Document from CIS Legislation database © 2003-2021 SojuzPravoInform LLC

The document ceased to be valid since  July 1, 2019 according to Item 3 of the Order of the Ministry of Fuel and Energy of Ukraine of  October 26, 2018 No. 539

It is registered

Ministry of Justice of Ukraine

September 7, 2016

No. 1224/29354

ORDER OF THE MINISTRY OF FUEL AND ENERGY OF UKRAINE

of August 16, 2016 No. 521

About approval of the Procedure for creation of year and monthly balance estimations of electrical energy of the integrated power system of Ukraine

According to subitems 2, the 5th item 4 of the Provision about the Ministry of Fuel and Energy of Ukraine approved by the Presidential decree of Ukraine of April 6, 2011 No. 382, and for the purpose of ensuring operational safety of functioning of the integrated power system of Ukraine with PRIKAZYVAYU:

1. Approve the Procedure for creation of year and monthly balance estimations of electrical energy of the integrated power system of Ukraine which is applied.

2. To heads of the power generation companies of thermal power plants:

To provide 1) on approval in the Ministry of Fuel and Energy of Ukraine the annual schedule developed according to the balance estimation of the electric power of the integrated power system of Ukraine (monthly) accumulatings of coal in warehouses of thermal power plants till December 20 of the year preceding settlement;

2) annually no later than August 20 to develop and provide on approval to the Ministry of Fuel and Energy of Ukraine of graphics of reconstruction of power units of thermal power plants for settlement year and years (three-year schedules) two subsequent to it;

3) to provide accomplishment of the schedules of accumulating of coal approved by the Department of Energy of the coal industry of Ukraine in warehouses of thermal power plants for production of electrical energy according to the balance estimation of the electric power of the integrated power system of Ukraine.

3. To department of electrical power complex of the Ministry of Fuel and Energy of Ukraine (Buslavets A. A.) provide:

submission of this order on state registration in the Ministry of Justice of Ukraine in accordance with the established procedure;

promulgation of this order on the official website of the Ministry of Fuel and Energy of Ukraine.

4. This order becomes effective from the date of its official publication.

5. To impose control over the implementation of this order on the deputy minister Svetelik A. D.

Minister

I. Nasalik

Approved by the Order of the Ministry of Fuel and Energy of Ukraine of August 16, 2016, No. 521

Procedure for creation of year and monthly balance estimations of electrical energy of the integrated power system of Ukraine

I. General provisions

1. This Procedure determines the basic organizational provisions and requirements for creation of balance year and monthly balances of electrical energy of the integrated power system of Ukraine (OES of Ukraine).

2. Requirements of this Procedure are obligatory for subjects of power industry, irrespective of the patterns of ownership working as a part of OES of Ukraine.

3. In this Procedure terms are used in such values:

basic capacity - the set, almost permanent capacity during the established time interval;

the block station - power plant which belongs to the energy consumer works in OES of Ukraine and submits to its centralized dispatching management which electrical energy is used for covering of own consumption, and excesses of the made electric power are on sale to the power supplier;

generating (turbine) working hours of pumped storage power plant transformation of energy of water flow in electric (water from the upper reservoir is dumped in lower via aggregates of pumped storage power plant, and the developed electric power is released in power supply system);

method of injection of hydroelectric power station in the consumption map of the electric power - calculation of daily hourly loading of hydroelectric power station by determination of capacity of hydroelectric power station on minimum or maximum of consumption of electrical energy;

minimum admissible structure of the equipment - blocks which minimum admissible number with minimum demand shall be in work depending on the average daily temperature of outside air according to the forecast of weather conditions for ensuring reliable work of the station;

motor (pumping) working hours of pumped storage power plant transformation of the electrical energy received from other power plants to potential energy of water (water from the lower reservoir is repumped by hydroaggregates of pumped storage power plant in the upper reservoir);

not balance of electrical energy (capacity) - difference between production volumes and import of electrical energy (capacity) and consumption and export of electrical energy (capacity);

the operator of external overflows - subject of managing which sells the imported electrical energy in the wholesale market of electrical energy or performs export of the electrical energy acquired in the wholesale market on the terms of the bilateral agreement;

the regulating capacity - difference between maximum and minimum possible loading of the energy equipment;

the repair platform - the installed capacity of the power unit increased by repair duration;

combined heat and power plant - the thermal power plant intended for the combined production of electrical and heat energy which core activity is providing consumers with heat energy.

Other terms are used in the values given in the Laws of Ukraine "About alternative energy sources", "About bases of functioning of the market of electrical energy of Ukraine", "About power industry", "About the combined production of heat and electrical energy (cogeneration) and use of waste potential".

4. In this Procedure the following reducings are used:

The NPP - nuclear power plant;

VES - wind power plant;

Pumped storage power plant - hydroheat-sink power plant;

Hydroelectric power station - hydraulic power plant;

ES - power supply system;

ORE - the wholesale market of the electric power;

SES - solar power plant;

Thermal power plant - thermal power plant;

Combined heat and power plant - thermal electromain line.

II. Forming of year and monthly balance estimations of electrical energy of OES of Ukraine

1. The procedure for creation of year balance estimations of electrical energy of OES of Ukraine includes the following stages:

The I stage - till August 01 of the year previous settlement, electric power producers, power suppliers and operators of external overflows (further participants of forming of the balance estimation) provide to the state company "The national energy company "Ukrenergo" (further - GP "NEK "Ukrenergo") offers the next settlement year:

power suppliers - forecast monthly amounts of power consumption and minimum, maximum of loading of the working day of every month, monthly production volumes of electrical energy producers which are not members of ORE or are members of ORE, but perform electrical supplies out of ORE and are placed in the territory of licensed activity of the supplier, in form according to appendix 1 to this Procedure;

the state company "The national atomic power generation company "Energoatom" (further - GP "NAEK "Energoatom") - the schedule of scheduled preventive maintenance for settlement year and on the first quarter of the year following for settlement which is as close as possible to optimum, according to appendix 2 to this Procedure taking into account the operating restrictions of issue of capacity on networks (provided to GP "by NEK "Ukrenergo" in case of approval of the four-year schedule of planned repairs of the NPP) and repairs of own autotransformers, and also monthly production volume and supply of electricity;

Hydroelectric power station and GP "NAEK "Energoatom" - schedules of conclusion in planned repairs of the equipment of hydroelectric power station and pumped storage power plant, monthly production volumes of the electric power for hydroelectric power station in case of 50% of security of inflow of water, electric power consumption amounts in the motor mode and production of electricity in the generating mode for each pumped storage power plant;

the power generation companies of thermal power plants - schedules of reconstruction of power units (taking into account the approved three-year schedule);

combined heat and power plants and cogeneration installations which release the electric power in ORE, - monthly production volumes and leaves of electrical energy in ORE necessary for providing the schedule of thermal load according to the signed agreements of heat supply;

electric power producers from alternative energy sources - monthly production volumes and supply of electricity. At the same time electric power producers of sunlight (SES) whose installed capacity exceeds 20 MW in addition provide monthly standard schedules of generation in form according to appendix 3 to this Procedure;

operators of external overflows - monthly export volumes of electrical energy in each direction, and also capacity in hour of the minimum and maximum demand of the working day of OES of Ukraine in form according to appendix 4 to this Procedure.

Warning!!!

This is not a full text of document! Document shown in Demo mode!

If you have active License, please Login, or get License for Full Access.

With Full access you can get: full text of document, original text of document in Russian, attachments (if exist) and see History and Statistics of your work.

Get License for Full Access Now

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.

Search engine created by SojuzPravoInform LLC. UI/UX design by Intelliants.