of February 16, 2015 No. 132
About introduction of amendments to some acts of the Government of the Russian Federation concerning approval of investing programs of subjects of power industry and control of their realization
The government of the Russian Federation decides:
1. Approve the enclosed changes which are made to acts of the Government of the Russian Federation concerning approval of investing programs of subjects of power industry and control of their realization.
2. To the Ministry of Energy of the Russian Federation in 6-month time to approve:
methodical instructions for calculation of quantitative indices of investing programs of the network organizations;
the enlarged standard rates of the price of prototype technology solutions of capital construction of power generation facilities.
3. To the Ministry of Energy of the Russian Federation till December 31, 2015 to make changes to procedure for establishment of target indicators for the purposes of forming of investing programs of the network organizations, including the organizations for management of single national (all-Russian) power network providing establishment by the Ministry of Energy of the Russian Federation and (or) the executive bodies of subjects of the Russian Federation authorized on approval of investing programs of subjects of power industry (further - authorized bodies), target performance indicators of investing programs of the specified organizations.
4. Determine that:
since January 1, 2016 information on investing programs (projects of investing programs) of the subjects of power industry carried to number of subjects which investing programs affirm the Ministry of Energy of the Russian Federation and (or) authorized bodies and reports on their realization reveals with use of the official site of the federal state information system "Single Portal of the State and Municipal Services (Functions)" (further - information system) on the Internet (further - Internet network);
till January 1, 2022 information exchange of the Ministry of Energy of the Russian Federation with the interested executive bodies and the organizations participating in consideration of projects of investing programs of subjects of power industry according to the changes approved by this resolution (further - the interested bodies and the organizations) if the interested bodies and the organizations have no access to single system of interdepartmental electronic interaction and (or) technical capability to implementation of the specified information exchange with use of single system of interdepartmental electronic interaction, and (or) there are no process charts of interdepartmental information exchange in electronic form developed in accordance with the established procedure by provision of the state services in approval of the specified programs and (or) in case of control of their realization, it is performed by the direction (with use of electronic media of information or electronic means of communication) adequate notices, documents and data in the form of the electronic documents signed with use of the strengthened qualified digital signature.
5. To the Ministry of Energy of the Russian Federation together with the Minister of the Russian Federation Abyzovy M. A. to submit within 6-month term within the Government of the Russian Federation the draft of the act of the Government of the Russian Federation of approval of methodical recommendations about carrying out technological and price audit of investing programs (projects of investing programs) of the network organizations carried to number of subjects of power industry which investing programs affirm the Ministry of Energy of the Russian Federation and (or) authorized bodies, and reports on their realization.
6. To Federal Agency for State Property Management together with the Ministry of Economic Development of the Russian Federation and the Ministry of Energy of the Russian Federation in a month from the date of approval by the Government of the Russian Federation of methodical recommendations, stipulated in Item 5 these resolutions to prepare and introduce in the Government of the Russian Federation in accordance with the established procedure the directives to representatives of interests of the Russian Federation in the boards of directors of Russian Networks open joint stock company and "Federal grid company of the unified power system" open joint stock company providing carrying out technological and price project audit of investing programs and reports on realization of investing programs of these joint-stock companies and (or) their affiliated and dependent societies carried to number of subjects of power industry which investing programs affirm the Ministry of Energy of the Russian Federation, according to the specified methodical recommendations.
7. To federal executive bodies in 6-month time to accept the regulatory legal acts, necessary for implementation of this resolution, concerning approval of forms and requirements to formats of electronic documents.
8. To the authorized bodies and executive bodies of subjects of the Russian Federation authorized on control of realization of investing programs of subjects of power industry (further - the bodies exercising control), till September 1, 2015 to develop according to the requirements approved by the Ministry of Telecom and Mass Communications of the Russian Federation and to provide to the specified Ministry:
interactive forms of statements for provision by authorized bodies of the state services in approval of investing programs of subjects of power industry (taking into account the changes approved by this resolution);
the interactive forms providing possibility of the direction with subjects of power industry of the documents and data necessary for control of realization of investing programs of subjects of power industry (taking into account the changes approved by this resolution) the bodies exercising control.
9. To the Ministry of Energy of the Russian Federation till October 1, 2015 to develop according to the requirements approved by the Ministry of Telecom and Mass Communications of the Russian Federation and to provide technical descriptions to the Ministry of Telecom and Mass Communications of the Russian Federation:
interactive forms of statements for provision by the Ministry of Energy of the Russian Federation of the state services in approval of investing programs of subjects of power industry (taking into account the changes approved by this resolution);
the interactive forms providing possibility of the direction with subjects of power industry of the documents and data necessary for implementation by the Ministry of Energy of the Russian Federation of control of realization of investing programs of subjects of power industry (taking into account the changes approved by this resolution).
10. To provide to the Ministry of Telecom and Mass Communications of the Russian Federation with participation of the Ministry of Energy of the Russian Federation, the authorized bodies and bodies exercising control till January 1, 2016 placement in information system of the interactive forms provided by Items 8 and 9 of this resolution.
11. Determine that before placement in information system of interactive forms of the statements provided by Items 8 and 9 of this resolution, the direction of such statements in the Ministry of Energy of the Russian Federation and authorized bodies is performed according to the procedure, stipulated in Item 9 Rules of approval of investing programs of the subjects of power industry approved by the order of the Government of the Russian Federation of December 1, 2009 No. 977 "About investing programs of subjects of power industry".
12. To the Ministry of Telecom and Mass Communications of the Russian Federation in 6-month time:
approve together with the Ministry of Energy of the Russian Federation regulations of functioning of the Section of the official site of information system in Internet network in which placement of information on investing programs (projects of investing programs) of subjects of power industry, reports on their realization, results of consideration and public discussion of investing programs (projects of investing programs) of subjects of power industry is performed (taking into account the changes approved by this resolution);
provide together with the Ministry of Energy of the Russian Federation placement on the official site of information system in Internet network of the interactive forms providing possibility of the direction of offers to the investing programs (projects of investing programs) of subjects of power industry opened with use of this official site (taking into account the changes approved by this resolution);
provide technical capability:
placements on the official site of information system in Internet network of information on investing programs (projects of investing programs) of subjects of power industry, reports on their realization, results of consideration of projects of investing programs of subjects of power industry;
the directions with use of this official site of the documents and data necessary for implementation by the Ministry of Energy of the Russian Federation and the bodies exercising control, control of implementation of the specified programs;
carrying out with use of this official site of public discussion of investing programs (projects of investing programs) of subjects of power industry (taking into account the changes approved by this resolution).
13. Determine that before ensuring technical capability accomplishment with use of the official site of information system in Internet network of actions, the specified in paragraphs four - the seventh Item 12 of this resolution, is performed according to the procedure, stipulated in Item 9 Rules of approval of investing programs of subjects of power industry and Item 19 (1) Rules of control of realization of investing programs of the subjects of power industry approved by the order of the Government of the Russian Federation of December 1, 2009 No. 977 "About investing programs of subjects of power industry".
14. To the Ministry of Energy of the Russian Federation in coordination with the interested executive bodies and with participation of the interested organizations participating in provision of the state services in approval of investing programs of subjects of power industry according to the changes approved by this resolution till January 1, 2016 to develop process charts of interdepartmental information exchange in electronic form by provision of the specified state services.
15. To authorized bodies with participation of the interested executive bodies, and also with participation of the interested organizations participating in provision of the state services in approval of investing programs of subjects of power industry according to the changes approved by this resolution till January 1, 2016 to develop process charts of interdepartmental information exchange in electronic form by provision of the specified state services.
16. Determine that in 2015:
project information of investing programs (projects of the changes made to investing programs) of the network organizations carried to number of subjects of power industry which investing programs affirm the Ministry of Energy of the Russian Federation and (or) authorized bodies reveals the network organizations in the amount provided by subitems "a" - "to" Item 3 of Rules of approval of investing programs of subjects of power industry in which authorized capital the state, and the network organizations approved by the order of the Government of the Russian Federation of December 1, 2009 No. 977 "About investing programs of subjects of power industry" and for form of investing program of subjects of power industry in which authorized capital the state, and the network organizations, approved by the Ministry of Energy of the Russian Federation, according to the procedure and terms participates participates, the disclosures of information by subjects established by standards wholesale and the retail markets of electrical energy, approved by the order of the Government of the Russian Federation of January 21, 2004 No. 24 "About approval of standards of disclosure of information by subjects wholesale and the retail markets of electrical energy", it is also updated within 5 working days from the date of the direction by the network organization of investing program (modifed investing program) in the Ministry of Energy of the Russian Federation and (or) authorized body on approval according to the procedure, established by the Government of the Russian Federation;
the network organizations carried to number of subjects of power industry which investing programs affirm the Ministry of Energy of the Russian Federation for the purpose of carrying out public discussion accept the offers concerning the project information of investing programs (projects of the changes made to investing programs) opened by such network organizations according to the paragraph the second this Item from the unrestricted group of people till March 15, 2015 and no later than March 31, 2015 post on the official sites in Internet network the report of the arrived offers with indication of on each of them the motivated line item containing information on accounting in the project of investing program of such offer or on refusal of its accounting and also open according to the paragraph the second this Item project information of the investing programs finished by results of public discussion;
the network organizations carried to number of subjects of power industry which investing programs affirm the Ministry of Energy of the Russian Federation send investing programs to the Ministry of Energy of the Russian Federation on approval till April 1, 2015;
The Ministry of Energy of the Russian Federation sends for consideration in Advisory council under the Government of the Russian Federation and the council of consumers formed under Government Commission on Electricity Generation (further respectively - Advisory council, council of consumers, the Commission), the projects of investing programs of the network organizations which arrived on approval according to the procedure, established by Rules of approval of investing programs of subjects of power industry in which capitals the state, and the network organizations, approved by the order of the Government of the Russian Federation of December 1, 2009 No. 977 "About investing programs of subjects of power industry" participates;
The advisory council and council of consumers in time no more than 30 calendar days from the date of receipt of the project of investing program of the network organization submit within the Ministry of Energy of the Russian Federation of the conclusion by results of consideration of such project of investing program, including if necessary motivated offers on its completion;
in case of placement by the network organization carried to number of subjects of power industry which investing programs affirm the Ministry of Energy of the Russian Federation according to the paragraph the second this Item on the official site in Internet networks of information on the modifed project of investing program in which the offers posted on the official site of the network organization in the Internet networks during its public discussion, the offer of Advisory council and (or) council of consumers on completion of the project of investing program of the network organization provided to the Ministry of Energy of the Russian Federation according to the paragraph to the sixth this Item are not considered, council of consumers has the right to send within 15 calendar days to the Commission the appeal about need of accounting of the specified offers for investing program of the network organization, materials according to such offers, the report of offers, arrived during public discussion of the project of investing program of the network organization, posted by the network organization on the official site in Internet networks, the copy of offers of Advisory council and (or) council of the consumers on completion of the project of investing program provided to the Ministry of Energy of the Russian Federation for consideration by the Commission with participation of members of council of consumers and acceptances concerning the specified offers of the relevant decision;
the appeal of council of consumers provided by this Item is considered by the Commission within 30 calendar days from the date of its obtaining on condition of receipt of the specified appeal of council of consumers to the terms established by this Item;
the network organization carried to number of subjects of power industry which investing programs affirm the Ministry of Energy of the Russian Federation submits in the Ministry of Energy of the Russian Federation for approval the investing program finished according to the decision of the Commission provided by this Item, in time, not exceeding 15 calendar days from the date of receipt of the relevant decision of the Commission by the network organization;
investing programs of the network organizations affirm the Ministry of Energy of the Russian Federation till October 1, 2015.
17. The realization of this resolution is enabled by federal executive bodies within the established extreme number of their workers, and also budgetary appropriations provided to these bodies in the federal budget on management and management in the field of the established functions.
18. Declare invalid the subitem "v" of Item of 3 changes which are made to acts of the Government of the Russian Federation, approved by the order of the Government of the Russian Federation of December 29, 2011 No. 1178 "About pricing in the field of regulated prices (rates) in power industry" (The Russian Federation Code, 2012, No. 4, the Art. 504).
19. Items 11, 13 and 18 these resolutions, Item 1, the subitem "v" and paragraphs the fifteenth, twenty third, the twenty fourth, the thirty fifth, forty third, fifty second and fifty third the subitem "g" of Item of 3 changes approved by this resolution become effective since January 1, 2016.
Russian Prime Minister
D. Medvedev
Approved by the Order of the Government of the Russian Federation of February 16, 2015 No. 132
1. In standards of disclosure of information by subjects wholesale and the retail markets of electrical energy approved by the order of the Government of the Russian Federation of January 21, 2004 No. 24 "About approval of standards of disclosure of information by subjects wholesale and the retail markets of electrical energy" (The Russian Federation Code, 2004, No. 4, Art. 282; 2009, No. 17, Art. 2088; 2010, No. 33, Art. 4431; 2012, No. 23, Art. 3008; 2013, No. 31, Art. 4226; No. 36, Art. 4586; No. 50, Art. 6598; 2014, No. 8, Art. 815; No. 19, Art. 2416; No. 25, Art. 3311):
a) state Item 10 in the following edition:
"10. The subjects of the markets of electrical energy carried to number of subjects of power industry which investing programs affirm federal executive body and (or) executive bodies of subjects of the Russian Federation open information specified in the subitem "an" of Item 9 of this document on the official site in Internet network determined by the Government of the Russian Federation for disclosure of information on investing programs of the specified subjects of power industry, annually no later than April 1.
