2012; Bulletin of regulations of federal executive bodies, 2012, No. 21).

The list of works of the increased danger, procedure for execution of work permits, the list of the specialists having the right to issue and approve work permits are established by the organizational and administrative document of the isolated structural division.

Works of the increased danger in the oil mine are performed according to the instructions establishing requirements to the organization and safe conducting these works, approved by the technical lead of the isolated structural division.

10. Excavations, sites, buildings, constructions, installations, technical devices in the oil mine are accepted in operation according to the procedure, established by the organizational and administrative document of the isolated structural division.

Operation of the defective mining equipment and defective technical devices in the oil mine is forbidden.

11. In the isolated structural division accounting of the personnel which are in the oil mine, accounting of persons which did not leave the oil mine, and measure for their detection will be organized.

12. The procedure for visit of excavations of the oil mine by persons who are not working in the organization operating OPO shall be organized according to the administrative document of the isolated structural division.

Persons which are not working in the organization operating OPO before visit of excavations of the oil mine study requirements of industrial safety which need to be observed in case of visit of excavations of the oil mine, and are trained to use by the individual protection equipment issued to them (further - SIZ).

The faces which are not working in the organization operating OPO except for of workers of the third parties performing works in excavations of the oil mine in case of visit of excavations of the oil mine are followed by employees of the organization operating OPO.

13. Excavations of the oil mine and ventilating constructions which are in them, technical devices, pipelines are assigned by the organizational and administrative document of the isolated structural division to structural divisions of the isolated structural division (further - structural division).

14. The condition of excavations of the oil mine is every day controlled by specialists of structural division.

Places of conducting works in excavations of the oil mine are controlled:

every day - the head or the deputy manager of structural division to whom these excavations are assigned;

every shift - specialists of structural division to which these excavations are assigned.

15. The organizational and administrative document of the isolated structural division determines excavations of the oil mine, the job specification on performance of works in which is issued to at least than two workers having length of service in at least 6 months, and one of which is appointed the senior.

The condition of these excavations before the direction of workers in them is checked by specialists of structural division to whom these excavations are assigned.

16. In case of identification of violations of requirements of industrial safety, safety of conducting mining operations, safety of conducting works on oil extraction these works stop and measures for elimination of the revealed violations are taken.

In cases when in excavations of the oil mine the revealed violations of requirements of industrial safety and (or) safety of conducting mining operations and (or) conducting works on oil extraction can lead to emergence of accident or create threat of life and to health of workers, workers leave these excavations in excavations in which there are no violations of safety requirements, and (or) on surface.

17. The procedure for finding of workers in excavations of the oil mine in non-working holidays is established by the organizational and administrative document of the isolated structural division.

In non-working changes for performance of works in deadlock excavations the job specification is issued to at least than two workers, at the same time length of service by profession of one of them shall be at least 6 months.

Conducting mining operations or works on oil extraction after their stop for the period of more than one change is resumed after check of condition of industrial safety by the head or specialist of the structural division conducting mining operations or works on oil extraction.

18. The technical devices providing airing and conditioning of excavations, water supply, water pumping, descent and raising of personnel, work of multipurpose security system (further - MFSB), stop for accomplishment of repair work according to the written permission of the technical lead of the isolated structural division.

19. The employees of the isolated structural division and contract organizations occupied at works in excavations of the oil mine are provided with the certified and operational SIZ, including SIZ of respiratory organs of the isolating type which are constantly assigned to them (further - self-rescuers), accumulator lamps of individual use (further - head lamps), gas analyzers and/or signaling devices of the combustible gases which are emitted in the oil mine (further - individual devices of control) and technical devices of determination of location, the emergency notification, search and detection.

The workers conducting works in deadlock excavations, in excavations where works on oil extraction are conducted, in excavations with outgoing ventilating streams use individual devices of control of condition of the miner atmosphere.

During the work of employee group in one place it is allowed to use group devices of control of condition of the miner atmosphere.

Group devices of control of workers are not fixed.

All persons performing mining operations or visiting excavations of oil mines shall be trained in instructions for use by self-rescuers and undergo in them training exercises according to the procedure, established by the organizational and administrative document of the isolated structural division.

