Document from CIS Legislation database © 2003-2024 SojuzPravoInform LLC

ORDER OF THE MINISTER OF ENERGY OF THE REPUBLIC OF KAZAKHSTAN

of November 26, 2015 No. 671

About approval of Rules of determination of the sizes of the parcels of land for placement of support of air-lines of electricity transmission

According to subitem 30-2) of article 5 of the Law of the Republic of Kazakhstan of July 9, 2004 "About power industry" I ORDER:

1. Approve the enclosed Rules of determination of the sizes of the parcels of land for placement of support of air-lines of electricity transmission.

2. To provide to department of power industry of the Department of Energy of the Republic of Kazakhstan in the procedure established by the legislation:

1) state registration of this order in the Ministry of Justice of the Republic of Kazakhstan;

2) within ten calendar days after state registration of this order in the Ministry of Justice of the Republic of Kazakhstan the direction it the copy on official publication in periodic printing editions and information system of law of Ad_let, and also in the Republican center of legal information for entering into reference control bank of regulatory legal acts of the Republic of Kazakhstan;

3) placement of this order on official Internet resource of the Department of Energy of the Republic of Kazakhstan and the intranet portal of state bodies;

4) within ten working days after state registration of this order in the Ministry of Justice of the Republic of Kazakhstan submission to Department of legal service of the Department of Energy of the Republic of Kazakhstan of data on execution of the actions provided by subitems 2) and 3) of this Item.

3. To impose control of execution of this order on the supervising vice-Minister of Energy of the Republic of Kazakhstan.

4. This order becomes effective after ten calendar days after day of its first official publication.

Minister of Energy of the Republic of Kazakhstan

B. School student

It is approved

Acting minister of agricultural industry of the Republic of Kazakhstan

November 26, 2015

 

______________ S. Omarov

It is approved

Minister of national economy of the Republic of Kazakhstan

November 30, 2015

 

______________ E.Dosayev

Approved by the Order of the Minister of Energy of the Republic of Kazakhstan of November 26, 2015 No. 671

Rules of determination of the sizes of the parcels of land for placement of support of air-lines of electricity transmission

1. General provisions

1. Rules of determination of the sizes of the parcels of land for placement of support of air-lines of electricity transmission (further - Rules) are developed according to subitem 30-2) of article 5 of the Law of the Republic of Kazakhstan "About power industry" and determine procedure for determination of the sizes of the parcels of land for placement of support of air-lines of electricity transmission.

2. Procedure for determination of the sizes of the parcels of land for placement of support of air-lines of electricity transmission

2. The minimum size of the parcel of land for placement of support of air-line of electricity transmission up to 10 kilovolts (further - kV) is inclusive determined as the area of the contour equal to the cross section of support at the level of the Earth's surface.

3. The minimum size of the parcel of land for placement of support of air-line of electricity transmission of 10 kV and is determined above as:

1) the area of the contour remote on 1 meter (further - m) from support projection contour to the Earth's surface (for support on delays - including delays), - for the parcels of land adjoining on the parcels of land of other categories of lands except the parcels of land intended for installation of support with crossbars depth of laying of no more 0,8 of the m adjoining on the parcels of land of agricultural purpose;

2) the area of the contour remote on m 1,5 from support projection contour to the Earth's surface (for support on delays - including delays), - for the parcels of land intended for placement of support with crossbars depth of laying of no more 0,8 of the m adjoining on the parcels of land of agricultural purpose.

4. The minimum sizes of the parcels of land for placement of support of air-line of electricity transmission of 220 kV and are allowed to be determined above in which design are used fixed in the earth of rack (delay) as:

1) the area of the contour remote on 1 m from external contours of each rack (delay) at the level of the Earth's surface - for the parcels of land adjoining on the parcels of land of all categories of lands (except lands of agricultural purpose);

2) the area of contour, m, remote on 1,, from external contours of each rack (delay) at the level of the Earth's surface - for the parcels of land adjoining on the parcels of land of agricultural purpose.

5. The specific sizes of the parcels of land for placement of support of air-lines of electricity transmission are determined proceeding from need of fixing of support for the earth, the sizes and types of support bearing capabilities of soil and need of engineering arrangement of the platform of support for the purpose of ensuring its stability and safe operation.

6. The sizes of the parcels of land (parts of the parcels of land) which are used during engineering researches when designing air-lines of electricity transmission are determined by the project documentation on carrying out the specified works.

7. The parcels of land (part of the parcels of land) used in the period of construction, reconstruction, modernization and repair of air-lines of electricity transmission represent earth strip on all length of air-line of electricity transmission which width exceeds distance between axes of extreme phases on 2 m from each party.

The parcels of land (part of the parcels of land) used in case of production of the specified works concerning electricity transmission air-lines by tension 220, of 500 and 1150 kV with horizontal arrangement of phases represent separate strips of the earth 5 m wide for each phase.

The specific sizes of the parcels of land (parts of the parcels of land) for implementation of the specified works are determined according to the project documentation on construction of air-lines of electricity transmission taking into account the accepted production technology of installation works, conditions and methods of construction.

 

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.

Search engine created by SoyuzPravoInform LLC.