of October 24, 2022 No. 583
About approval of the Regulations on conditions and procedure of activities for development and delivery of electrical energy with use of renewable energy resources
For the purpose of realization of Items 1, of 4,11 of part of 1 Article 8, of Item 12 of Article 9, of part 2 of article 17 of the Law of the Kyrgyz Republic "About renewable energy resources", according to articles 13, of the 17th constitutional Law of the Kyrgyz Republic "About the Cabinet of Ministers of the Kyrgyz Republic" the Cabinet of Ministers of the Kyrgyz Republic decides:
1. Approve Regulations on conditions and procedure of activities for development and delivery of electrical energy with use of renewable energy resources, according to appendix.
2. Determine authorized state body by development and support of use of renewable energy resources the Department of Energy of the Kyrgyz Republic.
3. To Department of Energy of the Kyrgyz Republic to take the necessary measures following from this resolution.
4. Declare invalid the order of the Government of the Kyrgyz Republic "About approval of the Regulations on conditions and procedure of activities for development and delivery of electrical energy with use of renewable energy resources" of October 30, 2020 No. 525.
5. To impose control of execution of this resolution on management of control of execution of decisions of the President and the Presidential Administration Cabinet of Ministers of the Kyrgyz Republic.
6. This resolution becomes effective after seven days from the date of official publication.
Chairman of the Cabinet of Ministers of the Kyrgyz Republic
A. Zhaparov
Appendix
to the Resolution of the Cabinet of Ministers of the Kyrgyz Republic of October 24, 2022 No. 583
1. This Provision is developed according to the Laws of the Kyrgyz Republic "About power", "About power industry", "About renewable energy resources" and determines conditions and procedure of activities for development and delivery of electrical energy with use of renewable energy resources within the established rates for all types of the energies made with use of renewable energy resources (further - RES).
This Provision which provide tariff preferences extends to new objects with use of RES from the moment of RES installation commissioning.
2. In this Provision the following basic concepts are applied:
1) types of the modes of activities in the field of RES - the modes of development and delivery of the electrical energy made with use of RES (delivery of electrical energy with use of RES in power network, with the raising coefficient, delivery of electrical energy with use of RES on contractual basis, development of electrical energy with use of RES for own needs);
2) delivery of electrical energy with use of RES in power network, with the raising coefficient - activities mode type in the field of RES in case of which delivery by the subject of RES of the electrical energy made with use of the RES installations is performed on the maximum rate for final consumers, using the raising coefficient within grace period according to the Law of the Kyrgyz Republic "About renewable energy resources";
3) delivery of electrical energy with use of RES on contractual basis - activities mode type in the field of RES in case of which delivery by the subject of RES of the electrical energy made with use of the RES installations is performed to the buyer with whom the subject of RES consists in contractual relations according to the Civil code of the Kyrgyz Republic, at the price determined by the parties independently;
4) development of electrical energy with use of RES for own needs - activities mode type in the field of RES in case of which the electrical energy made with use of the RES installations is used in own purposes (for own needs) and rates are not established;
5) Ceased to be valid according to the Resolution of the Cabinet of Ministers of the Kyrgyz Republic of 19.01.2023 No. 22
6) the subject of RES - the legal entities, foreign legal entities, individual entrepreneurs (physical persons, including foreign) who expressed intention and/or performing activities in the field of production (all types of the modes), deliveries (sale) of the electrical energy developed with use of RES;
7) object of RES - the technical devices intended for production of electrical and (or) heat energy with use of RES, and constructions, and the infrastructure technology necessary for operation of object for use of RES and RES which are on balance of the owner of object for use interconnected with them;
8) The RES electric power - the electrical energy developed by the subject of RES with use of RES;
9) RES installation - processing equipment or complex of processing equipment on production or acceptance (obtaining), transformation, accumulation and (or) transfer of the electrical energy made from RES;
10) RES rate - the reduced rate for the RES electric power established by authorized state body on regulation of activities of subjects of fuel and energy complex for the subject of RES according to the legislation of the Kyrgyz Republic in the field of RES;
11) grace period is the time frame calculated from the date of RES installation commissioning, for a period of 15 years;
12) the feasibility statement (further - the feasibility study) - the project documentation containing basic data with the description of the purposes of investment, reasons for investment soundness including: the expected economic, social and (or) commercial effect of functioning of the power station with use of RES, and also, data on the key technical and technology parameters of construction object and calculations with determination of technical and economic indicators of object;
13) the preliminary feasibility statement (further - the prefeasibility study) - intermediate stage between research of opportunities of the project and the detailed feasibility study. The PREFEASIBILITY STUDY differs from the feasibility study in smaller disaggregation of information, depth of consideration of versions of the project and separate aspects of its implementation taking into account additional carrying out functional researches;
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions. This section provides answers to questions set by users.