20. Hot work in excavations and nadshakhtny buildings of oil mines is conducted according to requirements of Federal regulations and rules of industrial safety "The instruction for conducting hot work in excavations, nadshakhtny buildings of the mines and coal preparation factories" approved by the order of Rostekhnadzor of October 14, 2014 No. 463 (registration No. 35921 is registered by the Ministry of Justice of the Russian Federation on February 9, 2015; the official Internet portal of legal information www.pravo.gov.ru, 2015, No. 0001201502100014) (further - the Instruction for conducting hot work).

III. General requirements to documentation

21. Development of oil fields by underground method is performed on the basis of the engineering design of development of the mineral deposits (further - the project documentation) prepared, approved and approved according to Regulations on preparation, approval and approval of engineering designs of development of the mineral deposits and other project documentation on performance of works connected with use of subsoil plots by the types of minerals and types of use of natural resources approved by the order of the Government of the Russian Federation of March 3, 2010 No. 118 (The Russian Federation Code, 2010, No. 10, Art. 1100; 2014, No. 14, Art. 1648; 2015, No. 2, Art. 480; No. 44, Art. 6128; 2016, No. 8, the Art. 1134), and also according to the Requirements to structure and execution of the project documentation on development of fields of hydrocarbonic raw materials approved by the order of the Ministry of Natural Resources and Environmental Protection of the Russian Federation of July 8, 2010 No. 254 (registration No. 18468 is registered by the Ministry of Justice of the Russian Federation on September 17, 2010; Bulletin of regulations of federal executive bodies, 2010, No. 41).

On the basis of the project documentation approved in accordance with the established procedure the organization operating OPO will organize preparation, approval and approval of plans and schemes of development of mining operations according to Rules of preparation, consideration and approval of plans and schemes of development of mining operations by types of the minerals approved by the order of the Government of the Russian Federation of August 6, 2015 No. 814 (The Russian Federation Code, 2015, No. 33, the Art. 4844).

22. Documentation on conducting the mining operations connected with dredging of rocks from earth subsoil, driving, carrying out and fixture of excavations (further - documentation on conducting mining operations) and documentation on conducting works on construction, operation, repair, reconstruction of the delivery wells extracting oil wells, to collection, transport, preparation of the heat carrier and oil (further - documentation on conducting works on oil extraction) affirms the technical lead of the isolated structural division.

Documentation on conducting mining operations and documentation on conducting works on oil extraction are developed for each mining block prior to the beginning of its construction.

The procedure for development and contents of documentation on conducting mining operations and documentation on conducting works on oil extraction is determined by the technical lead of the organization operating OPO.

The Sections which are part of documentation on conducting mining operations and documentation on conducting works on oil extraction for the mining block in the isolated structural division are allowed to be developed in the form of separate documentation on each type of mining operations and works on oil extraction.

23. Documentation on conducting mining operations and documentation on conducting works on oil extraction consists of text and graphical parts.

Text part of documentation contains data on the mining block, the description of the made technology, technical and other solutions, explanations, references to the regulating and (or) technical documents used by its preparation, the calculations and results of calculations proving the made decisions.

In graphical part of documentation the made technology, technical and other solutions which are carried out in the form of drawings, schemes, plans and other documents in graphical form are displayed.

24. Documentation on conducting mining operations joins measures for ensuring industrial safety and safe conducting mining operations.

25. Documentation on conducting works on oil extraction joins measures for ensuring industrial safety and safe operation for oil extraction.

26. Documentation on conducting mining operations and documentation on conducting works on oil extraction shall correspond to the project documentation, and also mining-and-geological and mining conditions.

In case of change of mining-and-geological and mining conditions the additions considering the happened changes of mining-and-geological and mining conditions are made to documentation on conducting mining operations and to documentation on conducting works on oil extraction.

Documentation on conducting mining operations and documentation on conducting works on oil extraction after entering of amendments into it affirms the technical lead of the isolated structural division.

27. Documentation on conducting mining operations and in documentation on conducting works on oil extraction joins the technical documentation which is in detail describing engineering procedures, methods and methods of conducting mining operations, works on oil extraction, technical means, technology standard rates, conditions and detailed procedure of engineering procedures (further - production schedules).

Production schedules on engineering procedures when conducting mining operations are developed according to the Federal regulations and rules of industrial safety of "The safety rule in case of conducting mining operations and conversion of solid minerals" approved by the order of Rostekhnadzor of December 11, 2013 No. 599 (registration No. 32935 is registered by the Ministry of Justice of the Russian Federation on July 2, 2014; The Bulletin of regulations of federal executive bodies, 2014, No. 38) (further - Safety rules when conducting mining operations).

