ORDER OF THE MINISTRY OF FUEL AND ENERGY OF UKRAINE

of June 21, 2013 No. 388

About the organization of supervision (control) of the issued specifications on accession

According to the Law of Ukraine "About power industry", the Regulations on the state energy supervision of the modes of consumption of electrical and heat energy approved by the resolution of the Cabinet of Ministers of Ukraine of August 07, 1996 No. 929, the Rules of accession of electroinstallations to power networks approved by the resolution of the National commission performing state regulation in the field of power, of January 17, 2013 No. 32, registered in the Ministry of Justice of Ukraine on February 08, 2013 for No. 236/22768, and for the purpose of ensuring reliable electric utility service of consumers of PRIKAZYVAYU:

1. To provide to heads of the electrotransferring organizations:

1.1. Provision to the state inspectorates for energy supervision of the modes of consumption of electrical and heat energy in the Crimean region, areas, the cities of Kiev and Sevastopol, information concerning accessions of electroinstallations to power networks, till the 10th of the following for reporting in the form given in appendix to this order.

1.2. Involvement of representatives of the state inspectorates for energy supervision of the modes of consumption of electrical and heat energy in the Crimean region, areas, cities of Kiev and Sevastopol for control of compliance new constructed, reconstructed or technically the re-equipped electroinstallations of customers (consumers) to specifications, regulations, rules and standards, and also confirmation of their availability for service, before connection of the specified electroinstallations to power networks.

2. To provide to the state inspectorates for energy supervision of the modes of consumption of electrical and heat energy in the Crimean region, areas, the cities of Kiev and Sevastopol according to the written address of the applicant the conclusion of rather technical justification of requirements of specifications of accession to power networks.

3. To department of power industry (Low-flow S. Ya.) in accordance with the established procedure to submit this order on state registration to the Ministry of Justice of Ukraine.

4. This order becomes effective from the date of its official publication.

5. To impose control over the implementation of this order on the deputy minister Cech S. M.

Minister

E.Stavitsky

Appendix

to the Order of the Ministry of Fuel and Energy of Ukraine of June 21, 2013 No. 388

Information concerning accessions of electroinstallations to power networks

Information

_________________________________________________

(the name of the electrotransferring organization)

concerning accessions of electroinstallations to power networks

for _______________________ month 20 ___ years

І. Standard accessions

    1. The number of the applications submitted by customers for obtaining

  specifications  on  accession  to  networks (objects)

power industry:

in month under report _______________________________________________;

since the beginning of year ___________________________________________________.

    2. The capacity size ordered to accession:

in month under report _______________________________________________;

since the beginning of year __________________________________________________.

    3. The number of the provided   Treaties of Accession to

electric networks and  specifications on accession to

to networks (objects) of power industry:

in month under report _______________________________________________;

since the beginning of year ___________________________________________________.

    4. The refusal bases in ensuring standard accession:

                                                                               

No. of payment order

The refusal bases in ensuring standard accession

Name of object of the customer

Location of object of the customer

1

2

3

4

1

In total

 

    5. The list    of the objects  of external put into operation

power supply:

                                        

No. of payment order

The list of the subjects to external power supply put into operation

Location of object of the customer

Date of Introduction

1

2

3

4

1

Warning!!!

This is not a full text of document! Document shown in Demo mode!

If you have active License, please Login, or get License for Full Access.

With Full access you can get: full text of document, original text of document in Russian, attachments (if exist) and see History and Statistics of your work.

Get License for Full Access Now

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.

Search engine created by SoyuzPravoInform LLC.