Document from CIS Legislation database © 2003-2020 SojuzPravoInform LLC

RESOLUTION OF THE PRESIDENT OF THE REPUBLIC OF UZBEKISTAN

of June 7, 2007 No. PP-649

About measures for enhancement of procedure for issue of licenses for right to use by subsoil plots

(as amended on 10-01-2019)

According to the Law of the Republic of Uzbekistan "About subsoil" and for the purpose of enhancement of procedure for issue of licenses for right to use by subsoil plots:

1. Determine the State committee of the Republic of Uzbekistan on geology and mineral resources authorized body by issue of licenses for right to use by subsoil plots for geological studying on the terms of entrepreneurial risk, and also for the purpose of search and investigation of fields and hydrocarbon production, construction and operation of underground constructions for storage of hydrocarbons.

2. Approve Regulations on procedure and conditions of provision of right to use by subsoil plots according to appendix.

3. Establish procedure according to which:

the rights to use by subsoil plots which are earlier received by the companies and the organizations for mining on the basis of the gornootvodny act, and also for geological studying of subsoil on the terms of entrepreneurial risk on the basis of state registration of works are subject to renewal on the corresponding licenses for right to use by subsoil plots;

the applications for receipt of the license for right to use by subsoil plots which are under consideration and again submitted are subject to consideration in generally established procedure strictly according to the Regulations on procedure and conditions of provision of right to use by subsoil plots approved by this resolution.

In two-month time to provide to the state committee of the Republic of Uzbekistan on geology and mineral resources renewal of the permissions which are earlier issued to the companies and the organizations and issue of the corresponding licenses of the established sample for right to use by subsoil plots by it.

4. To the state committee on geology and mineral resources, the State inspection Sanoatgeokontekhnazorat, the State committee of the Republic of Uzbekistan on ecology and environmental protection, Council of Ministers of the Republic of Karakalpakstan and khokimiyats of areas to exercise constant control behind non-admission of mining by the companies and organizations without receipt of licenses for right to use by subsoil plots by them.

5. To the Ministry of Justice of the Republic of Uzbekistan together with the interested ministries and departments in a month:

make in the Cabinet of Ministers offers on the changes and amendments in the legislation following from this resolution;

provide reduction of regulations of the ministries and departments in compliance with this resolution.

6. To impose control of execution of this resolution on the deputy prime minister of the Republic of Uzbekistan Sanakulov K. S.

President of the Republic of Uzbekistan

Islam Karimov

Appendix

to the Resolution of the President of the Republic of Uzbekistan of June 7, 2007 No. PP-649

Regulations on procedure and conditions of provision of right to use by subsoil plots

I. General provisions

1. This Provision determines procedure and conditions of provision of right to use by subsoil plots.

Subsoil is provided on the basis of the license for right to use by the subsoil plot for:

geological studying;

trial mining;

mining;

uses of technogenic mineral educations;

construction and operation of the underground constructions which are not connected with mining;

formations of the protected geological objects;

collection of samples of kamnesamotsvetny raw materials, paleontologic remaining balance and other geological collection materials.

This Provision does not extend much and conditions of provision of right to use by the subsoil plots containing nonmetallic minerals.

2. Licenses are, as a rule, granted separately on each type of use of natural resources determined by Item of 1 this provision.

3. This Provision is applied by provision of subsoil plots in use based on the production sharing agreement if other is not stipulated by the legislation about production sharing agreements.

4. Receipt of the license is not required in cases, the stipulated in Article 31 Law of the Republic of Uzbekistan "About subsoil".

II. Licenses for right to use by subsoil plots

1. The license for right to use by the subsoil plot for geological studying

5. The license for right to use by the subsoil plot for geological studying certifies the right of conducting search, assessment, investigation of mineral deposits on the terms of entrepreneurial risk (at the expense of own means of the subsoil user) and production sharing agreements. The license is also granted for geological studying of subsoil for the purpose of allocation and assessment of the subsoil plots intended for construction and operation of the underground constructions which are not connected with mining.

The basis of emergence of right to use by subsoil plots for geological studying at the expense of means of the Government budget and own means of the organizations within state programs of development and reproduction of mineral resources are the design estimates on geological studying of subsoil approved in accordance with the established procedure

2. The license for right to use by the subsoil plot for trial mining

6. The license for right to use by the subsoil plot for trial mining certifies the right of its owner to perform in the course of geological studying of subsoil mining for the purpose of development or enhancement of technology of enrichment and conversion of minerals, the choice of rational methods and methods of industrial development of mineral deposits, and also use of technogenic mineral educations.

7. Receipt of the license for right to use by subsoil plots for carrying out at stages of assessment and investigation of fields of solid minerals of pilot (trial) production in the amounts proved by the design estimates and minerals, sufficient for stock counting, and assessment of their quality is not required.

8. Trial hydrocarbon production can be made on separate deposits or their representative sites in the course of geological studying (search and investigation), and on deposits of complex structure - within the reconnoitered fields with the inventories approved in accordance with the established procedure.

Trial hydrocarbon production is made for the purpose of refining available and receipts of the additional data necessary for creation of geological model of the field, assessment and stock counting of hydrocarbons and the passing useful components containing in them, creation of the project on industrial mining of hydrocarbons.

Warning!!!

This is not a full text of document! Document shown in Demo mode!

If you have active License, please Login, or get License for Full Access.

With Full access you can get: full text of document, original text of document in Russian, attachments (if exist) and see History and Statistics of your work.

Get License for Full Access Now

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 40000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.

Search engine created by SojuzPravoInform LLC. UI/UX design by Intelliants.