Production schedules on engineering procedures of oil extraction by underground method are developed according to the Federal regulations and rules of industrial safety of "The safety rule for the oil and gas industry" approved by the order of Rostekhnadzor of March 12, 2013 No. 101 (registration No. 28222 is registered by the Ministry of Justice of the Russian Federation on April 19, 2013; The bulletin of regulations of federal executive bodies, 2013, No. 24) with the changes made by the order of Federal Service for Environmental, Technological and Nuclear Supervision of January 12, 2015 No. 1 "About modification of the Federal regulations and rules of industrial safety of "The safety rule for the oil and gas industry" approved by the order of Federal Service for Environmental, Technological and Nuclear Supervision of March 12, 2013 No. 101" (it is registered by the Ministry of Justice of the Russian Federation on February 20, 2015, registration No. 36191, is published: the official Internet portal of legal information www.pravo.gov.ru, 2015, No. 0001201502270008) (further - Safety rules for the oil and gas industry).

28. The workers conducting mining operations study under list documentation on conducting mining operations according to which they conduct these works, and with the production schedules containing in it.

29. The workers conducting works on oil extraction study under list documentation on conducting works on oil extraction according to which they conduct these works, and with the production schedules containing in it.

30. Documentation on conducting mining operations, documentation on conducting works on oil extraction, with the production schedules containing in them shall be in the structural divisions performing these works and at the technical lead of the isolated structural division.

IV. Antiemergency protection

31. Antiemergency protection provides the prevention of accidents and incidents in excavations of the oil mine with realization of package of measures and the means determined by the project documentation, and in case of their origin - maintaining wrecking.

32. The actions plan on localization and mitigation of consequences of accidents on OPO (oil mine) (further - the actions plan) is developed by the organization, the operating OPO, or its isolated structural division according to the Regulations on plan development of actions for localization and mitigation of consequences of accidents on hazardous production facilities approved by the order of the Government of the Russian Federation of August 26, 2013 No. 730 (The Russian Federation Code, 2013, No. 35, the Art. 4516).

33. The actions plan shall consist of general and special Sections. In special Sections of the actions plan shall contain procedure for conducting works on localization and mitigation of consequences of accidents in excavations of the oil mine, mode of operation of the people overtaken by accident, procedure for conducting mine-rescue works on rescuing of people and localization and mitigation of consequences of accidents in excavations of the oil mine.

Special Sections of the actions plan are drawn up in the form of the text, tables and graphical material: drawings, schemes and plans.

34. Actions plans affirm the head of the organization operating OPO or the head of its isolated structural division.

Actions plans are approved by heads of professional rescue services or PASF with whom the service agreement OPO (the oil mine) is signed.

35. Before preparation and approval of the actions plan the organizational and administrative document of the organization, the operating OPO, or its isolated structural division creates the commissions for conducting checks of readiness of antiemergency protection of the oil mine on the following questions:

security of the oil mine with emergency exits, their suitability for movement of people and pass of staff of PASF in respirators for evacuation of victims;

compliance of time of exit of people to fresh current of air to the term of protective action of the used self-rescuers, readiness of workers and specialists to their use, possibility of accomplishment of tasks of PASF during protective action of respirator;

ventilating devices and constructions of the oil mine, possibility of accomplishment of the planned ventilating modes;

the reverse, switching and pressurizing devices of fans of the main airing (further - VGP);

determination of time of zagazirovaniye of deadlock developments in case of stop of fans of local airing (further - VMP);

stability of the ventilating modes in excavations and reliability of the taken measures for the prevention of spontaneous capsizing of ventilating streams in case of the fire;

means of communication and notifications about accident, search of the people overtaken by accident;

freelance rescue units;

fire protection of the oil mine.

Results of checks are drawn up by the statements which are drawn up in the form established by the organizational and administrative document of the isolated structural division.

36. At least in 10 days prior to commissioning of the actions plan in the isolated structural division studying of its special Section by the workers occupied at works in excavations of the oil mine, according to the Federal regulations and rules of industrial safety "The instruction for carrying out educational alarms and doctrines according to the plan of accident elimination" approved by the order of Rostekhnadzor of February 14, 2013 No. 59 will be organized (registration No. 28028 is registered by the Ministry of Justice of the Russian Federation on April 8, 2013; Bulletin of regulations of federal executive bodies, 2013, No. 20).

