Approved by the Resolution of Gosgortekhnadzor of the Republic of Tajikistan of October 9, 1997, No. 04/6

Procedure for creation and coordination of annual plans of development of mining operations and standard rates of losses and impoverishment in case of development of the fields of solid minerals in the Republic of Tajikistan

1. General provisions

1.1. According to Single rules of protection of subsoil in case of development of the fields of solid minerals development of the fields of solid minerals is allowed on condition of observance of requirements of the legislation on subsoil in the presence of the development plan for mining operations.

1.2. The development plan for mining operations are developed for year according to projects and affirm the company in coordination with Gosgortekhnadzor of the Republic of Tajikistan.

1.3. The annual plan of development of mining operations joins the standard rates of losses and impoverishments calculated on each extraction unit.

Note: Extraction unit - the minimum site of the field with rather uniform geological conditions which working off is performed by one system of development and the technological scheme of dredging (ledge, the block, lava, the camera, etc.) and within which inventories are determined and is possible primary accounting of extraction of minerals and passing components.

1.4. The project on field development, including on trial, is developed based on the design assignment approved by superior organization and approved about Gosgortekhnadzor of the Republic of Tajikistan regarding protection of subsoil.

In the project issues, stipulated in Item 2.9 Single rules of protection of subsoil in case of development of minerals shall be resolved.

1.5. If on operating plant by the project it is not provided and actually working off of balance reserves of the passing minerals lying jointly about the main is not conducted, the company shall develop and approve amendment to the project where issues of production of passing minerals, their conversion (export) or warehousing in special dumps (Item 2.12 of Single rules of protection of subsoil) shall be resolved.

2. Planning and design of development of mining operations

Development plans for mining operations shall provide:

2.1. implementation of regularity of working off of the field or its part with optimum level of extraction of minerals from subsoil excluding selective working off of rich sites and complication of conditions of its further development;

2.2. completion of inventories, opened, prepared and ready to dredging, according to the established tasks (standard rates);

2.3. preserving the off-balance and preserved balance reserves of minerals or their involvement in working off;

2.4. use of overburden and country rocks;

2.5. procedure and repayment periods of emptiness;

2.6. measures for protection of buildings, constructions, the land surface and water objects from adverse effect of mountain developments;

2.7. application of selective dredging of minerals if it increases the level of their extraction from subsoil or reduces impoverishment;

2.8. recultivation of the lands broken by mining operations;

2.9. the choice of the methods and systems of development providing the most complete extraction from subsoil of the main and together with them the lying minerals;

2.1. In compliance of the planned amount of mountain and preparatory and cut developments and overburden works to tasks (standard rates) on inventories, and also tasks, opened, prepared and ready to dredging, on mining;

2.11. implementation of mining according to the approved standards;

2.12. carrying out the developmental and research works, implementation of the technologies directed to increase in extraction from subsoil of minerals as the main, and lying together with them;

2.13. determination of quantity of at the same time developed extraction units;

2.14. observance of schedules of production on each extraction unit and terms of their repayment.

3. Content and registration of materials, development plans for mining operations

Annual plans of development of mining operations shall contain:

a) the explanatory note in which valleys to be reflected:

3.1. Short geological characteristic of the field and extraction units;

3.2. data on the applied systems of development and security with inventories on their readiness to dredging;

3.3. production amount, standard rates of losses and impoverishment in the planned period;

3.4. the above-standard losses allowed in the current year and their reasons;

3.5. actions for ensuring the planned level of extraction of minerals from subsoil;

3.6. data on non-confirmation of inventories in mining process of the field in previous year;

3.7. actions for ensuring safe conducting mining operations, in volume number when using explosive materials availability and condition of emergency exits from mines and sites of mining operations;

3.8. condition of tailings dams, hvostoprovod, measures for reliability of their functioning;

3.9. production technology of drilling and blasting operations;

b) graphical material, including:

3.10. development plans for mining operations (projection to the vertical or horizontal plane) with razbivny on quarters;

3.11. situational plan of surface;

3.12. the scheme of airing of lifting developments with drawing emergency exits;

3.13. plans of placement of pedigree dumps, special dumps, breeds of vskrysha, substandard or lean ores, waste of mining, hvostoprovod and tailings dams;

3.14. on graphical materials shall be put:

- contours of balance reserves;

- contours of the inventories extinguished and planned to repayment;

- contours of inactive inventories;

- sites of the normalized losses;

- borders of mountain branch.

4. Procedure for coordination of the development plan for mining operations and standard rates of losses and impoverishment of minerals

4.1. Drafts of development plans for mining operations and standard rates of losses and impoverishment are considered at technical meetings of the companies with participation on them mining inspectors of Gosgortekhnadzor then they are sent by the company for approval in Gosgortekhnadzor of the Republic of Tajikistan with the cover letter.

4.2. In case when the mining inspector did not participate in meeting, the draft of the plan goes to it for consideration for the term of no more than 10 days, and, after receipt from it of notes and offers in the form of the conclusion, the company makes amendments to the draft of the plan according to the conclusion of the inspector then it together about this conclusion sends the plan to Gosgortekhnadzor of the Republic of Tajikistan in duplicate.

4.3. Consideration of materials of plans development of mining operations in Gosgortekhnadzor is carried out to the 10th dnevny time.

4.4. If content and registration of materials of development plans for mining operations do not meet the requirements of this Procedure, the Gosgortekhnadzor has the right to demand need of their correction, amendment and refining for oral or written form.

Warning!!!

This is not a full text of document! Document shown in Demo mode!

If you have active License, please Login, or get License for Full Access.

With Full access you can get: full text of document, original text of document in Russian, attachments (if exist) and see History and Statistics of your work.

Get License for Full Access Now

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.

Search engine created by SoyuzPravoInform LLC.