Subjects of the markets of electrical energy, except for subjects of the markets of electrical energy specified in paragraph one of this Item open information specified in the subitem "an" of Item 9 of this document, in electronic mass media on the official sites of subjects of the markets of electrical energy or on other official site in Internet network determined by the Government of the Russian Federation and (or) in the official printing publication annually, no later than June 1.";
b) in Item 11:
state the subitem "zh" in the following edition:
"g) about investing program (about the project of investing program and (or) the project of the changes made to investing program (further - the project of investing program) and the materials proving it, including:
lists of the investment projects for realization of investing program (the project of investing program) realized with use of the investment resources included in regulated by the state of the price (rates), and the investment projects realized without use of the specified investment resources with indication of identifiers of investment projects, one or several purposes of implementation of investment projects (development of power network, strengthening of power network connected with connection of new consumers, substitution (updating) of power network, increase in reliability of the rendered services in the field of power industry, improvement of quality of the rendered services in the field of power industry, fulfillment of requirements of the legislation of the Russian Federation, instructions of executive bodies, regulations of the markets of electrical energy, increase in cost efficiency (action, directed to decrease in operating costs) rendering services in the field of power industry, ensuring the current activities in the field of power industry (including development of information infrastructure, economic ensuring activities), the investments connected with the activities which are not relating to the sphere of power industry) and planned values of the quantitative indices of investing program (the project of investing program) specified for every year of its realization, including indicators characterizing achievement of the specified purposes of investing program (the project of investing program) on separate projects (to project groups, investing program in general). The identifier of the investment project is understood as unique digital, alphabetic, symbolical reference or combinations of such designations, including the codes intended for unambiguous determination (identification) of the investment project. The identifier of the investment project is determined by the subject of the markets of electrical energy once according to the methodical instructions approved by the Ministry of Energy of the Russian Federation and does not change throughout all term of implementation of the investment project, and also after completion of its realization. The organization for management of single national (all-Russian) power network creates the specified lists of investment projects with distribution to investment projects by results of which accomplishment compliance of power generation facilities is provided, to construction (reconstruction, upgrade) of which implementation of the specified investment projects is directed, to the criteria of reference of objects of electric grid economy to single national (all-Russian) power network approved by the order of the Government of the Russian Federation of January 26, 2006 No. 41 "About criteria of reference of objects of electric grid economy to single national (all-Russian) power network" and also other investment projects. The list and procedure of payments of quantitative indices of investing program (the project of investing program) are determined according to the methodical instructions approved by the Ministry of Energy of the Russian Federation;
the short description of investing program (the project of investing program) in the main directions of investment projects including including specifying is more whole also reasons for need of implementation of investment projects, the entered (removed) capacity and (or) other characteristics of objects of investing activities, the location of objects of investing activities, terms of input (conclusion) of objects of investing activities, including terms of input (conclusion) of power generation facilities, indicators of energy efficiency of the equipment and other indicators of investment projects of investing program (the project of investing program);
funding plan and development of capital investments according to investment projects concerning every year of the period of realization of investing program (the project of investing program) with indication of according to each investment project of the planned sources of financing, all-in and residual cost of investment projects (as of the beginning of calendar year at which the investing program (the project of investing program), the planned amounts of financing and development of capital investments concerning every year of the period of realization of investing program (the project of investing program) reveals;
results of calculations of amounts of the financial requirements necessary for construction of facilities of power industry executed according to the enlarged standard rates of the price of prototype technology solutions of capital construction of power generation facilities approved by the Ministry of Energy of the Russian Federation and also information on the prototype technology solutions of capital construction of power generation facilities, their technical performances used in case of such calculations and about the enlarged standard rates of the price corresponding to them;
the plan of input of fixed assets in natural and value term with separation according to investment projects constituted for realization of investing program (the project of investing program) including with distribution on quarters in the 1st year of realization of investing program (the project of investing program) and year in which the investing program reveals (when applicable);
the financial plan of the subject of power industry constituted for realization of investing program (the project of investing program) since 1st year of its realization, with separation on types of activity (including the regulated state), and also with indication of sources and methods of financing of investing program (the project of investing program) and reporting indicators of execution of the financial plan of the subject of power industry for the last and current years;
the list of subjects of the Russian Federation in the territory of which the investing program (the project of investing program) of the organization for management of single national (all-Russian) power network provides construction (reconstruction, upgrade, modernization) objects of electric grid economy and also there are objects of electric grid economy which are entering single national (all-Russian) power network and not belonging on the property right of the specified organization (reveals the organization for management of single national (all-Russian) power network);
passports of the investment projects provided by investing program (the project of investing program), the containing information, stipulated in Item 11(8) this documents;
the values of target indicators for the purposes of forming of investing program established according to the procedure, approved by the Ministry of Energy of the Russian Federation;
the materials proving the cost of the investment projects provided by investing program (the project of investing program) including the explanatory note, estimate calculations and other documents and calculations which, according to the network organization, can serve as reasons for cost of the specified investment projects;
the program of research and (or) developmental works for realization of investing program (the project of investing program) with distribution by years and the description of the work content (in the presence of that);
the copy of the decision on approval of the project of investing program by the board of directors (supervisory board) of the network organization, and in the absence of the board of directors (supervisory board) - joint (individual) executive body or other authorized body of the network organization (does not reveal in case of publication of project information of investing program in cases if terms of disclosure of such information according to Item 12 of this document are provided by the Rules of approval of investing programs of subjects of power industry approved by the order of the Government of the Russian Federation of December 1, 2009 No. 977 "About investing programs of subjects of power industry" (further - Rules of approval of investing programs of subjects of power industry);
the program for energy saving and increase in energy efficiency (for the organizations which according to the legislation on energy saving and on increase in energy efficiency claim and realize programs in the field of energy saving and increase in energy efficiency);
the conclusions (reports) by results of carrying out technological and price audit of investment projects of construction of facilities of power industry in cases if receipt of such conclusions (reports) is obligatory;
the conclusion by results of carrying out technological and price audit of investing program (the project of investing program) (in the presence of that) executed according to methodical recommendations, stipulated in Item the 5th orders of the Government of the Russian Federation of February 16, 2015 No. 132 "About introduction of amendments to some acts of the Government of the Russian Federation concerning approval of investing programs of subjects of power industry and control of their realization";
information on availability at the network organization stipulated by the legislation the Russian Federation about privatization of investment obligations concerning objects of electric grid economy, and also about conditions of such obligations;";
add with the subitem "(1)" the following content:
"(1)) about reports on realization of investing program and on the materials proving them, including:
the report on realization of investing program created with distribution according to lists of investment projects with indication of actual:
the entered (removed) capacity and (or) other characteristics of the objects of investing activities provided by the corresponding investment projects and also the dates of input (conclusion) specified objects;
amounts of financing and development of capital investments, and also sources of financing of investment projects of investing program;
amounts of input of fixed asset objects in natural and value term according to investment projects of investing program;
cost, technical, quantitative and other indicators of technology solutions of capital construction of the power generation facilities put into operation corresponding to prototype technology solutions of capital construction of power generation facilities concerning which the Ministry of Energy of the Russian Federation establishes the enlarged standard rates of the price;
values of quantitative indices of investing program and the achieved results in the part concerning expansion of handling capacity, decrease in losses in networks and increases in reserve for joining of consumers separately on each center of food of 35 kV and above;
the report on the executed purchases of goods, works and services for realization of the approved investing program with distribution according to each investment project;
performance report of the financial plan of the subject of power industry;
the passports of investment projects containing information, stipulated in Item 11(8) this documents as of reporting date;
the conclusion by results of carrying out technological and price audit of the report on realization of investing program (in the presence of that) executed according to methodical recommendations, stipulated in Item the 5th orders of the Government of the Russian Federation of February 16, 2015 No. 132 "About introduction of amendments to some acts of the Government of the Russian Federation concerning approval of investing programs of subjects of power industry and control of their realization";";
c) add with Item 11 (8) the following content:
"11(8). The passport of the investment project is understood as the document in which contain:
a) identifier of the investment project;
b) the planned purposes, tasks, stages, terms and specific results of implementation of the investment project;
c) indicators of the investment project, including indicators of energy efficiency;
d) impact assessment of the investment project on achievement of planned values of quantitative indices of realization of investing program (the project of investing program);
e) schedules of implementation of investment projects on construction (reconstruction, upgrade and dismantle) of power generation facilities, including their names, the planned terms and amounts of accomplishment of milestones of implementation of investment projects, the amounts of financing and development of capital investments, including with distribution to the main stages of works, and also input of fixed assets with indication of reporting data for the last and current years for already implementable projects;
e) reporting information on the course of implementation of the investment project (concerning implementable investment projects), including results of purchases of the goods, works and services executed for the purposes of implementation of the investment project;
g) information on the name, the location, the maximum capacity and its distribution on each point of accession to objects of electric grid economy of power receiving devices of consumers which need to be attached to power networks of the network organization according to the signed agreements on implementation of technological accession to power networks containing the specifications which are integral part in which as a part of the list of actions for technological accession the actions provided by the investment project are determined;
h) information on the obligations of the network organization defined by agreements on implementation of technological accession to power networks on accomplishment of the actions provided by the investment project;
i) project indicators of the planned loading of transformer and other substations, construction (reconstruction, upgrade) of which are planned to be performed within realization of investing program (the project of investing program);
j) information on extent of loading entered after construction of facilities of electric grid economy, determined according to the methodical instructions approved by the Ministry of Energy of the Russian Federation;
k) information on results of control measurements of electric loadings of the equipment of objects of electric grid economy, reconstruction (upgrade, modernization) of which is provided by the investment project;
l) information on the maximum capacity of power receiving devices of the consumers attached to objects of electric grid economy reconstruction (upgrade, modernization) of which is provided by the investment project, determined according to Item 13 (1) Rules of non-discriminatory access to services in transfer of electrical energy and rendering these services approved by the order of the Government of the Russian Federation of December 27, 2004 No. 861 "About approval of Rules of non-discriminatory access to services in transfer of electrical energy and rendering these services, Rules of non-discriminatory access to services in supervisory control in power industry and rendering these services, Rules of non-discriminatory access to services of Trading System Administrator of the wholesale market and rendering these services and Rules of technological connection of power receiving devices of consumers of electrical energy facilities for production of electrical energy, and also objects of electric grid economy belonging to the network organizations and other persons to power networks", and the maximum capacity of power receiving devices of the consumers planned to accession to objects of electric grid economy the construction (reconstruction, upgrade and (or) modernization) of which is provided by the investment project, according to agreements on implementation of technological accession to power networks;
m) information on the power generation facilities provided by the investment project, containing:
in the scheme and the development program of Power pool system of Russia approved according to the procedure, established by the Government of the Russian Federation, - if the investment project provides actions for construction in Power pool system of Russia of interstate power lines, power lines and objects of electric grid economy, project nominal the class of tension of which constitutes 220 kV and above, and also power lines of 110 kV and above, providing issue of capacity existing and planned to construction of facilities on production of electrical energy which established generating capacity exceeds 25 MW;
in schemes and development programs of power industry of the subjects of the Russian Federation approved according to the procedure, established by the Government of the Russian Federation, - if the investment project provides actions for construction in the territory of appropriate subjects of the Russian Federation in Power pool system of Russia of power lines and objects of electric grid economy which project nominal class of tension constitutes from 110 kV (inclusive) to 220 kV, or construction of power lines and objects of electric grid economy in technologically isolated territorial electric utility systems;
o) information on the planned (target) change of maximum permissible values of technological parameters of functioning of Power pool system of Russia or technologically isolated territorial electric utility systems (including the level of tension and handling capacity of power network) caused by parameters of work of power generation facilities as a result of implementation of actions within the investment project;
o) the schematic map with display of the planned location of power generation facilities, construction (reconstruction, upgrade, modernization and (or) dismantle) of which is provided by the investment project, and also adjacent power generation facilities which exist or the construction of which is planned. The schematic map with display of the planned location of objects of federal importance, objects of regional value, objects of local value, construction (reconstruction, upgrade, modernization and (or) dismantle) of which is provided by the investment project, shall conform to requirements imposed by the legislation on town-planning activities to cards of the planned placement of objects of federal importance, objects of regional value and objects of local value of the corresponding schemes of territorial planning. Information filling of the schematic map shall meet requirements of regulating documents imposed to cartographic materials. The schematic map is created based on layers of digital cartographic basis.";
d) in Item 12:
word in paragraph one", the paragraph the second the subitem "zh" to exclude;
the fourth to state the paragraph in the following edition:
"Information specified in the subitem "(1)" Item 11 of this document, it is signed with use of the strengthened qualified digital signature, is subject to publication on the official site in Internet network determined by the Government of the Russian Federation, annually till March 1, or in the terms provided by Rules of approval of investing programs of subjects of power industry for disclosure of project information of changes in investing program and it is updated in the terms established by Rules of approval of investing programs of subjects of power industry. Information specified in paragraphs the second - the tenth the subitem "(1)" Item 11 of this document, reveals in the form of electronic documents according to forms, rules of filling of the specified forms and the requirements to their formats of disclosure approved by the Ministry of Energy of the Russian Federation in coordination with the Ministry of Telecom and Mass Communications of the Russian Federation.";
add with the paragraph of the following content:
"Information specified in the subitem "(1)" Item 11 of this document, it is signed with use of the strengthened qualified digital signature and is subject to publication on the official site in Internet network determined by the Government of the Russian Federation, quarterly not later than in 45 days after the termination of reporting quarter, and also annually, till April 1, by results of execution of investing program for the previous calendar year. Information specified in paragraphs the second - the tenth the subitem "(1)" Item 11 of this document, reveals in the form of electronic documents according to forms, rules of filling of the specified forms and the requirements to their formats of disclosure approved by the Ministry of Energy of the Russian Federation in coordination with the Ministry of Telecom and Mass Communications of the Russian Federation.";
e) in Item 13:
state the subitem "d" in the following edition:
"e) about investing program (the project of investing program) of the subject of supervisory control, including:
lists of the investment projects for realization of investing program (the project of investing program) realized with use of the investment resources included in regulated by the state of the price (rates), and the investment projects realized without use of the specified investment resources with indication of identifiers of investment projects;
the short description of investing program (the project of investing program) in the main directions of investment projects including including specifying is more whole also reasons for need of implementation of investment projects, characteristics of objects of investing activities, the location of objects of investing activities, terms of input (conclusion) of objects of investing activities, including terms of input (conclusion) of power generation facilities, indicators of energy efficiency of the equipment and other indicators of investment projects of investing program (the project of investing program);
funding plan and development of capital investments according to investment projects concerning every year of the period of realization of investing program (the project of investing program) with indication of according to each investment project of the planned sources of financing, all-in and residual cost of investment projects (as of the beginning of calendar year at which the investing program (the project of investing program), and also the planned amounts of financing and development of capital investments concerning every year of the period of realization of investing program (the project of investing program) reveals;
the plan of input of fixed assets in natural and value term with separation according to investment projects constituted for realization of investing program (the project of investing program) including with distribution on quarters in the 1st year of realization of investing program (the project of investing program) and year in which the investing program reveals (when applicable);
the copy of the decision on approval of the project of investing program by the board of directors (supervisory board) of the subject of supervisory control, and in the absence of the board of directors (supervisory board) - joint (individual) executive body or other authorized body of the subject of supervisory control (does not reveal in case of publication of project information of investing program in cases if terms of disclosure of such information according to Item 14 of this document are provided by Rules of approval of investing programs of subjects of power industry);
the program for energy saving and increase in energy efficiency (for the organizations which according to the legislation on energy saving and on increase in energy efficiency claim and realize programs in the field of energy saving and increase in energy efficiency);
the conclusions (reports) by results of carrying out technological and price audit of investment projects in cases if receipt of such conclusions (reports) is obligatory;";
add with the subitem "д (1)" the following content:
"д (1)) about reports on realization of investing program of the subject of supervisory control and on the materials proving them, including:
the report on realization of investing program of the subject of supervisory control created with distribution according to lists of investment projects with indication of actual:
characteristics of objects of investing activities, and also dates of input (conclusion) of the corresponding objects;
amounts of financing and development of capital investments, and also sources of financing of investment projects of investing program;
amounts of input of fixed asset objects in natural and value term according to investment projects of investing program;
the report on the executed purchases of goods, works and services for realization of the approved investing program of the subject of supervisory control with distribution according to each investment project;";
e) in Item 14:
the twelfth to state the paragraph in the following edition:
"Information specified in the subitem "d" of Item 13 of this document is signed with use of the strengthened qualified digital signature, is subject to publication on the official site in Internet network determined by the Government of the Russian Federation, annually till April 15, or in the terms provided by Rules of approval of investing programs of subjects of power industry for disclosure of project information of changes in investing program and is updated in the terms established by Rules of approval of investing programs of subjects of power industry. Information specified in paragraphs the second - the fifth the subitem "d" of Item 13 of this document, reveals in the form of electronic documents according to forms, rules of filling of the specified forms and the requirements to their formats of disclosure approved by the Ministry of Energy of the Russian Federation in coordination with the Ministry of Telecom and Mass Communications of the Russian Federation.";
after the paragraph of the twelfth to add with the paragraph of the following content:
"Information specified in the subitem "д (1)" Item 13 of this document, it is signed with use of the strengthened qualified digital signature and is subject to publication on the official site in Internet network determined by the Government of the Russian Federation, quarterly not later than in 45 days after the termination of reporting quarter, and also annually, till April 1, by results of execution of investing program for the previous calendar year. The specified information reveals in the form of electronic documents according to forms, rules of filling of the specified forms and the requirements to their formats of disclosure approved by the Ministry of Energy of the Russian Federation in coordination with the Ministry of Telecom and Mass Communications of the Russian Federation.";
g) add with Item 15 (1) the following content:
"15(1). The electric power producers carried to number of subjects of power industry whose investing programs affirm the Ministry of Energy of the Russian Federation and (or) executive bodies of subjects of the Russian Federation open information on investing programs (projects of investing programs), including:
lists of the investment projects for realization of investing program (the project of investing program) realized with use of the investment resources included in regulated by the state of the price (rates), and the investment projects realized without use of the specified investment resources with indication of identifiers of investment projects;
the short description of investing program (the project of investing program) in the main directions of investment projects including including specifying is more whole also reasons for need of implementation of investment projects, the entered (removed) capacity and (or) other characteristics of objects of investing activities, the location of objects of investing activities, terms of input (conclusion) of objects of investing activities, including terms of input (conclusion) of power generation facilities, indicators of energy efficiency of the equipment and other indicators of investment projects of investing program (the project of investing program);
funding plan and development of capital investments according to investment projects concerning every year of the period of realization of investing program (the project of investing program) with indication of according to each investment project of the planned sources of financing, all-in and residual cost of investment projects (as of the beginning of calendar year at which the investing program (the project of investing program), and also the planned amounts of financing and development of capital investments concerning every year of the period of realization of investing program (the project of investing program) reveals;
the plan of input of fixed assets in natural and value term with separation according to investment projects constituted for realization of investing program (the project of investing program) including with distribution on quarters in the 1st year of realization of investing program (the project of investing program) and year in which the investing program reveals (when applicable);
the copy of the decision on approval of investing program (the project of investing program) by the board of directors (supervisory board) of the electric power producer, and in the absence of the board of directors (supervisory board) - joint (individual) executive body or other authorized body of the electric power producer (does not reveal in case of publication of project information of investing program in cases if terms of disclosure of such information according to Item 17 (2) this document are provided by Rules of approval of investing programs of subjects of power industry);
the program for energy saving and increase in energy efficiency (for the organizations which according to the legislation on energy saving and on increase in energy efficiency claim and realize programs in the field of energy saving and increase in energy efficiency);
the conclusions (reports) by results of carrying out technological and price audit of investment projects of construction of facilities of power industry in cases if receipt of such conclusions (reports) is obligatory.";
h) add the Section IV with Item 17 (2) the following content:
"17(2). Information specified in Item 15 (1) this document, it is signed with use of the strengthened qualified digital signature, is subject to publication on the official site in Internet network determined by the Government of the Russian Federation, annually till April 15, or in the terms provided by Rules of approval of investing programs of subjects of power industry for disclosure of project information of changes in investing program and it is updated in the terms established by Rules of approval of investing programs of subjects of power industry. Information specified in paragraphs the second - the fifth Item 15 (1) this document, reveals in the form of electronic documents according to forms, rules of filling of the specified forms and the requirements to their formats of disclosure approved by the Ministry of Energy of the Russian Federation in coordination with the Ministry of Telecom and Mass Communications of the Russian Federation.".