37. In excavations of the oil mine, nadshakhtny buildings and constructions the complex of systems and means providing the organization and implementation of safety of conducting mining operations and works on oil extraction is equipped.

In excavations of oil mines the systems of antiemergency protection, fire protection and aero gas protection providing stop of technical devices in case of exceeding of the parameters controlled by these systems, the admissible values established by these rules and production schedules are equipped.

Systems and means of this complex unite in MFSB.

38. The technical structure of MFSB is determined by the project documentation taking into account the analysis of dangers and risk assessment of accidents on OPO and provides:

aerological safety: control and management system for stationary ventilatory installations, fans of local airing; system of aero gas control (further - AGK);

fire protection: system of detection of early signs of the exogenous fires and localization of the exogenous fires; control and management system for fire water supply, placement of emergency firefighting equipment, fire doors, arches;

communication, notification and determination of location of personnel: system of determination of location of personnel in excavations of the oil mine; system of search and detection of the people overtaken by accident; system of operative, loud-speaking and emergency underground communication and emergency notification; two independent communication channels with the division of PASF servicing the oil mine.

39. MFSB shall conform to requirements in the field of industrial safety and technical regulation, ensuring unity of measuring instruments and standards of explosion-proof electric equipment, automated control systems, information technologies, measuring systems and the gas-analytical equipment.

40. The network of the operating excavations of the oil mine shall provide evacuation of the personnel which are in them in case of accident from the most remote excavations on surface and (or) in excavations with fresh current of air along the routes provided by the special Section of the actions plan during protective action of the self-rescuers who are available for it.

41. For rescuing of personnel in underground excavations of the oil mine switching Items in self-rescuers are equipped (further - PPS). Placement of PPS in excavations of the oil mine is determined by the project documentation approved by the technical lead of the organization taking into account providing additional possibility of self-rescuing of the personnel included in self-rescuers on routes of its following from place of employment on surface.

42. In places of the excavations of the oil mine determined by the actions plan notices with names of excavations, movement direction signs to PPS and to emergency exits on surface, signs of safety and signaling devices are established. Notices with names of excavations and direction signs of movement are lit or carried out with use of light-reflective materials and established on all interfaces of excavations.

43. Picking of PPS means of individual and collective protection, means of first-aid treatment, and also the organization of control of their condition, procedure for their replacement and servicing are determined by the project documentation which is developed taking into account the maximum number of the workers leaving to PPS in case of accident along the routes provided by the actions plan.

44. Arrangement of PPS in excavations of the oil mine is specified in graphical material of the special Section of the actions plan.

V. Requirements to workers

45. With employees of the organization operating OPO with the employees of contract organizations occupied at works in excavations of the oil mine are instructed on safe operation and acquaintance with general and special Sections of the actions plan according to the program approved by the technical lead of the isolated structural division.

46. In case of change of kind of work, and also after the happened accidents, accidents or after assumption of gross violations of requirements of safe operation with the workers occupied at works in excavations of the oil mine unplanned instructing in safe operation is carried out.

47. The workers occupied at works in excavations of the oil mine which accomplishment provides combination of professions are trained to safe acceptances of work and instructing in all types of the combined works.

48. Each worker occupied at works in excavations of the oil mine prior to accomplishment of mining operations or works on oil extraction makes sure of safe condition of the workplace, checks availability and operability of safety devices, protective equipment, the tool, the devices which are required for work.

49. The workers occupied at works in excavations of the oil mine shall:

at least once in 6 months to undergo repeated instructing in safe operation and to study the special Section of the actions plan;

be able to use self-rescuers;

at least once in 12 months to undergo examination of instructions by profession;

observe requirements of documentation on conducting mining operations, documentation on conducting works on oil extraction, production schedules, the requirement of industrial safety;

know purpose of the notices established in excavations of the oil mine, signs of safety and signaling devices.

know signals of the emergency notification, rule of conduct in case of accidents and incidents, the actions plan, emergency exits on surface, locations of PPS, other survival equipment, fire protection and to be able to use them.

