ORDER OF THE GOVERNMENT OF THE KYRGYZ REPUBLIC

of September 30, 2014 No. 557

About approval of the Procedure for cost determination of the privatized premises

(as amended on 13-01-2023)

According to article 61 of the Housing code of the Kyrgyz Republic the Government of the Kyrgyz Republic decides:

1. Approve the enclosed Procedure for cost determination of the privatized premises.

2. This resolution becomes effective from the date of official publication.

Prime Minister

J. Otorbayev

Approved by the Order of the Government of the Kyrgyz Republic of September 30, 2014, No. 557

Procedure for cost determination of the privatized premises

1. This Procedure determines the cost of the privatized premises of the state and municipal housing stock, except as specified, stipulated by the legislation the Kyrgyz Republic.

2. The cost of the privatized premises is established by the commission created by authorized body under which authority the privatized premises are.

3. Do not treat the cost of the privatized premises:

- costs on construction of city and district engineering constructions, the quarter bringing engineering constructions and communications, the quarter bringing engineering networks from power supplies, the high-level and street networks, microdistrict and quarter transformer substations, thermal Items, pumping units for water supply;

- costs for the built-in attached rooms;

- the costs connected with satisfaction the needs for water, gas, the electric power and heat, other requirements;

- cost of works on improvement and gardening;

- the cost of the houses demolished in case of construction, structures and the device of fruit and berry plantings and crops;

- the costs connected with development of the taken-down structures and removal of construction debris.

4. Money from privatization of premises arrives in Fund of development of housing construction or similar funds and is used for construction and content of premises of the state or municipal housing stock.

5. The cost of the privatized premises of the state and municipal housing stock is determined proceeding from the price of one square meter of total area of the privatized premises by multiplication by total area of the privatized premises.

6. The price of one square meter of total area of the privatized premises (further - the price) is calculated as the work of the basic price of one square meter of total area of the privatized premises (further - the basic price) on the coefficients considering year of construction, comfort, improvement and arrangement of the privatized premises on formula:

                                C = Central Bank x KB x Kk x Ke, where:

C - the price of one square meter of total area of the privatized premises;

The Central Bank - the basic price;

Kb - coefficient of comfort of premises;

Kk - coefficient of comfort of premises;

Ke - coefficient of number of storeys of premises;

Kb - the coefficient reflecting comfort of premises: availability of the elevator, hot and cold water supply, water disposal, central heating and gas supply.

The KB size in premises in which there are no hot and cold water supply or water disposal, or central heating and gas supply decreases by 0,1 indicator for each absent type of engineering arrangement, but no more than by 0,5.

Table 1

Types of premises

Kb

1

The premises having all types of improvement

1

2

Premises, one type of engineering arrangement is not in which,

0,9

Kk - the coefficient of comfort of premises is determined by the relation of total area of premises to living space of the room.

Table 2

Relation of total area of premises to living space

Kk

1

Less 1,5

1

2

From 1,5 to 2,1

1,1

3

From 2,1 and more

1,2

Ke - coefficient of number of storeys of premises is determined by premises arrangement in the multi-storey apartment house.

Table 3

Premises arrangement in the multi-storey apartment house

Ke

1

On the last (upper) floor

0,9

2

On the first floor

0,95

3

Between the first and the last (upper) floors

1

7. The basic price is determined by formula:

                                                Central Bank = P x P / (T x 12), where:

The Central Bank - the basic price;

П - coefficient of the period of construction of premises;

Р - average price for one square meter of premises in the respective settlement;

12 - number of months in year;

T - normative service life of the building (house).

Table 4

Groups of apartment and individual houses

Characteristic of the building and structural elements

T

(years)

1 group

Buildings stone, ordinary; the bases - stone; walls - stone (brick), large-block and large-panel; overlappings - steel concrete or mixed, and also the stone codes on metal beams

125

Warning!!!

This is not a full text of document! Document shown in Demo mode!

If you have active License, please Login, or get License for Full Access.

With Full access you can get: full text of document, original text of document in Russian, attachments (if exist) and see History and Statistics of your work.

Get License for Full Access Now

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.

Search engine created by SoyuzPravoInform LLC.