2. In Rules of development and approval of the schemes and programs of perspective development of power industry approved by the order of the Government of the Russian Federation of October 17, 2009 No. 823 "About schemes and programs of perspective development of power industry" (The Russian Federation Code, 2009, No. 43, the Art. 5073):
a) in Item 22:
state the subitem "g" in the following edition:
"d) the list of implementable and perspective projects on development of power networks which accomplishment taking into account results of use of perspective settlement model of Power pool system of Russia is necessary for ensuring the forecast demand for electrical energy (capacity) in Power pool system of Russia provided by the development program of Power pool system of Russia, reliability of functioning of Power pool system of Russia and quality of electrical energy in it which conform to requirements of technical regulations and other mandatory requirements, and also for ensuring decrease in influence of technological and system restrictions for the prices developing in the markets of electrical energy and for fulfillment of requirements to ensuring regulation (compensation) reactive electric power;";
add with the subitem "z" of the following content:
"h) assessment of planned measure values of reliability of the rendered services concerning the organization for management of single national (all-Russian) power network taking into account accomplishment of the actions provided by the list of implementable and perspective projects on development of the high-level and distribution networks.";
b) add Item 27 with subitems "d" and "e" of the following content:
"e) the list of implementable and perspective projects on development of territorial distribution networks which accomplishment is necessary for ensuring forecast demand for electrical energy (capacity) in the territory of the subject of the Russian Federation and (or) technologically isolated territorial electric utility system, the appropriate subject of the Russian Federation provided by the development program of power industry, and also for ensuring reliable power supply and quality of electrical energy in the territory of appropriate subject of the Russian Federation and (or) technologically isolated territorial electric utility system which conform to requirements of technical regulations and other mandatory requirements;
e) assessment of planned measure values of reliability of the rendered services concerning the territorial network organizations or their separate divisions rendering services in transfer of electrical energy in the territory of appropriate subject of the Russian Federation taking into account accomplishment of the actions provided by the list of implementable and perspective projects on development of territorial distribution networks.".
3. In the order of the Government of the Russian Federation of December 1, 2009 No. 977 "About investing programs of subjects of power industry" (The Russian Federation Code, 2009, No. 49, Art. 5978; 2010, No. 28, Art. 3702; 2012, No. 4, Art. 504; No. 14, Art. 1635; 2013, No. 9, Art. 955; 2014, No. 14, Art. 1638):
a) in paragraphs second and third Item 1 of the word" in which authorized capital the state participates, and the network organizations" to exclude;
b) criteria of reference of subjects of power industry in which authorized capital the state participates, and the network organizations to number of subjects which investing programs (including determination of sources of their financing) affirm authorized federal executive body and (or) executive bodies of subjects of the Russian Federation, approved by the specified resolution to state in the following edition:
"Are approved by the Order of the Government of the Russian Federation of December 1, 2009 No. 977 (in edition of the Order of the Government of the Russian Federation of February 16, 2015 No. 132)
Criteria of reference of subjects of power industry to number of subjects which investing programs (including determination of sources of their financing) affirm authorized federal executive body and (or) executive bodies of subjects of the Russian Federation
1. The Ministry of Energy of the Russian Federation investing programs of the following subjects of power industry affirm:
a) organization for management of single national (all-Russian) power network;
b) the network organizations which according to the Federal Law "About Protection of the Competition" enter one group of persons with the organization for management of single national (all-Russian) power network, except for the network organizations entering one group of persons with the specified organization only for the sign specified in Item 7 of part 1 of article 9 of the specified Federal Law;
c) System Operator of the Unified Energy System of Russia;
d) the wholesale generating company created based on decisions of the Government of the Russian Federation as a result of reorganization of affiliated and dependent joint-stock companies of the Russian open joint stock company of power and electrification "Power pool system of Russia" to which authorized capital the generating objects of hydroelectric power stations are transferred (further - the wholesale hydrogeneration company);
e) subjects of power industry which immediate or indirect possession of shares in the authorized capital in the amount of at least 20 percent plus one voting share is performed by the wholesale hydrogeneration company;
e) the subjects of power industry providing construction, reconstruction, upgrade and (or) modernization of objects (power units) of nuclear power plants in investing program.
2. Subjects of power industry under condition if they do not correspond to criteria, stipulated in Item 1 these criteria, are among subjects which investing programs affirm executive bodies of subjects of the Russian Federation if they correspond to one of the following criteria:
a) availability of share of the subject of the Russian Federation (subjects of the Russian Federation) in the authorized capital of the subject of power industry constitutes at least 50 percent plus one voting share;
b) the subject of power industry provides financing of investing program with use of the investment resources considered in case of price fixation (rates) in power industry which state regulation in accordance with the legislation of the Russian Federation about power industry belongs to powers of executive bodies of subjects of the Russian Federation in the field of state regulation of the prices (rates);
c) the subject of power industry in which authorized capital the subject of the Russian Federation participates, provides in investing program construction of the generating object installed capacity of 25 MW and above and (or) reconstruction (upgrade, modernization) of the generating object with increase in installed capacity by 25 MW and above.";
c) Rules of approval of investing programs of subjects of power industry in which authorized capital the state participates, and the network organizations, approved by the specified resolution, to state in the following edition:
"Are approved by the Order of the Government of the Russian Federation of December 1, 2009 No. 977 (in edition of the Order of the Government of the Russian Federation of February 16, 2015 No. 132)
Rules of approval of investing programs of subjects of power industry
I. General provisions
1. These rules determine approval procedure of investing programs of the subjects of power industry corresponding to criteria of reference of subjects of power industry to number of subjects which investing programs (including determination of sources of their financing) affirm the authorized federal executive body and (or) executive bodies of subjects of the Russian Federation established by the Government of the Russian Federation (further respectively - investing programs, subjects of power industry) and procedure for modification of investing programs.
2. The investing program in these rules is understood as set of all investment projects planned to realization and (or) realized by the subject of power industry during the period for which the investing program is developed.
3. Investing programs of subjects of power industry, except for the subjects of power industry specified in the paragraph the second this Item affirm annually for realization, constituting at least 3 years.
Investing programs of subjects of power industry which state regulation of the prices (rates) for products (services) is performed on the basis of long-term parameters of regulation affirm for the next period of realization following the current long-term period of regulation which duration conforms to the requirements to duration of the next long-term period of regulation established by the legislation of the Russian Federation on power industry concerning such subject of power industry.
4. Investing programs of the network organizations, including the organizations for management of single national (all-Russian) power network, are created based on target indicators, including the target indicators of level of reliability and service quality established by Federal Antimonopoly Service and executive bodies of subjects of the Russian Federation in the field of state regulation of the prices (rates) according to the procedure, approved by the Ministry of Energy of the Russian Federation.
5. The investing programs providing construction (reconstruction, upgrade, modernization and (or) dismantle) of power generation facilities affirm on condition of not exceeding of amount of the financial requirements necessary for implementation of investment projects of construction (reconstruction, upgrade, modernization and (or) dismantle) the specified objects, over the amount of financial requirements determined according to the enlarged standard rates of the price of prototype technology solutions of capital construction of power generation facilities approved by the Ministry of Energy of the Russian Federation.
The investing programs of the network organizations providing implementation of investment projects on construction within Power pool system of Russia of interstate power lines, power lines and substations which project nominal class of tension constitutes 220 kV and above affirm under condition if the specified investment projects (except for the investment projects providing accomplishment of actions according to the signed agreements on implementation of technological accession to objects of electric grid economy of such network organizations and which are completely financed by payment for technological accession) are included in the list of implementable and perspective projects on development of power networks provided by the scheme and the development program of Power pool system of Russia approved according to the procedure, established by the Government of the Russian Federation.
The investing programs of the network organizations providing implementation of investment projects on construction in Power pool system of Russia of power lines and substations which project nominal class of tension constitutes from 110 kV (inclusive) to 220 kV and (or) to construction of power lines and substations within technologically isolated territorial electric utility systems affirm under condition if the specified investment projects (except for the investment projects providing accomplishment of actions according to the signed agreements on implementation of technological accession to objects of electric grid economy of such network organizations and which are completely financed by payment for technological accession) are included in the list of implementable and perspective projects on development of territorial distribution networks, provided by the scheme and the development program of power industry of the subject of the Russian Federation in the territory of which placement of the specified power generation facilities is planned approved according to the procedure, established by the Government of the Russian Federation.
6. The network organization carried to number of subjects of power industry which investing programs affirm the Ministry of Energy of the Russian Federation and (or) executive bodies of subjects of the Russian Federation considers the offers on adjustment of the investing program approved according to these rules from persons which underwent authorization in the federal state information system "Single System of Identification and Authentication in the Infrastructure Providing Information and Technological Interaction of the Information Systems Used for Provision of the State and Municipal Services Electronically" posted on the official site of the federal state information system "Single Portal of the State and Municipal Services (Functions)" on the Internet (further - the official site of system) till January 15 of the year preceding the period in which the investing program provides implementation of actions of investment projects concerning which offers go.
Offers on adjustment of the approved investing program are posted on the official site of system by filling of interactive form and shall contain the description of the purposes, tasks and problems on which solution such offers, the offered terms of implementation of investment projects, including terms of input of power generation facilities are sent to operation and (or) their dismantle, the characteristic of the power generation facilities put into operation or dismantled, and also other information which, according to persons directing the specified offers can be reasons for adjustment of investing program.
The network organization no later than day of placement of information on investing program (the project of changes in investing program) according to standards of disclosure of information by subjects wholesale and the retail markets of electrical energy, approved by the order of the Government of the Russian Federation of January 21, 2004 No. 24 "About approval of standards of disclosure of information by subjects wholesale and the retail markets of electrical energy" (further - standards of disclosure of information), publishes on the official site of system the report of the offers posted on the official site of system with indication of according to each offer of the line item containing information on accounting of such offer in the project of changes in investing program or about motivated refusal of its accounting.
7. For the purpose of carrying out public discussion of the project of investing program in day of placement of information on him according to standards of disclosure of information:
the network organizations carried to number of subjects of power industry which investing programs affirm the Ministry of Energy of the Russian Federation send the notification on placement on the official site of system of the project of investing program containing specifying for date and the location (the complete e-mail address) to Advisory council under the Government of the Russian Federation and the council of consumers formed under Government Commission on Electricity Generation (further respectively - Advisory council, council of consumers, the Commission);
the network organizations carried to number of subjects of power industry which investing programs affirm executive bodies of subjects of the Russian Federation send the notification on placement on the official site of system of the project of investing program containing specifying for date and the location (the complete e-mail address) to the cross-industry councils of consumers formed under the supreme executive bodies of the government of appropriate subjects of the Russian Federation (further - cross-industry council of consumers).
The network organizations also post the specified notifications on the official sites on the Internet (further - Internet network).
8. Within public discussion of the project of investing program of the network organization of person, undergone authorization in the federal state information system "Single System of Identification and Authentication in the Infrastructure Providing Information and Technological Interaction of the Information Systems Used for Provision of the State and Municipal Services Electronically", post on the official site systems by filling of interactive form the offers to the project of investing program which shall contain specifying on component of the project of investing program to which offers, the description of the purposes, tasks and problems to which solution such offers, and also other information which, according to persons directing the specified offers can be reasons for such offers are directed belong. If offers provide implementation of investment projects, it is necessary to specify also offered terms of their realization, including terms of input of power generation facilities in operation and (or) their dismantle, the characteristic of the power generation facilities put into operation or dismantled.
The network organization considers the offers to the project of investing program posted in compliance by this Item on the official site of system till March 20 of year in which the project of investing program was posted on the official site of system according to standards of disclosure of information and no later than April 5 of the specified year posts on the official site of system the report of the arrived offers with indication of on each of them the motivated line item containing information on accounting in the project of investing program of such offer or on refusal of its accounting and also posts on the official site systems according to standards of disclosure of information the project of investing program finished by results of public discussion.
In case of violation of the terms of placement of the project of investing program and (or) the report of the arrived offers of the statement of the network organizations on approval of investing program established by this Item, specified in Items 10 and 11 of these rules, are not considered by the Ministry of Energy of the Russian Federation and executive bodies of subjects of the Russian Federation.
9. Consideration and approval of investing programs according to these rules is performed based on projects of the investing programs posted by subjects of power industry on the official site of system according to standards of disclosure of information, and other information and materials directed according to these rules.
Change and (or) removal of information on investing programs (projects of investing programs), other information and the materials posted on the official site of system is not allowed:
subjects of power industry according to standards of disclosure of information and these rules;
state bodies and the organizations according to these rules.
In case of origin at the operator of the federal state information system "Single Portal of the State and Municipal Services (Functions)" (further - the operator of system) the technical, program malfunctions or other problems attracting impossibility of accomplishment with use of the official site of system of the actions (placement of information, implementation of information exchange) provided by these rules and (or) standards of disclosure of information, the operator of system within 24 hours from the moment of emergence of the specified malfunctions and (or) problems posts on the official site systems (in the presence of opportunity) and (or) on the official site in Internet network the corresponding announcement containing date and time of emergence of the specified malfunctions and (or) problems.
In case of lack of possibility of placement on the official site of system of information provided by these rules and (or) standards of disclosure of information owing to origin at the operator of system of technical, program malfunctions or other problems subjects of power industry, state bodies and the organizations provide the specified information to the executive bodies authorized on approval of investing programs on electronic media of information in the terms established by these rules and (or) standards of disclosure of information. The executive bodies authorized on approval of investing programs within 3 working days from the date of receipt of the specified information post it on the official sites in Internet network if the operator of system placed the announcement provided by the paragraph the fifth this Item.
In case of lack of possibility of placement on the official site of system of the these rules of offers provided by Items 6 and 8 to investing programs and (or) projects of investing programs owing to origin at the operator of system of technical, program malfunctions or other problems, such offers are accepted by the relevant network organizations from the unrestricted group of people in the terms established by these rules.
The specified offers in case of their receipt in the network organization are subject to registration by such organization with assignment of registration number and specifying of receipt date no later than the working day following behind day of receipt of offers.
