of September 30, 2024 No. 613/Tax Code
About approval of Rules of the organization of activities of data-processing center and carrying out the international or national technical audit
In compliance Items 3 and 4 of article 13-3 of the Law of the Republic of Kazakhstan "About informatization" PRIKAZYVAYU:
1. Approve the enclosed Rules of the organizations of activities of data-processing center and carrying out the international or national technical audit.
2. To provide to committee of telecommunications of the Ministry of digital development, innovations and aerospace industry of the Republic of Kazakhstan in the procedure established by the legislation:
1) state registration of this order in the Ministry of Justice of the Republic of Kazakhstan;
2) placement of this order on Internet resource of the Ministry of digital development, innovations and the aerospace industry of the Republic of Kazakhstan;
3) within ten working days after state registration of this order in the Ministry of Justice of the Republic of Kazakhstan submission to Legal department of the Ministry of digital development, innovations and the aerospace industry of the Republic of Kazakhstan of data on execution of the actions provided by subitems 1) and 2) of this Item.
3. To impose control of execution of this order on the supervising vice-minister of digital development, innovations and the aerospace industry of the Republic of Kazakhstan.
4. This order becomes effective since January 8, 2025 and is subject to official publication.
Minister of digital development, innovations and aerospace industry of the Republic of Kazakhstan
Zh. Madiyev
It is approved Committee of homeland security of the Republic of Kazakhstan |
|
Approved by the Order of the Minister of digital development, innovations and the aerospace industry of the Republic of Kazakhstan of September 30, 2024 No. 613/Tax Code
1. These rules are developed in compliance by Items 3 and 4 of article 13-3 of the Law of the Republic of Kazakhstan "About informatization" (further - the Law) and determine procedure for the organization of activities of data-processing center and carrying out the international or national technical audit (further - Rules).
2. In these rules the following basic concepts are used:
1) data-processing center (further - DPC) - the object of information and communication infrastructure providing failure-safe and smooth functioning of computing resources and the telecommunication equipment, and also storage systems and data processing;
2) national technical audit of data-processing center - voluntary assessment of reliability of data-processing centers;
3) authorized body in the field of communication (further - authorized body) - the central executive body determined by the Government of the Republic of Kazakhstan, enabling the realization of state policy in the field of communication, the state control, coordination and regulation of activities of persons providing services in the field of communication or using them;
4) the operational center of information security (further - OTsIB) - the legal entity or structural division of the legal entity performing activities for protection of electronic information resources, information systems, networks of telecommunications and other objects of informatization;
5) classification of levels of reliability of DPC (further - classification of DPC by level) - the standardized system of ranging used for classification of DPC on the basis of time of its idle time, no-failure operation and reliability;
6) the owner of DPC - the legal entity registered in the territory of the Republic of Kazakhstan or the physical person having on the property right of DPC;
7) the owner of DPC - the legal entity registered in the territory of the Republic of Kazakhstan or the physical person receiving in temporary ownership and use of DPC;
8) Need (from the English word need - further N) is necessary certain quantity of units of equipment and systems without which the DPC will not be able regularly to function.
3. The DPC is intended for:
1) ensuring failure-safe and smooth functioning of computing resources and telecommunication equipment;
2) storages and data processing.
4. The DPC shall be located in the separate building and (or) construction or specially equipped part of the building, construction.
DPCs are placed in separate buildings and (or) constructions or specially equipped part of the building protected from natural disasters (earthquakes, floods and other natural hazards) with proper waterproofing and ventilation for maintenance of optimum operating conditions of the computing and telecommunication equipment, availability of system of the fire safety including automatic detection and fire extinguishing, availability of the control system of access and video surveillance for ensuring physical safety.
5. Buildings and (or) constructions or specially equipped parts of the building, constructions shall conform to requirements of Single requirements in the field of information and communication technologies and the ensuring information security approved by the order of the Government of the Republic of Kazakhstan of December 20, 2016 No. 832.
6. DPCs are classified by levels and share on:
1) Tier I - 99,671 of % or 1729 minutes of idle time in year.
The DPC of the Tier I level is basic level of handling capacity of infrastructure for support of information technologies.
Tier I includes:
(the scheme of reservation of N) equipment failures or repair work lead to stop of work of all DPC. In DPC there are no hollow floors, reserve sources of electric utility service and uninterruptible power supply units. Engineering infrastructure is not reserved;
2) Tier II - 99,741 of % or 1361 minutes of idle time in year.
The DPC of the Tier II level provides the food and chilling guaranteeing higher quality of servicing and safety in case of failures.
Tier II includes:
(the scheme of reservation - N + 1) the minimum level of reservation, in DPC surely are available hollow floors and reserve sources of electric utility service and chilling, however carrying out repair work also causes stop of work of DPC;
3) Tier III - 99,982 of % or 95 minutes of idle time in year.
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions. This section provides answers to questions set by users.