On December 17, 2004 No. 1433
of November 15, 2004 No. 01-02/12-21, 15 of November, 2004 No. ESh-01-21/247
About approval of the Regulations on procedure of customs control and customs clearance of the electric power moved on power lines through customs border of the Republic of Uzbekistan
According to article 6 of the Law of the Republic of Uzbekistan "About the State Customs Service" and in pursuance of the order of the Cabinet of Ministers of the Republic of Uzbekistan No. 73-f of February 9, 2004 the State Customs Committee of the Republic of Uzbekistan and SAC decide Uzbekenergo:
1. Approve the enclosed Regulations on procedure of customs control and customs clearance of the electric power moved on power lines through customs border of the Republic of Uzbekistan.
2. Enact this resolution after ten days from the date of its state registration in the Ministry of Justice of the Republic of Uzbekistan.
Chairman of the State Customs Committee of the Republic of Uzbekistan |
B. Matlyubov |
Chairman of the board SAC of Uzbekenergo |
E.Shoismatov |
Approved by the Resolution of the State Customs Committee of the Republic of Uzbekistan and SAC of Uzbekenergo of November 19, 2004 No. 01-02/12-21 and No. ESh-01-21/247
This Provision is developed according to article 6 of the Law of the Republic of Uzbekistan "About the State Customs Service" and in pursuance of the order of the Cabinet of Ministers of the Republic of Uzbekistan No. 73-f of February 9, 2004 and determines procedure for customs control and registration of the electric power moved on power lines through customs border of the Republic of Uzbekistan.
1. In this Provision the basic concepts of the Customs code of the Republic of Uzbekistan, and also the following terms and designations are used:
electrical energy - the goods of special type which are characterized by simultaneity of production and consumption;
settlement period - month during which electrical supply is performed;
devices of settlement accounting of the electric power are the counters of electrical energy established on power facilities for determination of the amounts of electric power which passed on power lines;
the place of customs control - installation site of devices of settlement accounting of the electric power on interstate power line;
energy object (power facility) - power plants, substations, power lines, installation sites of devices of settlement accounting;
power system (power supply system) - set of the power facilities connected among themselves by general regime of engineering continuous process of production, transfer, distribution and consumption of electrical energy in case of supervisory control;
the power supplying organization (power organization) - the legal entity who has right to sell and distributions of energy under the agreement;
electrical supply under the agreement - the quantity of electrical energy transferred from power supply system of one state to power supply system of other state during the settlement period under the agreement of business entities;
The integrated Power System of Central Asia (OES TsA) consolidation of power supply systems of the states of Central Asia, connected by power lines during the work in the single energy mode;
parallel work of power supply systems of the states - joint operation of power supply systems of the states of Central Asia combined by the single electric mode which is followed as planned, and unplanned (technological) overflows of the electric power;
"KDTs "energy" - the Coordination dispatch center "Energy" of the states of Central Asia;
interstate technical overflows electric энергииэто overflows of electrical energy between power supply systems of the states connected among themselves by power lines on which movement of electrical energy through customs border of this or that state is performed;
balance overflow of electrical energy on the energosistemealgebraichesky amount of interstate technical overflows of electrical energy on all interstate power lines of all classes of tension which are in work for settlement period;
commercial overflows of electrical energy between electric utility systems:
the states of OES TsA - the overflows distributed by KDTs "Energy" on actually taken place operating mode of power supply systems based on their balance overflows (operational or actual) proceeding from the signed contracts between power supply systems for mutually electrical supply and conditions of parallel work of all power supply systems;
other states - the overflows determined by the power organization authorized to perform movement of the electric power through customs borders of the Republic of Uzbekistan;
technological (unplanned) overflows of electrical energy between power supply systems - quantity of the electrical energy moved between in parallel the working power supply systems of the states over the approved contractual amounts of balance overflow for settlement period including:
the overflows of electrical energy resulting from regulation and maintenance of its parameters in the set limits;
discrepancy between operational and actual information on overflows.
the overflows of electrical energy arising between power supply systems of the states, performed for the purpose of the prevention, prevention or liquidation of emergencies;
transit of electrical energy - transfer of the electrical energy on power networks of one state made in the territory of another and intended for the territory of the third state;
transfer of electrical energy between two Items of one state on power networks of other state;
technological expense of electrical energy on its transportation - the expense of electrical energy caused by features of the engineering and physical procedures happening in power facilities;
customs post of control - the customs post exercising control of the actual movement of the electric power through customs border of the Republic of Uzbekistan in which region of activities there is place of customs control;
customs post of registration - customs post where documentary registration of commercial and technological (unplanned) overflows of the electric power is made.
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions. This section provides answers to questions set by users.
The document ceased to be valid since June 30, 2020 according to Item 2 of the Resolution of the State Customs Committee of the Republic of Uzbekistan and the Department of Energy of the Republic of Uzbekistan of June 15, 2020 No. 01-02/12-25, 01-05-4-3201