Document from CIS Legislation database © 2003-2025 SojuzPravoInform LLC

The document ceased to be valid since July 1, 2024 according to item 4 of the Order of the Government of the Russian Federation of December 28, 2023 No. 2359

ORDER OF THE GOVERNMENT OF THE RUSSIAN FEDERATION

of June 3, 2008 No. 426

About qualification of the generating object functioning on the basis of use of renewable energy resources

(as amended on 13-09-2023)

1. Approve the enclosed Rules of qualification of the generating object functioning on the basis of use of renewable energy resources.

2. To the Ministry of Energy of the Russian Federation together with the interested federal executive bodies:

develop and provide till September 1, 2008 in accordance with the established procedure the draft of the act of the Government of the Russian Federation of determination of the main directions of state policy in the field of increase in energy efficiency of power industry on the basis of use of the renewable energy resources containing target indicators of production volume and consumption of electrical energy with use of renewable energy resources in overall balance sheet of production and consumption of electrical energy;

develop and provide till October 1, 2008 in accordance with the established procedure the project of regulatory legal act of the Government of the Russian Federation about procedure for determination of the allowance added to equilibrium price of the wholesale market on electrical energy for determination of the price of the electrical energy made on the qualified generating objects functioning on the basis of use of renewable energy resources;

develop and provide till October 1, 2008 in accordance with the established procedure the project of regulatory legal act of the Government of the Russian Federation about criteria for provision of subsidies from the federal budget according to the procedure of compensation of cost of technology accession of the generating objects with the established generating capacity no more than 25 MW recognized by the qualified objects functioning on the basis of use of renewable energy resources, to persons to whom such objects belong on the property right or other legal cause;

develop and approve till October 1, 2008 procedure for maintaining the register of issue and repayment of the certificates confirming production volume of electrical energy on the qualified generating objects functioning on the basis of use of renewable energy resources.

3. The rules of qualification of the generating object functioning on the basis of use of renewable energy resources, approved by this resolution become effective since October 1, 2008.

Russian Prime Minister

V. Putin

 

Approved by the Order of the Government of the Russian Federation of June 3, 2008 No. 426

Rules of qualification of the generating object functioning on the basis of use of renewable energy resources

I. General provisions

1. These rules establish criteria and procedure for qualification of power plants and separate power stations on production of electrical energy (power units) (further - the generating objects) functioning on the basis of use of renewable energy resources.

In case of qualification of the generating objects functioning on the basis of use of renewable energy resources compliance of the specified generating objects to target indicators of production volume and consumption of electrical energy with use of renewable energy resources in overall balance sheet of production and consumption of electrical energy, to target exponents of localization in the territory of the Russian Federation of production of the capital and (or) the service generating equipment for production of electrical energy with use of renewable energy resources (further - extent of localization) and to target indicators of export of industrial output (the capital and (or) the service generating equipment (including materials, raw materials and component parts) for production of electrical energy with use of renewable energy resources) and (or) works (services) performed (rendered) when designing is determined construction and installation of the generating objects located in the territories of foreign states (further - export indicators), established according to the main directions of state policy in the field of increase in energy efficiency of power industry on the basis of use of renewable energy resources (further - target indicators).

Extent of localization on the generating object planned to commissioning till December 31, 2024 inclusive (except for the generating object functioning on the basis of use of photo-electric transformation of energy of the sun selected during competitive selection of investment projects on construction of the generating objects functioning on the basis of use of renewable energy resources which is carried out later January 1, 2020 according to the Rules of the wholesale market of electrical energy and capacity approved by the order of the Government of the Russian Federation of December 27, 2010 No. 1172 "About approval of Rules of the wholesale market of electrical energy and capacity and about introduction of amendments to some acts of the Government of the Russian Federation concerning the organization of functioning of the wholesale market of electrical energy and capacity" (further - Rules of the wholesale market of electrical energy and capacity), and planned to commissioning from January 1, 2023 to December 31, 2024), it is determined as deposit amount of each element of the equipment (the equipment assembled) and the works performed during the designing and construction in extent of localization by the generating object. For the purpose of these rules as the planned date of commissioning of the generating object which is selected by results of competitive selection of investment projects on construction of the generating objects functioning on the basis of use of renewable energy resources which is carried out according to Rules of the wholesale market of electrical energy and capacity the start date of delivery of capacity determined concerning this generating object following the results of the specified selection is used.

Extent of localization is determined by the generating object functioning on the basis of use of photo-electric transformation of energy of the sun selected during competitive selection of investment projects on construction of the generating objects functioning on the basis of use of renewable energy resources which is carried out later January 1, 2020 according to Rules of the wholesale market of electrical energy and capacity and planned to commissioning from January 1, 2023 to December 31, 2024 as deposit amount of each element of the equipment (the equipment assembled) and works (services) performed when designing of the generating object.

Extent of localization is determined by the generating object planned to commissioning after December 31, 2024 as deposit amount of each element of the equipment (the equipment assembled) and works (services) performed when designing of the generating object.

The list of conditions for determination of contribution of separate elements of the equipment (the equipment assembled) and works in extent of localization on the generating object functioning on the basis of wind energy use which is selected following the results of the selection of investment projects made till June 1, 2016 is given in appendix No. 1.

