of November 7, 2014 No. 783
About approval of the allowing requirements imposed to non-state fire services
According to subitem 70-17) of Item 1 of article 12 of the Law of the Republic of Kazakhstan of April 11, 2014 "About civil protection", I ORDER:
1. Approve the enclosed allowing requirements imposed to non-state fire services.
2. (Petrov V. V.) in the procedure established by the legislation to provide to committee on emergency situations of the Ministry of Internal Affairs of the Republic of Kazakhstan:
1) state registration of this order in the Ministry of Justice of the Republic of Kazakhstan;
2) within ten calendar days after state registration of this order, its direction on official publication in periodic printing editions and in information system of law of Ad_let;
3) placement of this order on Internet resource of the Ministry of Internal Affairs of the Republic of Kazakhstan.
3. To impose control of execution of this order on the deputy minister of internal affairs of the Republic of Kazakhstan Bozhko V. K.
4. This order becomes effective after twenty one calendar days after day of its first official publication.
Minister police lieutenant general
K. Kasymov
Approved by the Order of the Minister of Internal Affairs of the Republic of Kazakhstan of November 7, 2014 No. 783
1. These allowing requirements imposed to non-state fire services (further – allowing requirements) are developed for the purpose of determination of compliance of non-state fire services on performance of works according to the prevention and suppression of the fires, carrying out wrecking in the organizations, settlements and on objects of the Republic of Kazakhstan.
2. The following allowing requirements are imposed to non-state fire services:
1) availability at least two fire trucks on the property rights or the main fire trucks acquired by means of leasing as the leasing recipient, confirmed with registration certificates of the vehicle, diagnostic cards of technical inspection of the car and technical inspection reports of readiness for suppression of the fires in form, according to appendix 1 to these allowing requirements *;
2) availability on the property right or on other legitimate right of the building or room for accommodation of workers, the rescue and fire fighting equipment, the equipment and equipment;
3) availability of the staff employees provided with special regimentals and fire-proof equipment according to the list of special regimentals and fire-proof equipment on one worker of non-state fire service according to appendix 2 to these allowing requirements, number:
at least 17 people, at the rate of 1 chief of division, 4 workers including the driver on each main fire truck during duty shift *;
at least 9 people, at the rate of 1 chief of post and 2 workers during duty shift **;
4) compliance of workers of non-state fire services of the qualification specified in appendix 3 to these allowing requirements.
Note:
* – for non-state fire services with the exit fire fighting equipment;
** – for non-state fire services without the exit fire fighting equipment.
to the Allowing requirements imposed to non-state fire services
Form
Act *
technical inspection of readiness of the main fire truck for suppression of the fires
______________________________________________________________________________
(name NGPS)
Brand, model ______________ on the ____________ chassis year of release ___________________
registration registration plate __________________ owner _______________________
______________________ chassis body ________________ ___________________ engine
1. Availability and maintaining form of the car No. ________, registration certificate
No. __________ vehicle from __________, the certificate on passing
technical inspection
______________________________________________________________________________
2. Run on speedometer __________ km.
3. The inventory and availability of fire technical equipment and equipment on the car:
№. of payment order |
Name of the equipment and equipment |
Unit of measure |
Quantity |
Availability (is available/is absent) |
1 |
2 |
3 |
4 |
5 |
1 |
The sleeve which is soaking up, 4 m long with a diameter of 125 mm |
piece. |
2 |
|
2 |
The sleeve which is soaking up, 4 m long with a diameter of 75 mm |
piece. |
2 |
|
3 |
The sleeve is pressure head, for work from hydrant, 4 - 5 m long with a diameter of 77 mm |
piece. |
2 |
|
4 |
The sleeve is pressure head, 20 m long with a diameter of 77 mm |
piece. |
6 |
|
5 |
The sleeve is pressure head, 20 m long with a diameter of 66 mm |
piece. |
10 |
|
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions. This section provides answers to questions set by users.