ORDER OF THE GOVERNMENT OF THE RUSSIAN FEDERATION

of July 5, 2018 No. 787

About connection (technological accession) to systems of heat supply, non-discriminatory access to services in the sphere of heat supply, change and recognition voided some acts of the Government of the Russian Federation

(as amended on 30-01-2021)

According to the Federal Law "About Heat Supply" Government of the Russian Federation decides:

1. Approve enclosed:

Rules of connection (technological accession) to systems of heat supply, including rules of non-discriminatory access to services in connection (technological accession) to systems of heat supply;

Rules of non-discriminatory access to services in transfer of heat energy, heat carrier;

changes which are made to acts of the Government of the Russian Federation.

2. Recognize invalid:

the order of the Government of the Russian Federation of April 16, 2012 No. 307 "About procedure for connection to systems of heat supply and about introduction of amendments to some acts of the Government of the Russian Federation" (The Russian Federation Code, 2012, No. 17, the Art. 1981);

Item of 1 changes which are made to acts of the Government of the Russian Federation concerning implementation of federal state energy supervision, approved by the order of the Government of the Russian Federation of January 18, 2017 No. 32 "About introduction of amendments to some acts of the Government of the Russian Federation concerning implementation of federal state energy supervision" (The Russian Federation Code, 2017, No. 4, the Art. 676);

Item of 2 changes which are made to acts of the Government of the Russian Federation concerning establishment of first-priority requirements of energy efficiency for buildings, structures, constructions approved by the order of the Government of the Russian Federation of March 7, 2017 No. 275 "About introduction of amendments to some acts of the Government of the Russian Federation concerning establishment of first-priority requirements of energy efficiency for buildings, structures, constructions" (The Russian Federation Code, 2017, No. 12, the Art. 1719);

Item of 1 changes which are made to acts of the Government of the Russian Federation regarding optimization of procedure for connection to systems of heat supply, approved by the order of the Government of the Russian Federation of September 9, 2017 No. 1089 "About introduction of amendments to some acts of the Government of the Russian Federation regarding optimization of procedure for connection to systems of heat supply" (The Russian Federation Code, 2017, No. 38, the Art. 5626);

Item of 3 changes which are made to acts of the Government of the Russian Federation, approved by the order of the Government of the Russian Federation of April 12, 2018 No. 448 "About introduction of amendments to some acts of the Government of the Russian Federation" (The Russian Federation Code, 2018, No. 17, the Art. 2492).

Russian Prime Minister

D. Medvedev

Approved by the Order of the Government of the Russian Federation of July 5, 2018 No. 787

Rules of connection (technological accession) to systems of heat supply, including rules of non-discriminatory access to services in connection (technological accession) to systems of heat supply

I. General provisions

1. These rules determine procedure for connection (technological accession) for the heatconsuming installations, thermal networks and sources of heat energy to systems of heat supply, and also procedure for ensuring non-discriminatory access to services in connection (technological accession) to systems of heat supply.

Non-discriminatory access to services in connection (technological accession) to systems of heat supply provides equal conditions of provision of the specified services to their consumers.

2. For the purposes of these rules the used concepts mean the following:

"the act of connection" - the document confirming connection completion including data on balance sheet accessory (limits of the Section of thermal networks, the heatconsuming installations and sources of heat energy on the basis of ownership on the property right or on other legal cause are specified) and operational responsibility;

"the act of readiness of on-site and intra house networks and the equipment of the connected object to giving of heat energy and the heat carrier" - the document confirming accomplishment by the applicant of conditions of connection;

antimonopoly authority - federal antimonopoly authority and its territorial authorities;

"the connected object" - the building, structure, construction or other capital construction project on which consumption of heat energy, thermal networks or source of heat energy is provided;

"connection" - set of the organizational and technical actions giving the chance to the connected object after connection (technological accession) to system of heat supply to consume heat energy from this system of heat supply, to provide transfer of heat energy on adjacent thermal networks or to issue the heat energy made on source of heat energy in system of heat supply;

"reserve of handling capacity of thermal networks" - difference between the maximum handling capacity of thermal networks from source of heat energy to point of accession and the amount of thermal loadings of objects of the consumers connected to system of heat supply by means of thermal networks from source of heat energy to point of accession, thermal loads of the consumers connected to system of heat supply by means of thermal networks from source of heat energy to point of accession, reserved under agreements of rendering services in maintenance of stand-by thermal power, and thermal loadings concerning which specifications of connection of capital construction project to networks of engineering facilities according to Rules of determination and provision of specifications of connection of capital construction project to networks of engineering facilities are issued approved by the order of the Government of the Russian Federation of February 13, 2006 No. 83 "About approval of Rules of determination and provision of specifications of connection of capital construction project to networks of engineering facilities and Rules of connection of capital construction project to networks of engineering facilities" on which during the period to the direction of the answer to the request of the applicant of the obligation of the organization which issued specifications did not stop;