In case of lack of possibility of implementation with use of the official site of system of the information exchange provided by these rules owing to origin at the operator of system of technical, program malfunctions or other problems such information exchange is performed by the direction of the corresponding statements, notifications, documents and data in the form of the electronic documents signed with use of the strengthened qualified digital signature, to their receivers specified in these rules in the terms established by these rules.
The operator of system within 24 hours from the moment of renewal of possibility of placement of information and (or) implementation of information exchange with use of the official site of system posts on the official site systems and on the official site in Internet network the corresponding announcement containing date and time of such renewal.
Information posted according to this Item on the official sites of the executive bodies authorized on approval of investing programs in Internet network within 3 working days from the date specified in the announcement of the operator of system of renewal of possibility of placement of information and (or) implementation of information exchange with use of the official site of system is posted by the operator of system on the official site of system.
10. The subject of power industry no later than day of disclosure of project information of the investing program approved by the Ministry of Energy of the Russian Federation according to standards of disclosure of information (the network organization - no later than day of placement of the project of the investing program approved by the Ministry of Energy of the Russian Federation according to Item 8 of these rules, but no later than April 5 of the year preceding the period of realization of investing program) directs with use of the official site of system the application for approval of investing program (further - the statement) to the Ministry of Energy of the Russian Federation.
11. The subject of power industry no later than day of disclosure of project information of the investing program approved by executive body of the subject of the Russian Federation according to standards of disclosure of information (the network organization - no later than day of placement of the project of the investing program approved by executive body of the subject of the Russian Federation according to Item 8 of these rules, but no later than April 5 of the year preceding the period of realization of investing program) directs with use of the official site of system the application to the executive body of the subject of the Russian Federation authorized on approval of investing program in the territory of which the project of investing program provides implementation of investment projects (further - authorized body of the executive authority of the subject of the Russian Federation).
12. The application directed according to Item 10 of these rules shall contain the following information:
about compliance of the subject of power industry to the criteria specified in Item 1 of these rules;
date and the location of the project of investing program on the official site of system (the complete e-mail address);
the bases provided by the Federal Law "About Protection of the Competition" on which the subject of power industry who directed the application corresponds to the subitem "b" of Item 1 of the specified criteria with appendix of the calculations and copies of the documents signed with use of the strengthened qualified digital signature, proving such bases (are specified by the subjects of power industry corresponding to the subitem "b" of Item 1 of the specified criteria);
the bases on which the subject of power industry who directed the application corresponds to the subitem "d" of Item 1 of the specified criteria with appendix of the calculations and copies of the documents signed with use of the strengthened qualified digital signature, proving such bases (are specified by the subjects of power industry corresponding to the subitem "d" of Item 1 of the specified criteria);
about subjects of the Russian Federation in the territory of which the project of investing program of the subject of power industry, except for the organizations for management of single national (all-Russian) power network, provides implementation of investment projects (subjects of the Russian Federation in the territory of which the project of investing program of the organization for management of single national (all-Russian) power network provides implementation of investment projects on construction (to reconstruction, upgrade, modernization and (or) dismantle) power generation facilities and are placed the objects of electric grid economy which are entering single national (all-Russian) power network and not belonging on the property right of the specified organization);
availability in the project of investing program of the investment projects specified in subitems "v", "e" and "zh" of Item 18 of these rules.
The application directed according to Item 11 of these rules shall contain the following information:
about compliance of the subject of power industry to the criteria specified in Item 1 of these rules;
date and the location of the project of investing program on the official site of system (the complete e-mail address);
availability in the project of investing program of the investment projects specified in subitems "b", "v" and "g" of Item 19 of these rules.
13. Subjects of power industry, except for the network organizations, together with the statement send with use of the official site of system to the Ministry of Energy of the Russian Federation (authorized body of the executive authority of the subject of the Russian Federation) the following information in the form of the electronic documents signed with use of the strengthened qualified digital signature:
the financial plan of the subject of power industry constituted for project implementation of investing program with separation on types of activity including the regulated state, since 1st year of project implementation of investing program, with indication of sources and methods of financing of the project of investing program and reporting indicators of execution of the financial plan of the subject of power industry for the last and current years;
materials, the proving costs of the investment projects provided by the project of investing program including the explanatory note, estimate calculations and other documents and calculations which, according to the subject of power industry, can serve as reasons for cost of the specified investment projects;
the program of research and (or) developmental works for project implementation of investing program with breakdown by years and the description of the work content (in the presence of that);
passports of the investment projects provided by the project of investing program;
information on approval of the project of the investing program providing construction (reconstruction, upgrade and (or) modernization) of objects (power units) of nuclear power plants with State Atomic Energy Corporation "Rosatom".
The passport of the investment project is understood as the document containing the following information:
identifier of the investment project;
the planned purposes, tasks, stages, terms and specific results of implementation of the investment project;
indicators of the investment project, including indicators of energy efficiency;
schedules of implementation of investment projects on construction (reconstruction, upgrade, modernization and (or) dismantle) of power generation facilities, including their names, the planned terms and amounts of accomplishment of milestones of implementation of investment projects, the amounts of financing and development of capital investments, including with distribution to the main stages of works, and also input of fixed assets on quarters, with indication of for already implementable investment projects of reporting data for the last and current years;
reporting information on the course of implementation of the investment project (concerning implementable investment projects), including results of purchases of goods, works, the services executed for the purposes of implementation of the investment project;
information on the planned (target) change of maximum permissible values of technological parameters of functioning of Power pool system of Russia or technologically isolated territorial electric utility systems (including the level of tension and handling capacity of power network) caused by parameters of work of power generation facilities, as a result of implementation of actions, provided by the investment project on construction (reconstruction, upgrade, modernization and (or) dismantle) of power generation facilities;
the schematic map with display of the planned location of power generation facilities, construction (reconstruction, upgrade, modernization and (or) dismantle) of which is provided by the investment project, and also the adjacent power generation facilities existing and planned within the project of investing program. The schematic map with display of the planned location of objects of federal importance, objects of regional value, objects of local value, construction (reconstruction, upgrade, modernization and (or) dismantle) of which is provided by the investment project, shall conform to requirements imposed by the legislation on town-planning activities to cards of the planned placement of objects of federal importance, objects of regional value, objects of local value of the corresponding schemes of territorial planning. Information filling of the schematic map shall meet requirements of regulating documents imposed to cartographic materials. The schematic map is created based on layers of digital cartographic basis.
The financial plan of the subject of power industry and the passport of investment projects go in the form of electronic documents according to forms, rules of filling of the specified forms and the requirements to their formats approved by the Ministry of Energy of the Russian Federation in coordination with the Ministry of Telecom and Mass Communications of the Russian Federation.
14. The Ministry of Energy of the Russian Federation (authorized body of the executive authority of the subject of the Russian Federation) no later than 5 working days from the date of receipt directs applications with use of the official site of system to the subject of power industry motivated refusal in consideration of the application with indication of the notes having exhaustive character in the following cases:
the subject of power industry is among subjects which investing programs affirm authorized body of the executive authority of the subject of the Russian Federation (Ministry of Energy of the Russian Federation), except for the case provided by paragraph one of Item 67 of these rules;
the project of the investing program providing construction (reconstruction, upgrade, modernization) of objects (power units) of nuclear power plants is not approved with State Atomic Energy Corporation "Rosatom";
project information of investing program is posted on the official site of system not in full or not in the established form;
the statement and (or) the materials attached to it are provided with use of the official site of system not in full and (or) not in the established form.
15. The subject of power industry repeatedly sends with use of the official site of system to the Ministry of Energy of the Russian Federation (authorized body of the executive authority of the subject of the Russian Federation) the statement and the materials attached to it no later than day of disclosure of project information of investing program after elimination of notes of the Ministry of Energy of the Russian Federation (authorized body of the executive authority of the subject of the Russian Federation), but no later than 10 calendar days from the date of the direction the Ministry of Energy of the Russian Federation of notes to the subject of power industry with use of the official site of system.
16. The Ministry of Energy of the Russian Federation (authorized body of the executive authority of the subject of the Russian Federation) within 5 working days from the date of receipt of the statement and the materials attached to it directs with use of the official site of system to the subject of power industry motivated refusal in consideration of the application and the materials attached to it in case of receipt of the statement and the materials attached to it is later than the terms specified in Items 10, of 11 and 15 these rules.
17. The Ministry of Energy of the Russian Federation (authorized body of the executive authority of the subject of the Russian Federation) within 5 working days from the date of receipt with use of the official site of system of the statement and the materials attached to it posts on the official site of system the notification on acceptance to consideration of the project of investing program, and also sends such notification with use of the official site of system to the subject of power industry.
18. The Ministry of Energy of the Russian Federation along with placement on the official site of system of the notification on acceptance to consideration of the project of investing program sends such notification, and also the data containing in the statement, and the materials enclosed to the application with use of single system of interdepartmental electronic interaction to the following state bodies, and also the organizations:
a) Federal Antimonopoly Service;
b) The Ministry of Finance of the Russian Federation, the Ministry of Construction and Housing and Communal Services of the Russian Federation, the Ministry of Industry and Trade of the Russian Federation, the Ministry of Economic Development of the Russian Federation and Federal Antimonopoly Service (further - the interested federal executive bodies);
c) State Atomic Energy Corporation "Rosatom" if the project of investing program provides projects implementation:
on construction (to reconstruction, upgrade, modernization) objects (power units) of nuclear power plants;
on ensuring transfer of electrical energy (capacity) of objects (power units) of nuclear power plants on single national (all-Russian) power network and (or) ensuring reliability of work of nuclear power plants together with single national (all-Russian) power network;
d) the supreme executive bodies of the government of subjects of the Russian Federation in the territory of which the project of investing program of the organization for management of single national (all-Russian) power network provides implementation of investment projects on construction (to reconstruction, upgrade, modernization and (or) dismantle) power generation facilities and are placed the objects of electric grid economy which are entering single national (all-Russian) power network and not belonging on the property right of the specified organization;
e) the supreme executive bodies of the government of subjects of the Russian Federation in the territory of which the project of investing program of the subject of power industry, except for the organizations for management of single national (all-Russian) power network, provides implementation of investment projects;
e) System Operator of the Unified Energy System of Russia (further - the system operator) if the project of investing program provides in limits of Power pool system of Russia:
construction (reconstruction, upgrade, modernization and (or) dismantle) of objects of electric grid economy which project nominal class of tension constitutes 110 kV and above;
construction of facilities on production of electrical energy which established generating capacity exceeds 5 MW, and (or) reconstruction (upgrade, modernization) of facilities for production of electrical energy with increase in the established generating capacity by 5 MW and above;
g) the subjects of supervisory control specified in the list of technologically isolated territorial electric utility systems and appropriate subjects of supervisory control approved by the Government of the Russian Federation (further - subjects of supervisory control) if the project of investing program, except for projects of investing programs of subjects of supervisory control, provides in limits of the relevant technologically isolated territorial electric utility system construction (reconstruction, upgrade, modernization and (or) dismantle) of objects of electric grid economy, facilities for production of electrical energy;
h) Market Council;
i) Advisory council and council of consumers if the application is directed by the network organization.
19. The authorized body of the executive authority of the subject of the Russian Federation along with placement on the official site of system of the notification on acceptance to consideration of the project of investing program sends such notification, and also the data containing in the statement, and the materials enclosed to the application to the following state bodies and the organizations:
a) executive body of appropriate subject of the Russian Federation in the field of state regulation of the prices (rates);
b) the system operator, if the project of investing program within Power pool system of Russia provides:
construction (reconstruction, upgrade, modernization and (or) dismantle) of objects of electric grid economy which project nominal class of tension constitutes 110 kV and above;
construction of facilities on production of electrical energy which established generating capacity exceeds 5 MW, and (or) reconstruction (upgrade, modernization) of facilities for production of electrical energy with increase in the established generating capacity by 5 MW and above;
c) the subject of supervisory control, if the project of investing program, except for the project of investing program of the subject of supervisory control, provides in limits of the relevant technologically isolated territorial electric utility system construction (reconstruction, upgrade, modernization and (or) dismantle) of objects of electric grid economy, facilities for production of electrical energy;
d) The Ministry of Energy of the Russian Federation if the project of investing program provides construction and (or) reconstruction of the power lines and (or) transformer and other substations corresponding to the criteria of reference of objects of electric grid economy to single national (all-Russian) power network approved by the Government of the Russian Federation;
e) cross-industry council of consumers if the application is directed by the network organization.
II. Approval procedure of investing program Ministry of Energy of the Russian Federation
20. The federal executive bodies, executive bodies of subjects of the Russian Federation, state bodies and the organizations specified in Item 18 of these rules consider the project of investing program within the powers established by the legislation of the Russian Federation:
a) Federal Antimonopoly Service - regarding assessment of proposals of subjects of power industry on inclusion of the investment resources necessary for realization of investing program, in the regulated state of the price (rates) and compliance of the project of investing program of the organization for management of single national (all-Russian) power network to values of the target indicators of reliability and service quality established by Federal Antimonopoly Service for the purposes of forming of investing program of such organization;
b) The Ministry of Finance of the Russian Federation - regarding assessment of financial effects of realization of investing program for the federal budget, budgets of subjects of the Russian Federation and local budgets;
c) The Ministry of Construction and Housing and Communal Services of the Russian Federation - regarding questions of pricing in case of the designing and construction of facilities of capital construction provided by the project of investing program;
d) The Ministry of Industry and Trade of the Russian Federation - regarding compliance of the project of investing program to state programs, federal target programs, which is determined by the executive in charge (the state customer - the coordinator) the Ministry of Industry and Trade of the Russian Federation, regarding amounts and sources of financing of the capital construction projects of the project of investing program provided by such state programs, federal target programs;
e) The Ministry of Economic Development of the Russian Federation - regarding assessment:
compliance of the project of investing program to the forecast of social and economic development of the Russian Federation, subjects of the Russian Federation, municipalities, and also industries and sectors of economy for the short-term, medium-term and long-term periods;
efficiency of use of the means of the federal budget directed within investing program to capital investments;
e) Federal Antimonopoly Service - regarding control of observance of the antitrust law, and also of observance by the applicant who is the subject of natural monopoly, requirements of the legislation of the Russian Federation in the field of regulation of natural monopolies;
g) State Atomic Energy Corporation "Rosatom" - in part:
investment projects on construction (to reconstruction, upgrade, modernization) objects (power units) of nuclear power plants;
compliance of terms of input of the objects of electric grid economy included in schemes of issue of capacity of nuclear power plants, to terms of commissioning of the specified nuclear power plants;
investment projects on ensuring reliability of work of nuclear power plants together with single national (all-Russian) power network;
h) the supreme executive bodies of the government of subjects of the Russian Federation - in part:
questions of accomplishment by the network organizations of the actions provided by the schemes and development programs of power industry of subjects of the Russian Federation approved according to the procedure, established by the Government of the Russian Federation, at the expense of the investment resources offered by the network organizations to inclusion in the prices (rates) regulated by executive body of appropriate subject of the Russian Federation in the field of state regulation of the prices (rates);
questions of placement of power generation facilities in the territories of appropriate subjects of the Russian Federation;
estimates of proposals of subjects of power industry on inclusion of the investment resources necessary for realization of investing program, in the prices (rates) regulated by executive body of the subject of the Russian Federation in the field of state regulation of the prices (rates), and assessment of conformity of projects of investing programs of the network organizations, except for the organizations for management of single national (all-Russian) power network, to target measure values of reliability and service quality established by executive body of the subject of the Russian Federation in the field of state regulation of the prices (rates) for the purposes of forming of investing programs of such network organizations;
questions of provision of water objects in use for the purposes of production of electrical energy on the hydroelectric power stations placed (planned to placement) in the territories of appropriate subjects of the Russian Federation;
i) the system operator - regarding providing assessment: steady perspective working hours of Power pool system of Russia, including taking into account investment projects on construction (to reconstruction, upgrade, modernization and (or) dismantle) power generation facilities, to creation of devices (complexes) of relay protection and automatic equipment, systems of telemechanics and communication and terms of implementation of such projects;
the coordinated commissioning and conclusion from operation of the generating objects and objects of electric grid economy;
accomplishment of the scheme and development program of Power pool system of Russia and schemes and development programs of power industry of subjects of the Russian Federation;
elimination or decrease in technological restrictions for the greatest possible overflows of electrical energy between zones of free overflow in price zones of the wholesale market of electrical energy and capacity;
j) subjects of supervisory control - regarding providing assessment:
steady perspective working hours of the relevant technologically isolated territorial electric utility systems, including taking into account investment projects on construction (reconstruction, upgrade, modernization and (or) dismantle) of power generation facilities, creation of devices (complexes) of relay protection and automatic equipment, systems of telemechanics and communication and terms of implementation of such projects;
the coordinated commissioning and conclusion from operation of the generating objects and objects of electric grid economy;
accomplishment of schemes and development programs of power industry of subjects of the Russian Federation;
k) Market Council - regarding impact assessment of implementation of the investment projects provided by the project of investing program on the change in price in the wholesale market of electrical energy and capacity, and also on lifting of restrictions of free overflow of electrical energy (capacity);
l) Advisory council and council of consumers - regarding assessment of feasibility and justification of application of technology and cost solutions of the investment projects provided by the project of investing program, assessment of achievement of the performance indicators of the project of investing program declared by the subject of power industry including on the basis of results of technological and price audit of investing programs and investment projects (with such results).
