About approval of Rules of measurement and weighing of oil extracted by the subsoil user in the contract area

According to the subitem 10) article 18 of the Law of the Republic of Kazakhstan of June 24, 2010 "About subsoil and subsurface use" PRIKAZYVAYU:

1. Approve the enclosed Rules of measurement and weighing of oil extracted by the subsoil user in the contract area.

2. To provide to development department of the oil industry of the Department of Energy of the Republic of Kazakhstan in the procedure established by the legislation of the Republic of Kazakhstan:

1) state registration of this order in the Ministry of Justice of the Republic of Kazakhstan;

2) the direction on official publication of this order within ten calendar days after its state registration in the Ministry of Justice of the Republic of Kazakhstan in periodic printing editions and in information system of law of Ad_let;

3) placement of this order on official Internet resource of the Department of Energy of the Republic of Kazakhstan and on the intranet portal of state bodies;

4) within ten working days after state registration of this order in the Ministry of Justice of the Republic of Kazakhstan submission to Department of legal service of the Department of Energy of the Republic of Kazakhstan of data on execution of the actions provided by subitems 2) and 3) of this Item.

3. To impose control of execution of this order on the supervising Vice-Minister of Energy of the Republic of Kazakhstan.

4. This order becomes effective after ten calendar days after day of its first official publication.

Minister

B. School student

It is approved

Minister of investments and development of the Republic of Kazakhstan

March 31, 2015

 

A. Isekeshev

Approved by the Order of the Minister of Energy of the Republic of Kazakhstan of February 23, 2015 No. 133

Rules of measurement and weighing of oil extracted by the subsoil user in the contract area

1. General provisions

1. These rules of measurement and weighing of oil extracted by the subsoil user in the contract area (further - Rules) are developed according to the subitem 10) of article 18 of the Law of the Republic of Kazakhstan of June 24, 2010 "About subsoil and subsurface use".

2. Rules determine procedure for measurement and weighing of the mass of oil extracted by the subsoil user in the contract area.

3. In these rules the following basic concepts are used:

1) arbitral test - the control test used for the umpire analysis;

2) the measuring line control - the measuring line applied to control of metrological characteristics of working converters of expense (further - PR);

3) intercontrol interval - period between two next control acts, the variation of metrological characteristics of measuring instruments which is carried out for identification from the values determined when checking;

4) accounting transactions - the operations performed by the handing-over and accepting parties, the mass of oil consisting in determination for the subsequent calculations and also under arbitration;

5) the range of expense and viscosity of oil the worker - area of values of expenses and viscosity, in which normirovana their metrological characteristics of the used PR;

6) the measuring line working - the measuring line which is in work in case of the normal mode of operation of system of measurement of amount of oil (further - SIKN);

7) normal conditions - ambient temperature is 20 °C (293,15 °k), atmospheric pressure is 760 mm of mercury. (101325 N/m 2);

8) control of metrological characteristics - determination during the period between checkings of variation of values of metrological characteristics of measuring instruments from the valid values or values determined in case of the last checking, establishment of suitability of measuring instruments to further operation;

9) the mass of ballast of oil - the lump of water, chloride salts and mechanical impurity in oil;

10) weight gross oils - the oil lump including the mass of ballast;

11) oil net weight - weight difference gross oils and the mass of ballast;

12) oil quantity and quality measuring system - set of measuring instruments (PR, density converters (further - software), moisture content, salinity, viscosity, temperature, pressure, basis weight gages), processing devices, storage, indication and registration of results of the measurements, the processing and service equipment (pipelines, filters, pumps, sampler, the locking and regulating armature and another) intended for development of signals of measuring information in the form convenient for automatic and manual handling;

13) the automated workplace of the operator - the personal computer with the corresponding software complete with the monitor, the keyboard and the printer intended for display of symbolic circuit of SIKN, the current technology and high-quality parameters of oil measured and calculated by system of information processing, forming of reporting documents and their conclusion to seal;

14) the measuring line (further - IL) - the part of design of SIKN consisting of PR or the basis weight gage with the straight sections of pipelines equipped with measuring instruments of pressure and temperature, latches and filters;

15) the reserve scheme of accounting - the system applied to measurement of mass of oil in case of refusal of the main scheme - system of measurement of quantity and oil quality figures;

Warning!!!

This is not a full text of document! Document shown in Demo mode!

If you have active License, please Login, or get License for Full Access.

With Full access you can get: full text of document, original text of document in Russian, attachments (if exist) and see History and Statistics of your work.

Get License for Full Access Now

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.

Search engine created by SoyuzPravoInform LLC.