Unofficial transfer (c) Soyuzpravoinform LLC
of June 24, 2022 No. 722
Some questions of implementation of allowing and registration procedures in construction in the conditions of warlike situation
According to article 12-1 of the Law of Ukraine "About legal regime of warlike situation" the Cabinet of Ministers of Ukraine decides:
1. Determine that rendering services in questions of allowing and registration procedures in construction is performed taking into account the following features:
1) for action of warlike situation in Ukraine and within one year from the date of the termination or cancellation of warlike situation:
the construction of individual (farmstead) apartment houses, garden, country houses is not higher than two floors (without the mansard floor) up to 500 sq.m, economic buildings and constructions, garages, elements of improvement and gardening of the parcel of land according to the decision of the customer according to town-planning documentation at the local level, and in case of lack of the approved town-planning documentation at the local level - according to the purpose of the parcel of land and restrictions in use of lands determined by the Law of Ukraine "About protection of cultural heritage" can be performed by the customer without receipt of the construction passport of building of the parcel of land.
In that case the customer addresses the architect or the design engineer who has the appropriate qualification certificate, based on the agreement signed between them, the architect or the design engineer provides creation and/or loading in Single state electronic system in the field of construction (further - Electronic system) with imposing of the qualified digital signature of the scheme of intentions of the building of the parcel of land (location of buildings and constructions on the parcel of land, distances to borders of the next parcels of land and objects located on them, engineering networks and constructions, facades and plans of floors of objects with indication of overall dimensions, the list of systems of engineering support, including autonomous, planned to application, etc.) created with observance of requirements of the legislation, construction regulations and rules.
The term of performance of works, the size and payment procedure of works are determined in the agreement by agreement of the parties.
At the same time during submission of the notification on the beginning of accomplishment of construction works the customer specifies registration number of the scheme of intentions of building of the parcel of land in Electronic system;
in case of failure to provide by the relevant authorized body town planning and architecture of town-planning conditions and restrictions of building of the parcel of land or rejection of the decision on refusal in their provision within ten working days from the date of registration of a statement about their issue designing of construction object is performed without receipt of town-planning conditions and restrictions according to town-planning documentation at the local level and restrictions in use of the lands determined by the Law of Ukraine "About protection of cultural heritage";
development of the project documentation on construction of facilities with a conditional height not higher than 20 meters at distance at least 1 kilometer from side border of flight strip and 2 kilometers from end faces of flight strip is performed without approval of the operator of airfield, the Public air service or the Ministry of Defence. The specified provision extends also to the town-planning conditions and restrictions issued before entry into force of the resolution of the Cabinet of Ministers of Ukraine of December 23, 2021 to No. 1427 "Questions of use of aerodrome environs" (The Official Bulletin of Ukraine, 2022, No. 4, the Art. 192).
If town-planning conditions and restrictions are issued before entry into force of the resolution of the Cabinet of Ministers of Ukraine of December 23, 2021 to No. 1427 "Questions of use of aerodrome environs" (The Official Bulletin of Ukraine, 2022, No. 4, of the Art. 192), on construction of facilities with a conditional height below 20 meters and at distance less than 1 kilometer from side border of flight strip and 2 kilometers from the end faces of flight strip containing the requirement about approval of placement of construction object on aerodrome environs, the customer addresses to the Public air service or the Ministry of Defence (according to competence) for receipt of such approval of the statement in which specifies data according to Item 5 of the Procedure for determination in town-planning conditions and limiting restrictions of height and planning restrictions of building of the parcels of land on aerodrome environs and information exchange for this purpose, the Cabinet of Ministers of Ukraine approved by the resolution of December 23, 2021 No. 1427 (The Official Bulletin of Ukraine, 2022, No. 4, the Art. 192). The public air service or the Ministry of Defence according to Items 6 - 20 specified About provides to the customer the conclusion about the extreme height of objects on aerodrome environs.
The procedure for determination in town-planning conditions and limiting restrictions of height and planning restrictions of building of the parcels of land on aerodrome environs of airfields of the state aircraft in the conditions of warlike situation is performed according to the resolution of the Cabinet of Ministers of Ukraine of December 23, 2021 No. 1427 "Questions of use of aerodrome environs" (The Official Bulletin of Ukraine, 2022, No. 4, the Art. 192);
statements for issue of town-planning conditions and restrictions of building of the parcel of land, construction passports of building of the parcel of land move at the choice of the customer of the relevant authorized body concerning town planning and architecture personally through the center of provision of administrative services or through electronic office in Electronic system by representation by means of the software of the Single state web portal of electronic services or filled and go the registered mail with the inventory of investment to the center of provision of administrative services. The applications submitted through the centers of provision of administrative services are transferred to the relevant authorized body concerning town planning and architecture only with use of electronic office of the employee of the center of provision of administrative services in Electronic system. Results of consideration of such statements are transmitted to the center of provision of administrative services only with use of electronic office of authorized body concerning town planning and architecture in Electronic system;
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions. This section provides answers to questions set by users.