21. If during consideration of the project of investing program there is need of refining of the specified project or information enclosed to the application the Ministry of Energy of the Russian Federation requests additional materials with use of the official site of system, having specified form of their representation and the requirement to them, and the subject of power industry represents the specified materials signed with use of the strengthened qualified digital signature, with use of the official site of system within 7 calendar days from the date of receipt of request.
22. The Federal Antimonopoly Service, State Atomic Energy Corporation "Rosatom" and the supreme executive bodies of the government of subjects of the Russian Federation specified in the subitem "d" of Item 18 of these rules in time no later than 30 calendar days from the date of placement by the Ministry of Energy of the Russian Federation of the notification on acceptance to consideration of the project of investing program submit with use of single system of interdepartmental electronic interaction within the Ministry of Energy of the Russian Federation of the conclusion about approval of the project of investing program or the exhaustive list of comments to it within the powers established by the legislation of the Russian Federation.
Federal Antimonopoly Service together with the conclusion about approval of the project of investing program of the organization for management of single national (all-Russian) power network or notes to it sends with use of single system of interdepartmental electronic interaction to the Ministry of Energy of the Russian Federation assessment:
price (tariff) effects of accomplishment of investing program of the organization for management of single national (all-Russian) power network for its realization;
compliance of the project of investing program of the organization for management of single national (all-Russian) power network to the values of target indicators of reliability and service quality established by Federal Antimonopoly Service for the purposes of forming of investing program.
The supreme executive bodies of the government of subjects of the Russian Federation specified in the subitem "d" of Item 18 of these rules together with the conclusion about approval of the project of investing program, except for the project of investing program of the organization for management of single national (all-Russian) power network, or notes to it send assessment to the Ministry of Energy of the Russian Federation:
price (tariff) effects of accomplishment of the specified investing program for its realization;
compliance of the specified project of investing program to the values of target indicators of reliability and service quality established by executive body of appropriate subject of the Russian Federation in the field of state regulation of the prices (rates) for the purposes of forming of investing program.
23. The interested federal executive bodies in time no later than 20 calendar days from the date of placement by the Ministry of Energy of the Russian Federation of the notification on acceptance to consideration of the project of investing program send with use of single system of interdepartmental electronic interaction to the Ministry of Energy of the Russian Federation of the conclusion by results of consideration of the project of investing program, including if necessary motivated offers on its completion, within the powers established by the legislation of the Russian Federation.
24. The system operator and (or) subjects of supervisory control in case of receipt of the notification on acceptance to consideration of the project of investing program, and also Market Council in time no later than 20 calendar days from the date of placement of such notification by the Ministry of Energy of the Russian Federation post on the official site systems of the conclusion by results of consideration of the project of investing program, including if necessary motivated offers on its completion.
25. The advisory council and council of consumers in time no later than 20 calendar days from the date of placement by the Ministry of Energy of the Russian Federation of the notification on acceptance to consideration of the project of investing program of the network organization post on the official site systems of the conclusion by results of consideration of the project of investing program of the network organization, including if necessary motivated offers on its completion.
26. The supreme executive bodies of the government of subjects of the Russian Federation in the territory of which there are objects of electric grid economy which are entering single national (all-Russian) power network and not belonging on the property right of the organization for management of single national (all-Russian) power network in case of receipt of the notification on acceptance to consideration of the project of investing program of the specified organization no later than 20 calendar days from the date of placement of such notification by the Ministry of Energy of the Russian Federation in time send with use of single system of interdepartmental electronic interaction to the Ministry of Energy of the Russian Federation of the conclusion by results of consideration of the project of investing program of the organization for management of single national (all-Russian) power network regarding investment projects on construction (reconstruction, upgrades, to modernization and (or) dismantle) power generation facilities which realization is planned to be enabled in the territory of appropriate subjects of the Russian Federation, including if necessary motivated offers on its completion.
27. The Ministry of Energy of the Russian Federation within 5 working days from the date of receipt of the notes and (or) conclusions on the project of investing program provided by Items 22, of 23 and 26 these rules directs the specified materials with use of the official site systems to the subject of power industry on condition of their receipt in installed by these rules terms.
The Ministry of Energy of the Russian Federation in time no later than 35 calendar days (20 calendar days - for the cases provided by the paragraph the second Item 67 of these rules; 10 calendar days - for case, stipulated in Item 69 these rules) from the date of placement of the notification on acceptance to consideration of the project of investing program send with use of the official site of system to the subject of power industry the notes to the project of investing program prepared taking into account consideration of the conclusions on the project of investing program provided by Items 23 - 26 these rules.
28. Subjects of power industry, except for the network organizations, no later than 65 calendar days (35 calendar days - for the cases provided by the paragraph the second Item 67 of these rules) from the date of placement by the Ministry of Energy of the Russian Federation of the notification on acceptance to consideration of the project of investing program place according to standards of disclosure of information the modifed project of investing program taking into account the these rules of notes of Federal Antimonopoly Service, State Atomic Energy Corporation "Rosatom", the supreme executive bodies of the government of the subjects of the Russian Federation specified in the subitem "d" of Item 18 of these rules, and (or) the Ministry of Energy of the Russian Federation provided by Items 22 and 27.
The specified subjects of power industry along with placement on the official site of system of the modifed project of investing program send with use of the official site of system to the Ministry of Energy of the Russian Federation the notification containing specifying for date and the location on the official site of system (the complete e-mail address) of the specified information (further - the notification on modifed investing program).
Together with the notification on modifed investing program the information specified in Item 13 of these rules, finished according to the specified notes of executive bodies and the organizations, and the explanatory note containing information on accounting in the modifed project of investing program of the specified notes and stipulated in Item 23 these rules of offers of the interested federal executive bodies or about motivated refusal of accounting of such notes and offers goes.
29. The network organizations no later than 85 calendar days (35 calendar days - for the cases provided by the paragraph the second Item 67 of these rules; 20 calendar days - for case, stipulated in Item 69 these rules) from the date of placement by the Ministry of Energy of the Russian Federation of the notification on acceptance to consideration of the project of investing program place according to standards of disclosure of information the modifed project of investing program taking into account the these rules of notes of Federal Antimonopoly Service, State Atomic Energy Corporation "Rosatom", the supreme executive bodies of the government of the subjects of the Russian Federation specified in the subitem "d" of Item 18 of these rules, and (or) the Ministry of Energy of the Russian Federation, the explanatory note containing information on accounting in the modifed project of investing program of offers of Advisory council and council of consumers on completion of the project of investing program or about motivated refusal of their accounting provided by Items 22 and 27 and also in the presence - the conclusion by results of carrying out technological and price audit of the modifed project of investing program.
The network organizations along with placement on the official site of system of the modifed project of investing program send with use of the official site of system to the Ministry of Energy of the Russian Federation the notification on modifed investing program.
Together with the notification on modifed investing program the explanatory note containing information on accounting in the modifed project of investing program of the specified notes and stipulated in Item 23 these rules of offers of the interested federal executive bodies or about motivated refusal of accounting of such notes and offers goes.
30. The Ministry of Energy of the Russian Federation no later than 5 working days from the date of receipt of the notification on modifed investing program directs with use of the official site of system to the subject of power industry motivated refusal in consideration of such notification and modifed project of investing program with indication of the notes having exhaustive character in cases:
placements of information on the modifed project of investing program on the official site of system not in full or not in the established form;
representations with use of the official site of system of the materials attached to the notification on modifed investing program specified in Items 28 or 29 of these rules, not in full and (or) not in the established form.
The subject of power industry repeatedly sends with use of the official site of system to the Ministry of Energy of the Russian Federation the notification on modifed investing program and the materials attached to it no later than day of disclosure of information on the modifed project of investing program after elimination of notes of the Ministry of Energy of the Russian Federation, but no later than 5 working days from the date of the direction the Ministry of Energy of the Russian Federation of such notes to the subject of power industry with use of the official site of system.
The Ministry of Energy of the Russian Federation within 5 working days from the date of receipt with use of the official site of system of the notification on modifed investing program and the materials attached to it posts on the official site of system the notification on acceptance to consideration of the modifed project of investing program, and also sends such notification with use of the official site of system to the subject of power industry.
The Ministry of Energy of the Russian Federation along with placement on the official site of system of the notification on acceptance to consideration of the modifed project of investing program sends such notification, and also the materials which arrived in the Ministry of Energy of the Russian Federation attached to the notification on modifed investing program with use of single system of interdepartmental electronic interaction to the bodies and the organizations specified in Item 18 of these rules.
31. The Federal Antimonopoly Service, State Atomic Energy Corporation "Rosatom" and the supreme executive bodies of the government of subjects of the Russian Federation specified in the subitem "d" of Item 18 of these rules in time no later than 20 calendar days from the date of placement by the Ministry of Energy of the Russian Federation of the notification on acceptance to consideration of the modifed project of investing program send with use of single system of interdepartmental electronic interaction to the Ministry of Energy of the Russian Federation of the conclusion about approval of the modifed project of investing program or the exhaustive list of comments to it.
32. The interested federal executive bodies in time no later than 15 calendar days from the date of placement by the Ministry of Energy of the Russian Federation of the notification on acceptance to consideration of the modifed project of investing program send with use of single system of interdepartmental electronic interaction to the Ministry of Energy of the Russian Federation of the conclusion by results of consideration of the modifed project of investing program, including if necessary motivated offers on its completion.
33. The system operator and (or) the subject of supervisory control in case of receipt of the notification on acceptance to consideration of the modifed project of investing program, and also Market Council in time no later than 15 calendar days from the date of placement of such notification by the Ministry of Energy of the Russian Federation post on the official site systems of the conclusion by results of consideration of the modifed project of investing program, including if necessary motivated offers on its completion.
34. The advisory council and council of consumers in time no later than 15 calendar days from the date of placement by the Ministry of Energy of the Russian Federation of the notification on acceptance to consideration of the modifed project of investing program of the network organization post on the official site systems of the conclusion by results of consideration of the modifed project of investing program of the network organization, including if necessary motivated offers on its completion.
35. The Ministry of Energy of the Russian Federation within 5 working days from the date of receipt of the notes and (or) conclusions on the modifed project of investing program provided by Items 31 and 32 of these rules sends them with use of the official site of system to the subject of power industry on condition of receipt of the specified notes and (or) the conclusions to the terms established by these rules.
The Ministry of Energy of the Russian Federation in time no later than 25 calendar days (20 calendar days - for the cases provided by the paragraph the second Item 67 of these rules; 10 calendar days - for case, stipulated in Item 69 these rules) from the date of placement of the notification on acceptance to consideration of the modifed project of investing program send with use of the official site of system to the subject of power industry the notes to the modifed project of investing program prepared taking into account consideration of the conclusions by results of consideration of the modifed project of investing program provided by Items 32, of 33 and 34 these rules.
36. If after 30 calendar days from the date of placement by the Ministry of Energy of the Russian Federation of the notification on acceptance to consideration of the project of investing program or after 20 calendar days from the date of placement by the Ministry of Energy of the Russian Federation of the notification on acceptance to consideration of the modifed project of investing program information on line item of Federal Antimonopoly Service, State Atomic Energy Corporation "Rosatom" and (or) the supreme executive bodies of the government of the subjects of the Russian Federation specified in the subitem "d" of Item 18 of these rules on the project of investing program did not arrive in the Ministry of Energy of the Russian Federation, the project of investing program is considered approved with the specified executive bodies (organization).
37. Notes of the supreme executive bodies of the government of subjects of the Russian Federation to the modifed project of investing program, stipulated in Item 31 these rules, in time no later than 60 calendar days from the date of placement by the Ministry of Energy of the Russian Federation of the notification on acceptance to consideration of the modifed project of investing program are considered by the Ministry of Energy of the Russian Federation at meetings with participation of authorized representatives of the subject of power industry and the supreme executive bodies of the government of the subjects of the Russian Federation which provided the specified notes to the Ministry of Energy of the Russian Federation.
Decisions of the Ministry of Energy of the Russian Federation, including on completion of the project of investing program with indication of completion term, accepted concerning stipulated in Item 31 these rules of notes of the supreme executive bodies of the government of subjects of the Russian Federation to the modifed project of investing program, are reflected in protocols of the corresponding meetings.
The protocols of meetings provided by this Item are constituted by the Ministry of Energy of the Russian Federation in the form of electronic documents which are signed by the Minister of Energy of the Russian Federation (or on specifying of the Minister of Energy of the Russian Federation by his deputy) with use of the strengthened qualified digital signature and within 5 working days from the date of signing go with use of single system of interdepartmental electronic interaction to the supreme executive bodies of the government of subjects of the Russian Federation which provided the specified notes to the Ministry of Energy of the Russian Federation and also with use of the official site of system to the subject of power industry.
38. In the presence of 32 and 35 these rules of notes of the Ministry of Energy of the Russian Federation provided by Items 31,, Federal Antimonopoly Service, State Atomic Energy Corporation "Rosatom" and (or) offers of the interested federal executive bodies (further in this Section - disagreements on the project of investing program) the Ministry of Energy of the Russian Federation in time no later than 45 calendar days (25 calendar days - for the cases provided by the paragraph the second Item 67 of these rules; 15 calendar days - for case, stipulated in Item 69 these rules) from the date of placement by the Ministry of Energy of the Russian Federation of the notification on acceptance to consideration of the modifed project of investing program hold conciliatory meetings with participation of authorized representatives of the subject of power industry and the Federal Antimonopoly Service, State Atomic Energy Corporation "Rosatom" interested federal executive bodies, provided the specified notes and (or) offers to the Ministry of Energy of the Russian Federation.
In the protocol of conciliatory meeting the decisions made at conciliatory meeting concerning disagreements on the project of investing program, including not settled issues on the project of investing program, agreed decisions on completion of the project of investing program in the part concerning accounting of notes according to which issues on the project of investing program were settled with indication of the completion term, and also the offer of the Ministry of Energy of the Russian Federation on completion of the project of investing program in the part concerning accounting of notes according to which disagreements on the project of investing program remained not settled are reflected.
For the cases provided by the paragraph the second Item 67 and Item 69 of these rules in the protocol of conciliatory meeting the decisions of the Ministry of Energy of the Russian Federation made at conciliatory meeting on completion of the project of changes in investing program (adjustment of investing program) with indication of completion term are reflected.
Protocols of conciliatory meetings are constituted by the Ministry of Energy of the Russian Federation in the form of electronic documents which are signed by the Minister of Energy of the Russian Federation (or on specifying of the Minister of Energy of the Russian Federation by his deputy), and also the corresponding heads (or on specifying of heads by their deputies) federal executive bodies and (or) State Atomic Energy Corporation "Rosatom" with use of the strengthened qualified digital signature within 5 working days from the date of the direction with use of single system of interdepartmental electronic interaction in the corresponding federal executive body and (or) State Atomic Energy Corporation "Rosatom".
