The government of the Russian Federation decides:

1. Approve the enclosed Rules of technological accession to trunk gas pipelines.

2. Determine that Federal Antimonopoly Service is the federal executive body establishing the amount of payment for technological accession to trunk gas pipelines of the under construction and reconstructed gas pipelines intended for gas transportation from trunk gas pipelines to capital construction projects, and the gas pipelines intended for gas transportation from natural gas fields to trunk gas pipeline.

3. This resolution becomes effective from the date of its official publication, except for Item 1, which becomes effective on September 1, 2023 and 6 years are effective.

Russian Prime Minister

M. Mishustin

Approved by the Order of the Government of the Russian Federation of November 1, 2021 No. 1898

Rules of technological accession to trunk gas pipelines

I. General provisions

1. These rules determine procedure for non-discriminatory access to services in technological accession to trunk gas pipelines of the under construction and reconstructed gas pipelines intended for gas transportation from trunk gas pipelines to capital construction projects, and the gas pipelines intended for gas transportation from natural gas fields to trunk gas pipeline (further - the gas pipeline).

2. For the purposes of these rules the following concepts are used:

"applicant" - the legal entity or the individual entrepreneur, intended to perform technological connection of the gas pipeline to trunk gas pipeline;

"contractor" - the gas transmission organization owning on the property right or on other legal cause trunk gas pipeline to which technological connection of the gas pipeline of the applicant is planned;

"trunk gas pipeline" - the single technologically indivisible, on a centralized basis managed property industrial complex consisting of the interconnected objects which are its integral technological part intended for transportation of natural gas from gas points of entry in trunk gas pipeline to gas discharge points from trunk gas pipeline and the MPa having the working pressure of gas from 1,2 and above;

"technological accession" - set of the organizational and technical actions including accomplishment of actions for technological connection of the gas pipeline to trunk gas pipeline (further - actions for technological accession) and supply of gas in gas point of entry in trunk gas pipeline or gas discharge point from trunk gas pipeline;

"connection point" - junction of the attached gas pipeline with trunk gas pipeline in gas point of entry in trunk gas pipeline or gas discharge point from trunk gas pipeline;

"the actual accession" - complex of the technical actions providing physical connection (contact) of the attached gas pipeline and trunk gas pipeline.

3. Technological connection of the gas pipeline to trunk gas pipeline is performed in the following procedure:

a) the direction the applicant to the contractor of the request for technological connection of the gas pipeline to trunk gas pipeline (further - the request for connection);

b) issue of the contract on technological connection of the gas pipeline to trunk gas pipeline with appendix of the specifications which are its integral part (further respectively - the agreement on connection, specifications), or adoption of the motivated decision on refusal in its issue;

c) conclusion of the agreement on connection;

d) accomplishment by the applicant and contractor of specifications;

e) implementation by the contractor of the actual accession;

e) signing of the act of implementation of technological connection of the gas pipeline to trunk gas pipeline containing information on differentiation of property accessory and operational responsibility of the parties (further - the act of connection).

4. Technological accession to trunk gas pipeline of the gas pipeline intended for gas transportation from trunk gas pipeline to capital construction project is possible to provide only in case of confirmation of lack of technical capability by the regional gas-distributing organization gas transportation load necessary for the applicant with required pressure on the gas distribution networks belonging to the specified gas-distributing organization, the gas pipelines which except for are under construction or reconstructed intended for gas transportation from trunk gas pipeline to capital construction projects which specifications of technological accession are issued to applicants before entry into force of these rules.

II. Procedure for technological accession to trunk gas pipelines

5. For the purpose of technological connection of the gas pipeline to trunk gas pipeline the applicant sends to the contractor the mailing or electronically by means of the official site of the contractor on the Internet (further - the official site) the request for connection constituted in a free form.

6. The request for connection shall contain:

a) the applicant's details (for legal entities - full name and the state registration number of entry in the Unified State Register of Legal Entities, date of its entering into the specified register, the location address, contact telephone number and the fax, the e-mail address (in the presence), for individual entrepreneurs - the state registration number of entry in the Unified State Register of Private Entrepreneurs, date of its entering into the specified register, the residential address, contact telephone number and the fax, the e-mail address (in the presence);

b) expected points of connection to trunk gas pipeline;

c) the planned maximum transportation load of gas on the gas pipeline in connection point;

d) quality characteristics and parameters of the gas which is subject to transportation on trunk gas pipeline;

e) terms of designing and commissioning of the gas pipeline, including on stages and queues;

e) annual scope of supply of gas applicant or amount of selection by the applicant of gas;

g) expected start and end dates of supply (selection) of gas by the applicant;

h) terms of designing and commissioning of capital construction project to which it is performed gas transportation on the applicant's gas pipeline, including on stages and queues (is planned);

i) data on technical characteristics of the gas-using equipment installed (established) on capital construction project to which it is performed gas transportation on the applicant's gas pipeline (is planned);

j) data on possibility of operation on reserve fuel of the gas-using equipment installed (established) on capital construction project to which it is performed gas transportation on the applicant's gas pipeline (is planned) (are specified in cases, stipulated by the legislation to the Russian Federation about gas supply).

Warning!!!

This is not a full text of document! Document shown in Demo mode!

If you have active License, please Login, or get License for Full Access.

With Full access you can get: full text of document, original text of document in Russian, attachments (if exist) and see History and Statistics of your work.

Get License for Full Access Now

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.

Search engine created by SojuzPravoInform LLC. UI/UX design by Intelliants.