The document ceased to be valid since  May 15, 2020 according to Item 1 of the Order of the Government of the Kyrgyz Republic of  April 9, 2020 No. 196

ORDER OF THE GOVERNMENT OF THE KYRGYZ REPUBLIC

of July 28, 2009 No. 476

About approval of the Regulations on procedure for construction, acceptance and technology accession of small hydroelectric power stations to power networks

(as amended of the Order of the Government of the Kyrgyz Republic of 04.10.2018 No. 456)

According to the Law of the Kyrgyz Republic "About renewable energy resources" and the Presidential decree of the Kyrgyz Republic "About specific measures for development of small and medium power in the Kyrgyz Republic" of October 14, 2008 the No. 365 Government of the Kyrgyz Republic decides:

1. Approve the enclosed Regulations on procedure for construction, acceptance and technology accession of small hydroelectric power stations to power networks (further - the Provision).

2. To the relevant authorized bodies which competence the construction, acceptance and technology accession of small hydroelectric power stations to power networks enters, strictly to be guided by this Provision.

3. To the Ministry of Industry, Energy and Fuel Resources of the Kyrgyz Republic to bring earlier made decisions into accord with this resolution.

4. To impose control over the implementation of this resolution on department of power and mineral resources of Government office of the Kyrgyz Republic.

 

Prime Minister

I. Chudinov

Approved by the order of the Government of the Kyrgyz Republic of July 28, 2009 No. 476

Regulations on procedure for construction, acceptance and technology accession of small hydroelectric power stations to power networks

1. General provisions

1. This Regulations on procedure for construction, acceptance and technology accession of small hydroelectric power stations to power networks (further - the Provision) are developed according to the laws of the Kyrgyz Republic "About power", "About power industry", "About energy saving", "About renewable energy resources" and the Presidential decree of the Kyrgyz Republic "About specific measures for development of small and medium power in the Kyrgyz Republic" of October 14, 2008 No. 365.

2. This Provision regulates procedure and procedures of document creation on the right of construction, technology accession to power networks of small hydroelectric power stations, and also procedure for acceptance for operation of the small hydroelectric power stations completed by construction.

3. This Provision acts on all territory of the Kyrgyz Republic and it is obligatory to execution by the legal entities and physical persons performing activities in the field of production, transfers, distributions and electricity sales including for use in own purposes the developed electric power, and also for the project and construction organizations performing designing or construction of small hydroelectric power stations.

4. Other Rules, Construction regulations and rules (Construction Norms and Regulations - the collection of regulating documents, obligatory for all participants of construction, the list of the existing regulating documents on construction of 1981) and regulating technical documents do not extend to the objects of small hydropower regulated by this Provision.

2. Construction of small hydroelectric power station - accounting of use of hydroenergy resources, preparation of materials for construction of small hydroelectric power stations

5. The Ministry of Industry, Energy and Fuel Resources of the Kyrgyz Republic (further - authorized body on power):

- registers places of perspective construction of small hydroelectric power stations and controls execution of the conditions provided in approval of documents;

- annually holds the tender for construction of the small hydroelectric power stations included in the list of construction the forthcoming five years according to the legislation of the Kyrgyz Republic;

- renders assistance in the solution of questions of withdrawal of the parcels of land under construction of facilities, water use, the rational guaranteed technology accession of small hydroelectric power stations to power networks;

- annually publishes the list of small hydroelectric power stations which construction is planned in the forthcoming five years in mass media.

3. Designing and construction of small hydroelectric power stations and power networks for technology accession

6. The physical person or legal entity which won the tender for the right of construction of small hydroelectric power station (further - the owner of the document), for the solution of question of issue of capacity of small hydroelectric power station shall address the owner of power networks and in authorized body on power for:

- execution of the agreement of payment on the established rate for technology accession of the amounts necessary for financing of the events held in power networks and issues of capacity of small hydroelectric power stations;

- receipts of the specification determining technical and production requirements of equipment of the distributing device, hydrogenerators and hydroaggregates devices of automatic equipment and relay protection.

7. The owner of power networks shall in ten-day time after the conclusion of the agreement for payment on the established rate for technology accession to issue to the owner of the document Specification.

The specification issued by the owner of power network to the owner of the document shall contain the requirements obligatory to execution when designing small hydroelectric power stations and include the following:

- requirements for equipment of connections of the distributing device, relay protection and automatic equipment;

- equipment of hydroaggregates and hydrogenerators devices of regulation of frequency and tension (only for aggregates single capacity of 500 kW and above);

- requirements to means of accounting of electrical energy, in volume of the requirements provided by Regulations for electrical installation and other normative and technical documents;

- requirements to means of technology communication;

- level of current of short circuit and time of elimination of short circuit;

- the requirements determining booking in the distributing device for installation of the electrotechnical equipment which is carried out by the owner of power network for technology accession of small hydroelectric power station to power networks;

- the scheme in point of connection to power networks of the owner.

Warning!!!

This is not a full text of document! Document shown in Demo mode!

If you have active License, please Login, or get License for Full Access.

With Full access you can get: full text of document, original text of document in Russian, attachments (if exist) and see History and Statistics of your work.

Get License for Full Access Now

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.

Search engine created by SojuzPravoInform LLC. UI/UX design by Intelliants.