The Ministry of Energy of the Russian Federation sends with use of the official site of system to the subject of power industry protocols of conciliatory meetings after their signing, and in case of not receipt to the Ministry of Energy of the Russian Federation with use of single system of interdepartmental electronic interaction of the signed protocol of conciliatory meeting - after 5 working days from the date of its direction with use of single system of interdepartmental electronic interaction to the specified federal executive bodies and (or) State Atomic Energy Corporation "Rosatom" for signing.
39. In the presence of not settled issues on the project of investing program the Ministry of Energy of the Russian Federation sends to the Government of the Russian Federation the appeal about consideration on commission session of not settled issues on the project of investing program containing protocols of the corresponding conciliatory meetings, materials of disagreements on the project of investing program and information on the location on the official site of system (the complete e-mail address) of the project of investing program after signing of the specified protocols of conciliatory meetings, and in case of not receipt in the Ministry of Energy of the Russian Federation with use of single system of interdepartmental electronic interaction of the signed protocol of conciliatory meeting - after 5 working days from the date of its direction with use of single system of interdepartmental electronic interaction to the specified federal executive bodies (organization) for signing.
Along with the direction sends to the Government of the Russian Federation of the address provided by this Item, the Ministry of Energy of the Russian Federation with use of the official site of system to the subject of power industry the notification on availability of not settled issues on the project of investing program containing specifying for date of the direction in the Government of the Russian Federation of the specified address.
Not settled issues on the project of investing program are considered by the Commission within 20 calendar days from the date of receipt in the Government of the Russian Federation of the materials specified in this Item.
The decision of the Commission goes to the Ministry of Energy of the Russian Federation within 5 working days from the date of consideration by the Commission of not settled issues on the project of investing program.
The Ministry of Energy of the Russian Federation within 5 working days from the date of receipt of the decision of the Commission on results of consideration of the questions provided by this Item sends it with use of the official site of system to the subject of power industry.
40. In case of placement according to Item 29 of these rules by the network organization of the modifed project of investing program in which the offers posted on the official site of system during public discussion of the project of investing program, the offer of Advisory council and (or) council of consumers on completion of the project of investing program, posted on the official site of system according to these rules are not considered council of consumers has the right within 20 calendar days from the date of placement by the Ministry of Energy of the Russian Federation of the notification on acceptance to consideration of the modifed project of investing program of the network organization to send to the Commission the appeal about need of accounting of one or several specified offers in the project of investing program, materials according to such offers, the report of the offers which arrived during public discussion of the project of investing program posted by the network organization on the official site of system, the copy of offers of Advisory council and (or) council of the consumers on completion of the project of investing program posted on the official site of system for consideration by the Commission with participation of members of council of consumers and acceptances concerning the specified offers of the relevant decision.
Along with the direction of the specified address council of consumers posts the copy of such address on the official site of system, and also notifies on it the Ministry of Energy of the Russian Federation, the system operator, the subject of supervisory control and Market Council.
The system operator, the subject of supervisory control, Market Council within 10 calendar days from the date of receipt of the specified notification of council of consumers post on the official site systems the motivated line items according to the offers containing in the specified appeal of council of consumers and also notify on it the Ministry of Energy of the Russian Federation and council of consumers.
The appeal of council of consumers provided by this Item is considered by the Commission within 30 calendar days from the date of its obtaining on condition of receipt of the specified appeal of council of consumers to the terms established by this Item.
The decision of the Commission goes to the Ministry of Energy of the Russian Federation within 5 working days from the date of consideration by the Commission of the specified appeal of council of consumers.
The Ministry of Energy of the Russian Federation within 5 working days from the date of receipt of the specified decision of the Commission sends it with use of the official site of system to the subject of power industry, and also posts information on the specified decision of the Commission on the official site of system.
41. The subject of power industry posts on the official site systems according to standards of disclosure of information the final project of investing program finished according to the decisions of the Ministry of Energy of the Russian Federation and agreed decisions provided by Items 37 and 38 of these rules on completion of the project of investing program which contain in protocols of conciliatory meetings in the latest of the terms established by the specified decisions and (or) protocols of conciliatory meetings, and in case of absence in decisions of the Ministry of Energy of the Russian Federation and (or) protocols of conciliatory meetings of specific terms of placement by the subject of power industry of the final project of investing program - in time no later than 15 calendar days from the date of obtaining with use of the official site of system by the subject of power industry of the specified decisions and (or) protocols of conciliatory meetings.
In case of the direction the Ministry of Energy of the Russian Federation of the notification on availability of not settled issues on the project of investing program and (or) placement on the official site of system of the copy of the appeal of council of consumers, stipulated in Item 40 these rules, the subject of power industry posts on the official site systems according to standards of disclosure of information the final project of investing program finished according to the provided Items 37 - 40 these rules decisions of the Ministry of Energy of the Russian Federation, agreed decisions on completion of the project of investing program which contain in protocols of conciliatory meetings, and decisions of the Commission (on condition of receipt of such decisions by the subject of power industry till September 30 of year in which the application was directed to the Ministry of Energy of the Russian Federation) in the latest of the terms established by the specified decisions of the Commission and in case of absence in decisions of the Commission of specific terms of placement by the subject of power industry on the official site of system of the final project of investing program - in time no later than 15 calendar days from the date of obtaining with use of the official site of system by the subject of power industry of the specified decisions of the Commission.
In case of non receipt of the decisions of the Commission provided by this Section till September 30 of year in which the application was directed to the Ministry of Energy of the Russian Federation the subject of power industry in time no later than October 15 of the specified year posts on the official site systems according to standards of disclosure of information the final project of investing program finished according to the decisions and offers of the Ministry of Energy of the Russian Federation and agreed decisions provided by Items 37 and 38 of these rules on completion of the project of investing program which contain in protocols of conciliatory meetings and also places the project of changes in such investing program (adjustment of investing program) according to Item 70 of these rules.
The subject of power industry along with placement on the official site of system of the final project of investing program sends with use of the official site of system to the Ministry of Energy of the Russian Federation the notification containing specifying for date and the location on the official site of system (the complete e-mail address) of the final project of investing program.
42. The Ministry of Energy of the Russian Federation directs with use of the official site of system to the subject of power industry motivated refusal in approval of investing program, and also sends with use of single system of interdepartmental electronic interaction the adequate notice to the bodies and the organizations specified in Item 18 of these rules in case of not receipt of the notification on placement according to standards of disclosure of information of the modifed project of investing program or the final project of investing program within 10 calendar days from the date of the expiration of the terms specified respectively in Items 28, of 29, of 30 and 41 these rules.
43. The Ministry of Energy of the Russian Federation approves investing program taking into account results of control of realization of investing programs in previous periods (in case of realization of investing programs in previous periods) in the presence of the corresponding approvals and lack of the offers on completion of the project of investing program provided by Items 23, of 25 and 32 these rules till November 1 of the year preceding the period of realization of investing program, and in the cases provided by Items 37 - 40 these rules, - within 15 working days after placement by the subject of power industry on the official site of system of the final project of investing program according to Item 41 of these rules.
The Ministry of Energy of the Russian Federation approves investing program in the presence of the conclusions (reports) by results of carrying out technological and price audit in cases when receipt of such conclusions (reports) according to the Federal Laws, acts of the President of the Russian Federation and the Government of the Russian Federation is obligatory.
44. The decision on approval of investing program shall contain:
a) lists of investment projects with indication of their purposes, all-in cost, terms of realization and the amount of financing by years (including the amount of financing at the expense of the investment resources included in regulated by the state of the price (rates), and also at the expense of means of budgets of budget system of the Russian Federation) according to each investment project;
b) planned targets of realization of investing program;
c) for the network organizations - the plan of commissioning of fixed assets in natural and value term, including concerning the 1st year of realization of investing program with quarterly breakdown.
45. The Ministry of Energy of the Russian Federation posts on the official site of system the decision on approval of investing program no later than 5 working days from the date of its acceptance in the form approved by the Ministry of Energy of the Russian Federation in coordination with the Ministry of Economic Development of the Russian Federation and Federal Antimonopoly Service.
Along with placement on the official site of system of the decision on approval of investing program the Ministry of Energy of the Russian Federation sends the adequate notice to the subject of power industry with use of the official site of system.
III. Approval procedure of investing program authorized body of the executive authority of the subject of the Russian Federation
46. The bodies and the organizations specified in Item 19 of these rules consider the project of investing program within the powers established by the legislation of the Russian Federation:
a) executive body of the subject of the Russian Federation in the field of state regulation of the prices (rates) - regarding assessment of proposals of subjects of power industry on inclusion of the investment resources necessary for realization of investing program, in the prices (rates) regulated by the specified executive body of the subject of the Russian Federation in the field of state regulation of the prices (rates), and assessment of conformity of projects of investing programs of the network organizations, except for the organizations for management of single national (all-Russian) power network, to target measure values of reliability and service quality established by the specified executive body of the subject of the Russian Federation in the field of state regulation of the prices (rates) for the purposes of forming of investing programs of such network organizations;
b) The Ministry of Energy of the Russian Federation - regarding investment projects on construction and (or) reconstruction of the power lines and (or) transformer and other substations corresponding to the criteria of reference of objects of electric grid economy to single national (all-Russian) power network approved by the Government of the Russian Federation;
c) the system operator - regarding providing assessment:
steady perspective working hours of Power pool system of Russia, including taking into account investment projects on construction (to reconstruction, upgrade, modernization and (or) dismantle) power generation facilities, to creation of devices (complexes) of relay protection and automatic equipment, systems of telemechanics and communication and terms of implementation of such projects;
the coordinated commissioning and conclusion from operation of the generating objects and objects of electric grid economy;
accomplishment of the scheme and development program of Power pool system of Russia and schemes and development programs of power industry of subjects of the Russian Federation;
elimination or decrease in technological restrictions for the greatest possible overflows of electrical energy between zones of free overflow in price zones of the wholesale market of electrical energy and capacity;
d) subjects of supervisory control - regarding providing assessment:
steady perspective working hours of the relevant technologically isolated territorial electric utility systems, including taking into account investment projects on construction (reconstruction, upgrade, modernization and (or) dismantle) of power generation facilities, creation of devices (complexes) of relay protection and automatic equipment, systems of telemechanics and communication and terms of implementation of such projects;
the coordinated commissioning and conclusion from operation of the generating objects and objects of electric grid economy;
accomplishment of schemes and development programs of power industry of subjects of the Russian Federation;
e) cross-industry council of consumers - regarding assessment of feasibility and justification of application of technology and cost solutions of the investment projects provided by the project of investing program, assessment of achievement of the performance indicators of the project of investing program declared by the subject of power industry including on the basis of results of technological and price audit of investing programs and investment projects (with such results).
47. Investing programs affirm authorized bodies of the executive authority of subjects of the Russian Federation regarding the investment projects realized in the territory of appropriate subjects of the Russian Federation.
48. If during consideration of the project of investing program there is need of refining of the specified project or information enclosed to the application the authorized body of the executive authority of the subject of the Russian Federation requests additional materials with use of the official site of system, having specified form of their representation and the requirement to them, and the subject of power industry represents the specified materials signed with use of the strengthened qualified digital signature by means of the official site of system within 7 calendar days from the date of receipt of request.
49. The Ministry of Energy of the Russian Federation and executive body of the subject of the Russian Federation in the field of state regulation of the prices (rates) in time no later than 30 calendar days from the date of receipt of the notification on acceptance to consideration of the project of investing program submit within authorized body of the executive authority of the subject of the Russian Federation the conclusions by results of consideration of the project of investing program and in the presence of notes - the exhaustive list of such notes within the powers established by the legislation of the Russian Federation.
The executive body of the subject of the Russian Federation in the field of state regulation of the prices (rates) together with the conclusion by results of consideration of the project of investing program sends assessment to authorized body of the executive authority of the subject of the Russian Federation:
price (tariff) effects of accomplishment of the specified investing program for its realization;
compliance of the specified project of investing program to the values of target indicators of reliability and service quality established by executive body of appropriate subject of the Russian Federation in the field of state regulation of the prices (rates) for the purposes of forming of investing program.
50. The system operator and (or) the subject of supervisory control within 20 calendar days from the date of receipt of the notification on acceptance to consideration of the project of investing program post on the official site of system the conclusion by results of consideration of the project of investing program, including if necessary motivated notes on its completion.
Cross-industry council of consumers in time no later than 20 calendar days from the date of receipt of the notification on acceptance to consideration of the project of investing program of the network organization posts on the official site of system the conclusion by results of consideration of the project of investing program of the network organization, including if necessary motivated offers on its completion.
51. The authorized body of the executive authority of the subject of the Russian Federation within 5 working days from the date of receipt of notes and (or) conclusions by results of consideration of the project of investing program, stipulated in Item 49 these rules, sends them with use of the official site of system to the subject of power industry on condition of receipt of the specified notes and (or) the conclusions to the terms established by these rules.
Authorized body of the executive authority of the subject of the Russian Federation in time no later than 35 calendar days (20 calendar days - for the cases provided by the paragraph the second Item 67 of these rules; 10 calendar days - for case, stipulated in Item 69 these rules) from the date of placement of the notification on acceptance to consideration of the project of investing program send with use of the official site of system to the subject of power industry the notes to the project of investing program prepared taking into account consideration of the conclusions on the project of investing program provided by Items 49 and 50 of these rules.
52. Subjects of power industry, except for the network organizations, in time no later than 65 calendar days (35 calendar days - for the cases provided by the paragraph the second Item 67 of these rules) from the date of placement of the executive authority of the subject of the Russian Federation by authorized body of the notification on acceptance to consideration of the project of investing program place according to standards of disclosure of information the modifed project of investing program taking into account provided by Items 49 - 51 these rules of notes of executive body of the subject of the Russian Federation in the field of state regulation of the prices (rates), the Ministry of Energy of the Russian Federation, the system operator, the subject of supervisory control and (or) authorized body of the executive authority of the subject of the Russian Federation.
The specified subjects of power industry along with placement on the official site of system of the modifed project of investing program send with use of the official site of system to authorized body of the executive authority of the subject of the Russian Federation the notification on modifed investing program.
Together with the notification on modifed investing program the information specified in Item 13 of these rules, finished taking into account notes of the specified executive bodies and the organizations and the explanatory note containing information on accounting in the modifed project of investing program of the specified notes or on motivated refusal of accounting of such notes goes.
53. The network organizations in time no later than 85 calendar days (35 calendar days - for the cases provided by the paragraph the second Item 67 of these rules; 20 calendar days - for case, stipulated in Item 69 these rules) from the date of placement of the executive authority of the subject of the Russian Federation by authorized body of the notification on acceptance to consideration of the project of investing program place according to standards of disclosure of information the modifed project of investing program taking into account provided by Items 49 - 51 these rules of notes of executive body of the subject of the Russian Federation in the field of state regulation of the prices (rates), the Ministry of Energy of the Russian Federation, the system operator, the subject of supervisory control and (or) authorized body of the executive authority of the subject of the Russian Federation, the explanatory note containing information on accounting of offers of cross-industry council of consumers on completion of the project of investing program or on motivated refusal of their accounting and also in the presence - the conclusion by results of carrying out technological and price audit of the modifed project of investing program.
The network organizations along with placement on the official site of system of the modifed project of investing program send with use of the official site of system to authorized body of the executive authority of the subject of the Russian Federation the notification on modifed investing program.
Together with the notification on modifed investing program the explanatory note containing information on accounting in the modifed project of investing program of the specified notes or on motivated refusal of accounting of such notes goes.
54. The authorized body of the executive authority of the subject of the Russian Federation no later than 5 working days from the date of receipt of the notification on modifed investing program directs with use of the official site of system to the subject of power industry motivated refusal in consideration of such notification and modifed project of investing program with indication of the notes having exhaustive character in cases:
placements of information on the modifed project of investing program on the official site of system not in full or not in the established form;
representations with use of the official site of system of the materials attached to the notification on modifed investing program specified in Items 52 or 53 of these rules, not in full and (or) not in the established form.
