of March 11, 2014 No. 71
About approval of "Rules of designing of heat supply, natural and artificial lighting, ventilation and acoustics of construction objects"
For the purpose of ensuring execution of subitem 1.6.12. The presidential decree of the Azerbaijan Republic of September 4, 2012 No. 695 "About application of the Law of the Azerbaijan Republic "About approval of the Town-planning and construction code of the Azerbaijan Republic, its introduction in force and the legal regulation connected with it" of June 29, 2012 No. 392-IVQ", the Cabinet of Ministers of the Azerbaijan Republic decides:
Approve "Rules of designing of heat supply, natural and artificial lighting, ventilation and acoustics of construction objects" (are applied).
Prime Minister of the Azerbaijan Republic
Artur Rasi-Zade
Approved by the Resolution of the Cabinet of Ministers of the Azerbaijan Republic of March 11, 2014 No. 71
1.1. These rules are constituted for the purpose of ensuring execution of subitem 1.6.12. The presidential decree of the Azerbaijan Republic of September 4, 2012 No. 695 "About application of the Law of the Azerbaijan Republic "About approval of the Town-planning and construction code of the Azerbaijan Republic, its introduction in force and the legal regulation connected with it" of June 29, 2012 No. 392-IVQ" is also determined by rules of designing of heat supply, natural and artificial lighting, ventilation and acoustics of construction objects.
2.1. Buildings or constructions shall be designed and built so that people during accommodation in buildings and stays on constructions were not exposed to dangerous radiation, physical, biological, chemical and other effects, and safe conditions on the following indicators were provided:
2.1.1. heat supply of residential, public and factory buildings;
2.1.2. ventilation of residential, public and factory buildings;
2.1.3. natural and artificial lighting of rooms;
2.1.4. noise isolation of rooms of residential and public buildings, working areas of factory buildings and constructions.
3.1. Requirements to heat supply of construction objects:
3.1.1. in project documents of buildings and constructions characteristics of limitor designs shall be determined and the constructive decisions providing compliance of settlement indicators of stated below heattechnical characteristics with required indicators for the purpose of creation of effective toilet facilities indoors shall be made:
3.1.1.1. resistance of limitor building constructions of buildings and constructions to heat transfer;
3.1.1.2. difference between temperature of internal part of limitor building constructions and air temperature in the building during the heating period;
3.1.1.3. resistance of limitor building constructions to heat in hot season and stability of rooms of buildings and constructions to heat in cold season;
3.1.1.4. resistance of limitor building constructions of paroprovodimost;
3.1.1.5. resistance of limitor building constructions of airconductivity;
3.1.1.6. indicators of heatcomprehensibility of floor;
3.1.2. in project documents of buildings or constructions requirements for prevention of excessive moistening of limitor building constructions and accumulating of water shall be provided in their surface, and to ensuring their longevity;
3.1.3. requirements to heating services, ventilation and conditioning, and to the modes of their work in project documents shall provide compliance with the indicators of stated below parameters of microclimate of rooms required for hot, cold and intermediate seasons in the accepted settlement indicators of characteristics of heat engineering of limitor designs:
3.1.3.1. temperature in buildings or constructions;
3.1.3.2. final temperature;
3.1.3.3. air motion speed;
3.1.3.4. relative air humidity;
3.1.4. settlement indicators are determined taking into account purpose of buildings and constructions, accommodation and activities;
3.1.5. in technical solutions of heating services, ventilation and conditioning the possibility of autonomous regulation of microclimatic parameters of rooms is provided;
3.1.6. technical solutions for ensuring thermal and hydraulic stability of heating systems in case of change of conditions of internal and external upkeep of buildings or constructions for year are provided in the project documentation of buildings and constructions.
3.2. Requirements to ventilating providing construction objects:
3.2.1. in project documents it shall be provided buildings or constructions by vent systems. In project documents it can be provided buildings or constructions by conditioning system. The ventilation system and conditioning not allow excesses of admissible limit of fortress in the air given to rooms or working areas of production sites;
3.2.2. in project documents of buildings or constructions in which rooms finding of people is provided actions for stated below shall be provided:
3.2.2.1. restriction of hit to rooms of dust, humidity, hazardous substances and bad smell from common air;
3.2.2.2. ensuring sufficient airing for the purpose of timely elimination of hazardous substances from air and content of the chemical composition of air in acceptable ratio for human activity;
3.2.2.3. prevention of hit to rooms where people, hazardous substances with bad smell from pipelines of systems and constructions of the sewerage, heating, ventilation, conditioning, from process pipelines, and also exhaust gases from internal car parks reside.
3.3. Requirements to providing construction objects with natural and artificial lighting:
3.3.1. buildings and constructions shall be supplied natural or mounted, including artificial lighting of land floors where people including artificial lighting of underground floors for prevention of harm to health of the person reside;
3.3.2. in connection with conditions of carrying out engineering procedures, land floors of buildings and constructions where installation of natural lighting is excluded, shall be supplied with sufficient artificial lighting for prevention of harm to health of the person;
3.3.3. external lighting of buildings and constructions shall be provided in the project documentation if it is provided by the project order.
3.4. Requirements to noise isolation of rooms of residential and public buildings and working areas of factory buildings and constructions:
3.4.1. the actions provided for placement of buildings and constructions in the territory, project indicators of characteristics of building constructions, characteristics of the plumbing system in project documents, improvements of the adjacent territories shall preserve people from:
3.4.1.1. the noise created by external sources;
3.4.1.2. the noise which arose in other rooms of buildings and constructions;
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions. This section provides answers to questions set by users.