The list of conditions for determination of contribution of separate elements of the equipment (the equipment assembled) and works in extent of localization on the generating object functioning on the basis of wind energy use which is selected following the results of the selection of investment projects made later June 1, 2016 planned to commissioning till December 31, 2024 inclusive is given in appendix No. 1(1).

The list of conditions for determination of contribution of separate elements of the equipment (the equipment assembled) and works in extent of localization on the generating object functioning on the basis of wind energy use planned to commissioning after December 31, 2024 is given in appendix No. 1(2).

The list of conditions for determination of contribution of separate elements of the equipment (the equipment assembled) and works in extent of localization on the generating object functioning on the basis of use of photo-electric transformation of energy of the sun, with use of technology on the basis of crystal silicon, planned to commissioning till December 31, 2024 inclusive (except for the generating object which is selected during competitive selection of investment projects on construction of the generating objects functioning on the basis of the use of renewable energy resources which is carried out later January 1, 2020, and planned to commissioning from January 1, 2023 to December 31, 2024), is given in appendix No. 2.

The list of conditions for determination of contribution of separate elements of the equipment (the equipment assembled) and works in extent of localization on the generating object functioning on the basis of use of photo-electric transformation of energy of the sun which is selected during competitive selection of investment projects on construction of the generating objects functioning on the basis of use of renewable energy resources which is carried out later January 1, 2020 and planned to commissioning from January 1, 2023 to December 31, 2024 is given in appendix No. 2(1).

The list of conditions for determination of contribution of separate elements of the equipment (the equipment assembled) and works in extent of localization on the generating object functioning on the basis of use of photo-electric transformation of energy of the sun planned to commissioning after December 31, 2024 is given in appendix No. 2(2).

The list of conditions for determination of contribution of separate elements of the equipment (the equipment assembled) and works in extent of localization on the generating object functioning on the basis of use of photo-electric transformation of energy of the sun, with use of thin-film technology, planned to commissioning till December 31, 2024 inclusive (except for the generating object which is selected during competitive selection of investment projects on construction of the generating objects functioning on the basis of the use of renewable energy resources which is carried out later January 1, 2020, and planned to commissioning from January 1, 2023 to December 31, 2024), is given in appendix No. 3.

The list of separate elements of the equipment (the equipment assembled) and works which production in the Russian Federation determines contribution to extent of localization by the generating object planned to commissioning till December 31, 2024 inclusive functioning on the basis of energy use of water flows (including energies of sewage) except as specified of use of such energy at hydroheat-sink electrical power stations, is given in appendix No. 4.

The list of conditions for determination of contribution of separate elements of the equipment (the equipment assembled) and works in extent of localization on the generating object functioning on the basis of use of production wastes and consumption, except for the waste received in the course of use of hydrocarbonic raw materials and fuel is given in appendix No. 4(1).

The list of conditions for determination of contribution of separate elements of the equipment (the equipment assembled) and works in extent of localization on the generating object planned to commissioning after December 31, 2024 functioning on the basis of energy use of water flows (including energies of sewage), except for methods of use of such energy at hydroheat-sink power plants, is given in appendix No. 4(2).

Body, authorized to determine extent of localization by the generating object and export indicator on the generating object, the federal executive body performing functions on development of state policy and normative legal regulation in the field of industrial and defense industry complex is (further - authorized federal executive body).

2. Recognition of the generating objects the qualified generating objects performs Market Council based on statements of their owners or other legal owners.

3. The generating object is recognized to its following criteria qualified on condition of compliance:

a) the generating object performs development of electrical energy or the combined development of electrical and heat energy and functions on the basis of use only of renewable energy resources or the combined use of renewable energy resources and other types of fuel. At the same time I will eat around developed on the qualified generating object on the basis of use of renewable energy resources of electrical energy, calculated according to Item 8 of Rules of maintaining the register of issue and repayment of certificates, confirming production volume of electrical energy on functioning on the basis of use of renewable energy resources the qualified generating objects, approved by the order of the Government of the Russian Federation of February 17, 2014 No. 117 "About some questions, connected with certification of amounts of the electrical energy made on the renewable energy resources functioning on the basis of use the qualified generating objects" if other is not established by this subitem constitutes at least 95 percent of total amount of electrical energy, developed on the qualified generating object;

The amount of the electrical energy developed on the qualified generating object functioning on the basis of use of production wastes and consumption, except for the waste received in the course of use of hydrocarbonic raw materials and fuel, calculated according to Item 8 of Rules of maintaining the register of issue and repayment of the certificates confirming production volume of electrical energy on the renewable energy resources functioning on the basis of use the qualified generating objects shall not be less than 80 percent of total amount of the electrical energy developed on the qualified generating object during the period from the date of decision making about recognition specified generating object qualified generating by object till the last day of month in which expire 6 months from the date of input of such generating object in operation.

Warning!!!

This is not a full text of document! Document shown in Demo mode!

If you have active License, please Login, or get License for Full Access.

With Full access you can get: full text of document, original text of document in Russian, attachments (if exist) and see History and Statistics of your work.

Get License for Full Access Now

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.

Search engine created by SoyuzPravoInform LLC.