The subject of power industry repeatedly sends with use of the official site of system to authorized body of the executive authority of the subject of the Russian Federation the notification on modifed investing program and the materials attached to it no later than day of disclosure of information on the modifed project of investing program after elimination of notes of authorized body of the executive authority of the subject of the Russian Federation, but no later than 5 working days from the date of the direction authorized body of the executive authority of the subject of the Russian Federation of such notes to the subject of power industry with use of the official site of system.
The authorized body of the executive authority of the subject of the Russian Federation within 5 working days from the date of receipt with use of the official site of system of the notification on modifed investing program and the materials attached to it posts on the official site of system the notification on acceptance to consideration of the modifed project of investing program, and also sends such notification with use of the official site of system to the subject of power industry.
The authorized body of the executive authority of the subject of the Russian Federation along with placement on the official site of system of the notification on acceptance to consideration of the modifed project of investing program directs such notification, and also the materials which arrived in authorized body of the executive authority of the subject of the Russian Federation attached to the notification on modifed investing program, the bodies and the organizations specified in Item 19 of these rules.
55. The executive body of the subject of the Russian Federation in the field of state regulation of the prices (rates), the Ministry of Energy of the Russian Federation in time no later than 20 calendar days from the date of receipt of the notification on acceptance to consideration of the modifed project of investing program is posted on the official site by systems of the conclusion by results of consideration of the modifed project of investing program and in the presence of notes - the exhaustive list of such notes.
The system operator and (or) the subject of supervisory control in time no later than 15 calendar days from the date of receipt of the notification on acceptance to consideration of the modifed project of investing program post on the official site systems of the conclusion by results of consideration of the modifed project of investing program, including if necessary motivated notes on its completion.
56. Cross-industry council of consumers in time no later than 15 calendar days from the date of receipt of the notification on acceptance to consideration of the modifed project of investing program posts on the official site of system the conclusion by results of consideration of the modifed project of investing program of the network organization, including if necessary motivated offers on its completion.
57. The authorized body of the executive authority of the subject of the Russian Federation within 5 working days from the date of receipt of notes and (or) conclusions on the modifed project of investing program, stipulated in Item 55 these rules, directs the specified materials with use of the official site systems to the subject of power industry on condition of their receipt in installed by these rules terms.
Authorized body of the executive authority of the subject of the Russian Federation in time no later than 25 calendar days (20 calendar days - for the cases provided by the paragraph the second Item 67 of these rules; 10 calendar days - for case, stipulated in Item 69 these rules) from the date of placement of the notification on acceptance to consideration of the modifed project of investing program send with use of the official site of system to the subject of power industry the notes to the modifed project of investing program prepared taking into account consideration of the conclusions by results of consideration of the modifed project of investing program provided by Items 55 and 56 of these rules.
58. In the presence of notes of the Ministry of Energy of the Russian Federation, stipulated in Item 55 these rules, the Ministry of Energy of the Russian Federation in time no later than 60 calendar days from the date of receipt of the notification on acceptance to consideration of the modifed project of investing program holds conciliatory meeting with participation of authorized representatives of the subject of power industry and authorized body of the executive authority of the subject of the Russian Federation, and also authorized representatives of other bodies and the organizations specified in Item 19 of these rules to which field of activity the notes considered at meeting which can be invited by the Ministry of Energy of the Russian Federation to participation in the specified meeting belong.
In the protocol of conciliatory meeting the decisions made at conciliatory meeting concerning notes of the Ministry of Energy of the Russian Federation on the project of investing program, including not settled issues on the project of investing program, agreed decisions on completion of the project of investing program in the part concerning accounting of notes according to which issues were settled with indication of the completion term, and also the offer of the Ministry of Energy of the Russian Federation on completion of the project of investing program in the part concerning accounting of notes according to which disagreements on the project of investing program remained not settled are reflected.
The protocol of the conciliatory meeting provided by this Item is constituted by the Ministry of Energy of the Russian Federation and signed by the Minister of Energy of the Russian Federation (or on specifying of the Minister of Energy of the Russian Federation by his deputy), and also the head (or on specifying of the head by his deputy) authorized body of the executive authority of the subject of the Russian Federation within 5 working days from the date of receipt of such protocol of conciliatory meeting in the specified executive body.
The authorized body of the executive authority of the subject of the Russian Federation sends with use of the official site of system to the subject of power industry the protocol of conciliatory meeting with the Ministry of Energy of the Russian Federation after its signing.
59. In the presence of the these rules of notes of authorized body of the executive authority of the subject of the Russian Federation, executive body of the subject of the Russian Federation provided by Items 55 and 57 in the field of state regulation of the prices (rates), the system operator and (or) the subject of supervisory control (further in this Section - disagreements on the project of investing program) authorized body of the executive authority of the subject of the Russian Federation in time no later than 45 calendar days (25 calendar days - for the cases provided by the paragraph the second Item 67 of these rules; 15 calendar days - for case, stipulated in Item 69 these rules) from the date of placement of the notification on acceptance to consideration of the modifed project of investing program hold conciliatory meetings with participation of authorized representatives of the subject of power industry and executive body of the subject of the Russian Federation in the field of state regulation of the prices (rates), the system operator and (or) the subject of supervisory control who provided the specified notes to authorized body of the executive authority of the subject of the Russian Federation.
In the protocol of conciliatory meeting the decisions made at conciliatory meeting concerning disagreements on the project of investing program, including not settled issues on the project of investing program, agreed decisions on completion of the project of investing program in the part concerning accounting of notes according to which issues on the project of investing program were settled with indication of the completion term, and also the offer of authorized body of the executive authority of the subject of the Russian Federation on completion of the project of investing program in the part concerning accounting of notes according to which disagreements on the project of investing program remained not settled are reflected.
For the cases provided by the paragraph the second Item 67 and Item 69 of these rules in the protocol of conciliatory meeting the decisions of authorized body of the executive authority of the subject of the Russian Federation made at conciliatory meeting on completion of the project of changes in investing program (adjustment of investing program) with indication of completion term are reflected.
Protocols of conciliatory meetings are constituted by authorized body of the executive authority of the subject of the Russian Federation and signed by the head of authorized body of the executive authority of the subject of the Russian Federation (or on specifying of the head by his deputy), and also the head (or on specifying of the head by his deputy) relevant organ of the executive authority (organizations) within 5 working days from the date of receipt of such protocol of conciliatory meeting in relevant organ of the executive authority (organization).
The authorized body of the executive authority of the subject of the Russian Federation sends with use of the official site of system to the subject of power industry protocols of conciliatory meetings after their signing, and in case of not receipt to authorized body of the executive authority of the subject of the Russian Federation of the signed protocol of conciliatory meeting - after 5 working days from the date of its receipt in relevant organ of the executive authority (organization) for signing.
60. In the presence of not settled issues on the project of investing program provided by Items 58 and 59 of these rules, the authorized body of the executive authority of the subject of the Russian Federation sends to the supreme executive body of the government of the subject of the Russian Federation the address about consideration of not settled issues on the project of investing program containing protocols of the corresponding conciliatory meetings, materials of disagreements on the project of investing program and information on the location on the official site of system (the complete e-mail address) of the project of investing program after signing of protocols of conciliatory meetings, and in case of not receipt in authorized body of the executive authority of the subject of the Russian Federation of the signed protocol of conciliatory meeting - after 5 working days from the date of its receipt in relevant organ of the executive authority (organization) for signing.
Along with the direction sends to the supreme executive body of the government of the subject of the Russian Federation of the address provided by this Item, authorized body of the executive authority of the subject of the Russian Federation with use of the official site of system to the subject of power industry the notification on availability of not settled issues on the project of investing program containing specifying for date of the direction in the supreme executive body of the government of the subject of the Russian Federation of the specified address.
Not settled issues on the project of investing program are considered by the supreme executive body of the government of the subject of the Russian Federation within 20 calendar days from the date of receipt in the supreme executive body of the government of the subject of the Russian Federation of the materials specified in this Item.
The decision of the supreme executive body of the government of the subject of the Russian Federation goes to authorized body of the executive authority of the subject of the Russian Federation within 5 working days from the date of consideration by the supreme executive body of the government of the subject of the Russian Federation of not settled issues on the project of investing program.
The authorized body of the executive authority of the subject of the Russian Federation within 5 working days from the date of receipt of the decision of the supreme executive body of the government of the subject of the Russian Federation by results of consideration of the questions provided by this Item sends it with use of the official site of system to the subject of power industry.
61. In case of placement of the modifed project of investing program by the network organization, in which the offers posted on the official site of system during public discussion of the project of investing program and (or) the offers of cross-industry council of consumers on completion of the project of investing program posted on the official site of system according to these rules are not considered, cross-industry council of consumers has the right within 20 calendar days from the date of placement of the executive authority of the subject of the Russian Federation by authorized body of the notification on acceptance to consideration of the modifed project of investing program of the network organization to send to the supreme executive body of the government of appropriate subject of the Russian Federation the address about need of accounting of one or several specified offers, materials according to the specified offers, the report of offers, arrived during public discussion of the project of investing program, posted by the network organization on the official site of system, and (or) the copy of offers of cross-industry council of the consumers on completion of the project of investing program posted on the official site of system for consideration of the government of the subject of the Russian Federation by the supreme executive body with participation of members of cross-industry council of consumers and acceptances concerning the specified offers of the relevant decision.
Along with the direction of the specified address cross-industry council of consumers posts the copy of such address on the official site of system, and also notifies on it authorized body of the executive authority of the subject of the Russian Federation, the system operator and subject of supervisory control.
The system operator, the subject of supervisory control within 10 calendar days from the date of receipt of the specified notification of cross-industry council of consumers post on the official site of system the motivated line item according to the offers containing in the specified appeal of cross-industry council of consumers and also notify on it authorized body of the executive authority of the subject of the Russian Federation and cross-industry council of consumers.
The appeal of cross-industry council of consumers provided by this Item is considered by the supreme executive body of the government of the subject of the Russian Federation within 30 calendar days from the date of its obtaining on condition of receipt of the specified address to the terms established by this Item.
The decision of the supreme executive body of the government of the subject of the Russian Federation goes to authorized body of the executive authority of the subject of the Russian Federation within 5 working days from the date of consideration by the supreme executive body of the government of the subject of the Russian Federation of the specified appeal of cross-industry council of consumers.
The authorized body of the executive authority of the subject of the Russian Federation within 5 working days from the date of receipt of the specified decision of the supreme executive body of the government of the subject of the Russian Federation sends it with use of the official site of system to the subject of power industry, and also posts information on the specified decision of the supreme executive body of the government of the subject of the Russian Federation on the official site of system.
62. The subject of power industry posts on the official site systems according to standards of disclosure of information the final project of investing program finished according to the agreed decisions provided by Items 58 and 59 of these rules (decisions of authorized body of the executive authority of the subject of the Russian Federation - for the cases provided by the paragraph the second Item 67 and Item 69 of these rules) on completion of the project of investing program which contain in protocols of conciliatory meetings, in the latest of the terms established by the specified protocols of conciliatory meetings, and in case of absence in protocols of conciliatory meetings of specific terms of placement by the subject of power industry of the final project of investing program - in time no later than 15 calendar days from the date of obtaining with use of the official site of system by the subject of power industry of the specified protocols of conciliatory meetings.
In case of the direction authorized body of the executive authority of the subject of the Russian Federation of the notification on availability of not settled issues on the project of investing program and (or) placement on the official site of system of the copy of the appeal of cross-industry council of consumers, stipulated in Item 61 these rules, the subject of power industry posts on the official site systems according to standards of disclosure of information the final project of investing program finished according to the provided Items 58 - 61 these rules agreed decisions on completion of the project of investing program which contain in protocols of conciliatory meetings, and decisions of the supreme executive body of the government of the subject of the Russian Federation (on condition of receipt of such decisions by the subject of power industry till September 30 of year, in which the application was directed to authorized body of the executive authority of the subject of the Russian Federation) in the latest of the terms established by the specified decisions of the supreme executive body of the government of the subject of the Russian Federation, and in case of absence in decisions of the supreme executive body of the government of the subject of the Russian Federation of specific terms of placement by the subject of power industry on the official site of system of the final project of investing program - in time no later than 15 calendar days from the date of obtaining with use of the official site of system by the subject of power industry of the specified decisions of the supreme executive body of the government of the subject of the Russian Federation.
In case of non receipt of the decisions of the supreme executive body of the government of the subject of the Russian Federation provided by this Section till September 30 of year in which the application was directed to authorized body of the executive authority of the subject of the Russian Federation the subject of power industry in time no later than October 15 of the specified year posts on the official site systems according to standards of disclosure of information the final project of investing program finished according to the offers of the Ministry of Energy of the Russian Federation and authorized body of the executive authority of the subject of the Russian Federation, agreed decisions on completion of the project of investing program provided by Items 58 and 59 of these rules which contain in protocols of conciliatory meetings and also places the project of changes in such investing program (adjustment of investing program) according to Item 70 of these rules.
The subject of power industry along with placement on the official site of system of the final project of investing program sends with use of the official site of system to authorized body of the executive authority of the subject of the Russian Federation the notification containing specifying for date and the location on the official site of system (the complete e-mail address) of the final project of investing program.
63. The authorized body of the executive authority of the subject of the Russian Federation directs with use of the official site of system to the subject of power industry motivated refusal in approval of investing program, and also sends the adequate notice to the bodies and the organizations specified in Item 19 of these rules in case of not receipt of the notification on placement according to standards of disclosure of information of the modifed project of investing program or the final project of investing program within 10 calendar days from the date of the expiration of the terms specified in Items 52, of 53, of 54 and 62 these rules.
64. The authorized body of the executive authority of the subject of the Russian Federation approves investing program taking into account results of control of realization of investing programs in previous periods (in case of realization of investing programs in previous periods) in the absence of the notes and offers to the project of investing program provided by Items 49, of 50 and 55 these rules till November 1 of the year preceding the period of realization of investing program, and in the cases provided by Items 58 - 61 these rules, - within 15 working days after placement by the subject of power industry on the official site of system of the final project of investing program according to Item 62 of these rules.
The authorized body of the executive authority of the subject of the Russian Federation approves investing program in the presence of the conclusions (reports) by results of carrying out technological and price audit in cases when receipt of such conclusions (reports) according to the Federal Laws, acts of the President of the Russian Federation and the Government of the Russian Federation is obligatory.
65. The decision of authorized body of the executive authority of the subject of the Russian Federation on approval of investing program shall contain:
a) lists of investment projects with indication of their purposes, all-in cost, terms of realization and the amount of financing by years (including the amount of financing at the expense of the investment resources included in regulated by the state of the price (rates), and also at the expense of means of budgets of budget system of the Russian Federation) according to each investment project;
b) planned targets of realization of investing program;
c) for the network organizations - the plan of commissioning of fixed assets in natural and value term, including concerning the 1st year of realization of investing program with quarterly breakdown.
66. The authorized body of the executive authority of the subject of the Russian Federation posts on the official site of system the decision on approval of investing program no later than 5 working days from the date of its acceptance in the form approved by the Ministry of Energy of the Russian Federation in coordination with the Ministry of Economic Development of the Russian Federation and Federal Antimonopoly Service.
Along with placement on the official site of system of the decision on approval of investing program the authorized body of the executive authority of the subject of the Russian Federation sends the adequate notice to the subject of power industry with use of the official site of system.
IV. Procedure for modification of the approved investing program
67. In case of need modification of investing program (adjustment of investing program) the specified changes are subject to approval by the executive body which earlier approved the appropriate investing program. Approval of changes in investing program is performed according to the procedure and terms which are established by these rules for approval of the investing programs, except as specified, provided by the paragraph the second this Item.
The changes in investing program (adjustment of investing program) made to execution of the Federal Laws (the laws of subjects of the Russian Federation), decisions of the Commission (the supreme executive bodies of the government of the subjects of the Russian Federation) provided by these rules and also the changes in investing program (adjustment of investing program) made in case of need elimination of effects of emergency or its prevention affirm the Ministry of Energy of the Russian Federation (authorized body of the executive authority of the subject of the Russian Federation) without carrying out public discussion of such changes, without carrying out technological and price audit and without approval of the executive bodies and the organizations specified in Items 18 or 19 of these rules.