"reserve of capacity of source of heat energy" - difference between the located thermal power of source of heat energy and the amount of thermal loadings of objects of the consumers connected to system of heat supply by means of thermal networks from source of heat energy to point of accession, thermal loads of the consumers connected to system of heat supply by means of thermal networks from source of heat energy to point of accession, reserved under agreements of rendering services in maintenance of stand-by thermal power, and thermal loadings concerning which specifications of connection of capital construction project to networks of engineering facilities according to Rules of determination and provision of specifications of connection of capital construction project to networks of engineering facilities are issued approved by the order of the Government of the Russian Federation of February 13, 2006 No. 83 "About approval of Rules of determination and provision of specifications of connection of capital construction project to networks of engineering facilities and Rules of connection of capital construction project to networks of engineering facilities" on which during the period to the direction of the answer to the request of the applicant of the obligation of the organization which issued specifications did not stop;

"connection point" - the place of physical connection of thermal networks of the contractor and thermal networks of the applicant, for the apartment house - networks of engineering facilities of the house with thermal networks of the contractor, established according to the agreement on connection to system of heat supply on border of the parcel of land of the connected object, in case of connection of the apartment house - on border of networks of engineering facilities of the house. In case of connection of complex building the point of connection is determined for each capital construction project which is part of complex building, including for the apartment house - on border of networks of engineering facilities of the house, for objects of municipal, social, transport infrastructure - on border of the parcel of land of the connected object according to the boundary-setting plan;

"accession point" - the place of physical connection of thermal networks, actions for which creation are performed within agreement performance about connection to system of heat supply, with the existing thermal networks of the contractor, and in case, stipulated in Item 5 these rules, - with the existing thermal networks or sources of heat energy belonging on the property right or on other legal cause to the persons who are not rendering service in transfer of heat energy and (or) not performing sale of heat energy;

"applicant" - person having intention to connect object to system of heat supply, and also the heatsupplying or heatnetwork organization in case, stipulated in Item 3 these rules;

"contractor" - the heatsupplying or heatnetwork organization owning on the property right or on other legal cause by thermal networks and (or) sources of heat energy to which it is direct or through thermal networks and (or) sources of heat energy of other persons is performed connection;

"the adjacent organizations" - the organizations owning on the property right or on other legal cause by technologically related thermal networks and (or) sources of heat energy in system of heat supply. The adjacent organization for the purpose of these rules is understood as also individual entrepreneur owning on the property right or on other legal cause by technologically related thermal networks and (or) sources of heat energy in system of heat supply;

"technologically related networks and (or) sources of heat energy" - the thermal networks and (or) sources of heat energy having mutual points of connection belonging on the property right or on other legal cause to the adjacent organizations and participating in single technological system of heat supply;

"connection conditions" - the integral part of the agreement on connection to system of heat supply providing the technical actions which are carried out by the parties for connection implementation and also other technical parameters (connection points, the maximum sentries and hourly average thermal loadings of the connected object by types of heat carriers and types of heatconsumption, the scheme of connection of the heatconsuming installations, parameters of heat carriers, etc.);

the statement for renewal of conditions of connection" - the statement of the consumer of heat energy, the owner or other legal owner of the heatconsuming installations which are earlier connected to the system of heat supply located in the settlement, the city district carried to price zone of heat supply on recovery (renewal) of conditions of connection to the system of heat supply located in the settlement, the city district carried to price zone of heat supply for the purpose of use of the specified conditions of connection to system of heat supply by consideration by local government bodies of the disagreements arising between the single heatsupplying organization and the consumer of heat energy in case of determination in the agreement of heat supply of parameter values of quality of heat supply and (or) parameters reflecting admissible breaks in heat supply.

Within these rules the consumer who filed petition for renewal of conditions of connection is applicant for the purpose of renewal of conditions of connection.

3. The agreement on connection to system of heat supply (further - the agreement on connection) is public for the heatsupplying organizations, the heatnetwork organizations, including the single heatsupplying organization.

Warning!!!

This is not a full text of document! Document shown in Demo mode!

If you have active License, please Login, or get License for Full Access.

With Full access you can get: full text of document, original text of document in Russian, attachments (if exist) and see History and Statistics of your work.

Get License for Full Access Now

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.

Search engine created by SojuzPravoInform LLC. UI/UX design by Intelliants.