50. It is forbidden to the workers occupied at works in excavations of the oil mine:

perform the works which are not provided by the job specification;

be in the excavations which are not connected with performance of works according to the job specification;

be in excavations without the certified and operational SIZ assigned to them, self-rescuers, head lamps, gas analyzers and (or) signaling devices of the combustible gases and technical devices of determination of location, the emergency notification, search and detection which are emitted in the oil mine;

have in case of itself alcoholic beverages, narcotic substances, smoking accessories; smoke in mine excavations, at the mouths coming to surface of excavations in nadshakhtny buildings and constructions and at distance less than 30 meters from them;

be in condition of alcoholic, drug or other toxic intoxication.

VI. Conducting mining operations

51. Conducting mining operations without approved as the head of the isolated structural division of documentation on conducting mining operations is forbidden.

52. In case of development of oil fields the underground method performs works on detection of tendency of breeds to gazo-and to the geodynamic phenomena.

On oil fields with the breeds inclined to the dynamic phenomena, in case of development of the project documentation geodynamic division into districts is carried out.

53. Mining operations are performed at least, than two workers, and length of service by profession of one of them shall be at least 6 months.

54. Conducting mining operations by employees of structural division of the organization, contract organization in the excavations assigned to other structural division is approved with the head of this structural division.

VII. The device of exits from excavations

55. At least two not conspirational exits are provided in the operating excavations of the oil mine.

56. From deadlock developments and from venues of repair work in the operating excavations exit in the next excavations is provided.

57. In each operating oil mine there shall be at least two exits to surface equipped for movement and (or) transportation of people.

Each horizon of the oil mine shall have at least two exits to the above-located and (or) below-located horizon or surface, the people equipped for movement (transportation).

58. In the excavations equipped for movement (transportation) of people on surface and (or) from the horizon on the horizon the different direction of movement of ventilating streams is provided.

59. Two and more parallel developments on which the ventilating stream in case of emergency operation of airing of the oil mine moves in one direction are one emergency exit.

60. The condition of the excavations serving as emergency exits at least once a month is checked by persons designated by the organizational and administrative document of the isolated structural division. Results of check are fixed in the magazine of record of results of surveys fix also conditions of excavations, drawn up in the form established by the organizational and administrative document of the isolated structural division and in the magazine of record of results of surveys of condition of mine trunks which is drawn up in the form established by the organizational and administrative document of the isolated structural division.

61. The vertical and inclined excavations which are exits to surface are equipped with the technical devices providing transportation of people and (or) ladder departments.

62. In case of the central arrangement of two and more vertical and (or) inclined excavations passed to one horizon:

the ladder department in one of these developments can be absent provided that in it two technical devices providing transportation of people with independent electric power supply are established;

in trunks more than 500 m in depth the ladder department is not equipped provided that trunks are equipped with two technical devices providing transportation of people with independent electric power supply;

in trunks up to 70 m in depth in one of them the technical device providing transportation of people is not established provided that both trunks have ladder departments.

63. The excavations coming to surface at which mouth permanent presence of workers is not provided are equipped with the devices providing exit from the oil mine and interfering access to them from surface, means of communication and the alarm system removed to the mountain dispatcher of the oil mine.

64. The inclined excavations intended for movement of people are equipped in case of tilt angles:

from 7 to 10 ° - ladders;

from 11 to 25 ° - ladders with handrail;

from 26 to 30 ° - staircases with steps and handrail;

from 31 to 45 ° - ladders with horizontal steps and handrail;

more than 45 ° - ladder departments.

65. Ladders in ladder departments are established at an angle no more than 80 °. Width of ladders shall be at least 0,4 of m, and distance between steps - no more 0,4 of m.

The distance between krepyyu excavation and ladder at its basis shall be at least 0,6 of m.

In ladder departments no more than through 8 m horizontal regiments are established. Ladders shall act 1 m at least over horizontal regiments.

In horizontal regiments for easy access manholes width of at least 0,6 of m and height of at least 0,7 of m are arranged.

Manholes over the first upper ladder are closed by lyada.

Warning!!!

This is not a full text of document! Document shown in Demo mode!

If you have active License, please Login, or get License for Full Access.

With Full access you can get: full text of document, original text of document in Russian, attachments (if exist) and see History and Statistics of your work.

Get License for Full Access Now

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.

Search engine created by SojuzPravoInform LLC. UI/UX design by Intelliants.