68. Year of the beginning of realization of investing program is not subject to change.
For the purposes of prolongation of effective period of the long-term period of regulation concerning subject of power industry which state regulation of the prices (rates) for products (services) is performed on the basis of long-term parameters of regulation in case of modification of investing program (adjustment of investing program) the period of realization of such investing program can be extended for the term corresponding to the planned duration of effective period of prolongation of the long-term period of regulation.
69. If the investing program of the network organization is approved according to these rules before document approval of territorial planning and provides creation of objects of federal importance, objects of regional value, the objects of local value which are subject to display in documents of territorial planning, but are not provided by the specified documents of territorial planning, the network organization no later than 15 calendar days from the date of official publication of the decision of authorized body of the government on approval of the relevant document of territorial planning posts on the official site systems according to standards of disclosure of information the project of changes in such investing program (adjustment of investing program) providing exception of the specified objects and directs the application to the executive body which earlier approved the appropriate investing program.
The changes in investing program (adjustment of investing program) of the network organization provided by this Item affirm without carrying out public discussion of such changes, and also without approvals of the executive bodies and the organizations specified in Items 18 or 19 of these rules, in time, established by the legislation on town-planning activities.
70. If the Ministry of Energy of the Russian Federation (authorized body of the executive authority of the subject of the Russian Federation) approves investing program by which preparation of the final project in the cases provided by these rules the decision of the Commission (the supreme executive body of the government of the subject of the Russian Federation) was not considered, the subject of power industry posts on the official site systems according to standards of disclosure of information the project of changes in such investing program (adjustment of investing program) prepared according to the specified decision of the Commission (the supreme executive body of the government of the subject of the Russian Federation), in time, established by such decision of the Commission (the supreme executive body of the government of the subject of the Russian Federation) and in case of absence in the decision of the Commission (the supreme executive body of the government of the subject of the Russian Federation) of the specific term of placement by the subject of power industry on the official site of system of the project of investing program - in time no later than 15 calendar days from the date of receipt of such decision of the Commission by the subject of power industry (the supreme executive body of the government of the subject of the Russian Federation), but not earlier than day of obtaining with use of the official site of system of the notification of the Ministry of Energy of the Russian Federation (authorized body of the executive authority of the subject of the Russian Federation) on placement on the official site of system of the decision on approval of investing program.
The subject of power industry no later than day of placement on the official site of system of the specified project of changes in investing program (adjustment of investing program) directs the application to the Ministry of Energy of the Russian Federation (authorized body of the executive authority of the subject of the Russian Federation).";
d) in Rules of control of realization of investing programs of the subjects of power industry approved by the specified resolution:
state Item 3 in the following edition:
"3. Control of realization of investing programs of the generation companies created by results of trade in capacity and also the investing programs providing implementation of investment projects, providing issue of capacity of the generating objects determined by results of trade in capacity performs the Ministry of Energy of the Russian Federation.";
in Item 5:
in paragraph one of the word "and organizations" shall be replaced with words ", the organizations, the council of consumers formed under Government Commission on Electricity Generation and Advisory council under the Government of the Russian Federation";
in paragraph three of the word "and organizations" shall be replaced with words ", the organizations, and also the cross-industry councils of consumers formed under the supreme executive bodies of the government of appropriate subjects of the Russian Federation";
Items 6 - 8 to state in the following edition:
"6. Control of realization of investing programs is exercised in shape:
a) the analysis of the conclusions (reports) on carrying out technological and price audit of reports on realization of investing programs and (or) investment projects (in case of their availability);
b) the analysis of reports on realization of investing programs, including about use of the means provided in quality of sources of financing of investing programs;
c) the analysis of reports on the conducted procurements of goods, works and services for the purposes of implementation of investment projects;
d) carrying out scheduled and unscheduled inspections;
e) analysis of execution:
the instructions issued according to Item 16 of these rules;
decisions of Government Commission on Electricity Generation and (or) the supreme executive bodies of the government of the subjects of the Russian Federation provided by the Rules of approval of investing programs of subjects of power industry approved by the order of the Government of the Russian Federation of December 1, 2009 No. 977 "About investing programs of subjects of power industry".
7. The control of realization of investing programs exercised in the form of scheduled and unscheduled inspections includes:
a) control:
behind construction terms (reconstruction, upgrades, modernization) power generation facilities;
behind forming of construction cost (reconstruction, upgrade, modernization, acquisition) power generation facilities, including the analysis of financing and development of capital investments according to investment projects, the project documentation, source accounting documents, executive documentation, contractual relations, procedure for pricing, the purchasing activity performed by the subject of power industry for the purpose of construction (reconstruction, upgrade, modernization, acquisition) power generation facilities;
behind actual state of works on the platform of construction (reconstruction, upgrade, modernization) power generation facilities, including the analysis of allowing and title documentation, agreements of accession to networks of engineering facilities and their synchronization with the checked investment project, selective check of physical amounts, observance of requirements of technical regulations and readiness of objects for operation;
behind achievement of planned targets of realization of investing program;
b) implementation of the analysis of functioning of governing bodies of investment projects and services of the customer builder.
8. Subjects of power industry annually, till December 15, send with use of interactive forms of the official site of the federal state information system "Single Portal of the State and Municipal Services (Functions)" on the Internet (further respectively - Internet network, the official site of system) to the executive body which approved investing program, schedules of realization of the approved investing programs with indication of stages of the construction of facilities of power industry and information on the planned purchases of goods, works and services for the purposes of implementation of investment projects in electronic form signed with use of the strengthened qualified digital signature according to forms, rules of filling of the specified forms and requirements to their formats approved by the Ministry of Energy of the Russian Federation in coordination with the Ministry of Telecom and Mass Communications of the Russian Federation, and also to the system operator - in the part necessary for control of realization of investing programs of the generation companies created by results of trade in capacity.
The subjects of power industry realizing the investing programs providing implementation of the investment projects providing issue of capacity of the generating objects, determined by results of trade in capacity send the generation companies which investing programs are created by results of trade in capacity and annually, till December 15, with use of interactive forms of the official site of system to the Ministry of Energy of the Russian Federation of graphics of realization of the specified investing programs with indication of stages of the construction of facilities of power industry and information on the planned purchases of goods, works and services for the purposes of implementation of investment projects in electronic form signed with use of the strengthened qualified digital signature according to forms, rules of filling of the specified forms and requirements to their formats, approved by the Ministry of Energy of the Russian Federation in coordination with the Ministry of Telecom and Mass Communications of the Russian Federation, and also to the system operator - in the part necessary for control of realization of investing programs of the generation companies created by results of trade in capacity.";
the fifth Item 9 to add the paragraph with the words "annually, till December 1";
in Item 13:
in paragraph one:
exclude the words "and also in case";
add with words ", and also identifications of variations of the actual measure values of the investment project from their planned values provided by the approved investing program (including terms of realization, cost, financing and (or) development of capital investments, the main project decisions and structure of the capital equipment)";
to add paragraph two after the word "carrying out" with words "planned and";
state Item 16 in the following edition:
"16. Officials of the Ministry of Energy of the Russian Federation in case of identification by results of check of violations issue instructions about elimination of the revealed violations, including with indication of need of the appeal to the executive body authorized on approval of investing program of appropriate subject of power industry for modification of investing program.
The act of results of check and the instruction of elimination of the revealed violations within 5 working days after their creation go to the subject of power industry.";
in Item 17 to exclude the word "documentary";
state Items 18 and 19 in the following edition:
"18. Subjects of power industry (except for the network organizations) which investing programs approve the Ministry of Energy of the Russian Federation and (or) executive bodies of subjects of the Russian Federation, quarterly, not later than in 45 days after the termination of reporting quarter, send with use of interactive forms of the official site of system in electronic form signed with use of the strengthened qualified digital signature to the Ministry of Energy of the Russian Federation and (or) executive bodies of subjects of the Russian Federation reports on realization of investing programs for the last quarter according to forms, rules of filling of the specified forms and the requirements to their formats approved by the Ministry of Energy of the Russian Federation in coordination with the Ministry of Economic Development of the Russian Federation Ministry of Finance of the Russian Federation and Ministry of Telecom and Mass Communications of the Russian Federation.
The network organizations which investing programs approve the Ministry of Energy of the Russian Federation and (or) executive bodies of subjects of the Russian Federation, quarterly, not later than in 45 days after the termination of reporting quarter, post on the official site systems according to standards of disclosure of information by subjects wholesale and the retail markets of electrical energy, approved by the order of the Government of the Russian Federation of January 21, 2004 No. 24 "About approval of standards of disclosure of information by subjects wholesale and the retail markets of electrical energy" (further - standards of disclosure of information), reports on realization of investing programs for the last quarter. Such network organizations no later than the working day corresponding to day of disclosure of the specified information send with use of interactive forms of the official site of system to the Ministry of Energy of the Russian Federation and (or) executive bodies of subjects of the Russian Federation the notification containing specifying for date and the location on the official site of system (the exact e-mail address) of the specified information.
The network organizations no later than the working day corresponding to day of disclosure of information on reports on realization of investing programs for the last quarter send with use of interactive forms of the official site of system to the Ministry of Energy of the Russian Federation the notification on the place of publication (the exact e-mail address) of information on cost of the capital construction projects put into operation corresponding to prototype technology solutions of capital construction of power generation facilities concerning which the Ministry of Energy of the Russian Federation establishes the enlarged standard rates of the price.
The generation companies which investing programs are created by results of trade in capacity, and the subjects of power industry realizing the investing programs providing implementation of the investment projects providing issue of capacity of the generating objects, determined by results of trade in capacity, quarterly, not later than in 45 days after the termination of reporting quarter, send with use of interactive forms of the official site of system in electronic form signed with use of the strengthened qualified digital signature to the Ministry of Energy of the Russian Federation reports on realization of the specified investing programs for the last quarter according to forms, rules of filling of the specified forms and the requirements to their formats approved by the Ministry of Energy of the Russian Federation in coordination with the Ministry of Economic Development of the Russian Federation Ministry of Finance of the Russian Federation and Ministry of Telecom and Mass Communications of the Russian Federation.
19. Subjects of power industry (except for the network organizations) which investing programs approve the Ministry of Energy of the Russian Federation and (or) executive bodies of subjects of the Russian Federation, annually, till April 1, send with use of interactive forms of the official site of system in electronic form signed with use of the strengthened qualified digital signature to the Ministry of Energy of the Russian Federation and (or) executive bodies of subjects of the Russian Federation, and also to the bodies and the organizations participating in approval of the appropriate investing programs, reports on realization of investing programs for previous year according to forms, rules of filling of the specified forms and the requirements to their formats approved by the Ministry of Energy of the Russian Federation in coordination with the Ministry of Economic Development of the Russian Federation Ministry of Finance of the Russian Federation and Ministry of Telecom and Mass Communications of the Russian Federation.
The network organizations which investing programs approve the Ministry of Energy of the Russian Federation and (or) executive bodies of subjects of the Russian Federation, annually, till April 1 post on the official site systems according to standards of disclosure of information reports on realization of investing programs for previous year and no later than the working day corresponding to day of disclosure of the specified information send with use of interactive forms of the official site of system to the Ministry of Energy of the Russian Federation and (or) executive bodies of subjects of the Russian Federation, and also to the bodies and the organizations participating in approval of the appropriate investing programs, the notification containing specifying for date and the location on the official site of system (the exact e-mail address) of the specified information.
The generation companies which investing programs are created by results of trade in capacity and the subjects of power industry realizing the investing programs providing implementation of the investment projects providing issue of capacity of the generating objects, determined by results of trade in capacity, annually, till April 1, send with use of interactive forms of the official site of system in electronic form signed with use of the strengthened qualified digital signature to the Ministry of Energy of the Russian Federation reports on realization of the specified investing programs for previous year according to forms, rules of filling of the specified forms and the requirements to their formats approved by the Ministry of Energy of the Russian Federation in coordination with the Ministry of Economic Development of the Russian Federation Ministry of Finance of the Russian Federation and Ministry of Telecom and Mass Communications of the Russian Federation.";
add with Item 19 (1) the following content:
"19(1). In case of origin at the operator of the federal state information system "Single Portal of the State and Municipal Services (Functions)" (further - the operator) the technical, program malfunctions or other problems attracting impossibility of accomplishment with use of the official site of system of actions (placement of information, the implementation of information exchange) provided by these rules and (or) standards of disclosure of information, the operator within 24 hours from the moment of emergence of the specified malfunctions and (or) problems posts on the official site systems (in the presence of opportunity) and (or) on the official site of the operator in Internet network the corresponding announcement containing date and time of emergence of the specified malfunctions and (or) problems.
In case of lack of possibility of placement on the official site of system of information provided by these rules and (or) standards of disclosure of information owing to origin at the operator of technical, program malfunctions or other problems subjects of power industry, bodies and the organizations provide the specified information to the executive bodies authorized on control of realization of investing programs on electronic media of information in the terms established by these rules and (or) standards of disclosure of information.
The executive bodies authorized on control of realization of investing programs within 3 working days from the date of receipt of information specified in the paragraph the second this Item post it on the official sites of the specified executive bodies in Internet network if the operator placed the announcement provided by paragraph one of this Item.
In case of lack of possibility of implementation with use of the official site of system of the information exchange provided by these rules owing to origin at the operator of technical, program malfunctions or other problems such information exchange is performed by the direction of adequate notices, documents and data in the form of the electronic documents signed with use of the strengthened qualified digital signature, to the receivers specified in these rules in the terms established by these rules.
The operator within 24 hours from the moment of renewal of possibility of placement of the specified information and (or) implementation of information exchange with use of the official site of system posts on the official site systems and the official site of the operator in Internet network the corresponding announcement containing date and time of such renewal.
Information posted according to provisions of this Item on the official sites of the executive bodies authorized on control of realization of investing programs in Internet network within 3 working days from the date of, the operator specified in the announcement of renewal of possibility of placement of information and (or) implementation of information exchange with use of the official site of system, is posted by the operator on the official site of system.";
state Item 20 in the following edition:
"20. The Ministry of Energy of the Russian Federation quarterly not later than in 90 days after the termination of reporting quarter, sends the report on realization of the investing programs approved by the Ministry of Energy of the Russian Federation to the executive bodies participating in approval of the appropriate investing programs.";
to declare the subitem "v" of Item 21 invalid;
add Item 22 with the words "with use of single system of the interdepartmental electronic interaction in electronic form signed with use of the strengthened qualified digital signature according to form, rules of filling of the specified form and the requirements to its format approved by the Ministry of Energy of the Russian Federation in coordination with the Ministry of Telecom and Mass Communications of the Russian Federation".
4. In the Regulations on the federal state information system "Single Portal of the State and Municipal Services (Functions)" approved by the order of the Government of the Russian Federation of October 24, 2011 No. 861 "About the federal state information systems providing electronic submission of the state and municipal services (implementation of functions)" (The Russian Federation Code, 2011, No. 44, Art. 6274; 2013, No. 45, 5807; with the changes made by the order of the Government of the Russian Federation of December 25, 2014 No. 1493):
a) add Item 1 with the subitem "zh" of the following content:
"g) accomplishment of ministerial procedures (actions) electronically in case of execution of the state services (functions) in cases, stipulated by the legislation the Russian Federation.";
b) in Item 7:
the paragraph one to state in the following edition:
"7. For provision (accomplishment) electronically the state and municipal services (ministerial procedures (actions), and also services of organizations (organizations) with use of the single portal are provided:";
add with the subitem "zh" of the following content:
"g) possibility of electronic submission of the documents and data necessary for accomplishment by the executive bodies authorized on execution of the state functions of ministerial procedures (actions), in cases if accomplishment of such ministerial procedures (actions) is electronically provided by the legislation of the Russian Federation.".
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Search in text CTRL-F
If you are guest on our site, you will work in Demo mode. In Demo mode you can see only first page of each document.
With full access you can
Database include more 65000 documents. You can find needed documents using search system.
For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions.
This section provides answers to questions set by users.