ORDER OF THE CHAIRMAN OF COMMITTEE ON CASES OF THE CONSTRUCTION AND HOUSING AND COMMUNAL SERVICES OF THE MINISTRY FOR INVESTMENTS AND DEVELOPMENT OF THE REPUBLIC OF KAZAKHSTAN

of November 14, 2017 No. 249-HK

About approval of regulating documents on pricing in construction

(as amended on 27-07-2021)

According to subitem 6-2) of article 20 of the Law of the Republic of Kazakhstan "About architectural, town-planning and construction activities in the Republic of Kazakhstan", the subitem 506) of Item 16 of the Regulations on the Ministry of the industry and the infrastructure development of the Republic of Kazakhstan approved by the order of the Government of the Republic of Kazakhstan of December 29, 2018 No. 936, I ORDER:

1. Approve the following regulating documents on pricing in construction:

1) the regulating document by determination of estimated cost of construction in the Republic of Kazakhstan according to appendix 1 to this order;

2) the regulating document by determination of size of overheads and estimate profit in construction according to appendix 2 to this order;

3) the regulating document by determination of the additional costs connected with solutions of the project of the organization of construction according to appendix 3 to this order;

4) the regulating document on cost determination on engineering services in construction according to appendix 4 to this order.

5) the regulating document on cost determination of project works for construction in the Republic of Kazakhstan according to appendix 5 to this order;

6) the regulating document on cost determination of engineering researches for construction in the Republic of Kazakhstan according to appendix 6 to this order;

7) the regulating document on constructive and technological group of data in estimate documentation according to appendix 7 to this order;

8) the regulating document by determination of estimated cost of construction within realization of pilot project according to appendix 8 to this order;

9) the regulating document by determination of estimated cost of commissioning when commissioning construction objects in the Republic of Kazakhstan according to appendix 9 to this order.

2. Declare invalid the order of the chairman of Committee on cases of construction, housing and communal services and management of land resources of the Ministry of national economy of the Republic of Kazakhstan of July 3, 2015 No. 235-nk "About approval of the state standard rates on pricing and estimates" (registered in the Register of state registration of regulatory legal acts for No. 11905, published on September 25, 2015 in information system of law of Ad_let).

3. To provide to management of estimate norms in construction of Committee on cases of construction and housing and communal services of the Ministry for Investments and Development of the Republic of Kazakhstan:

1) state registration of this order in the Ministry of Justice of the Republic of Kazakhstan;

2) within ten calendar days from the date of state registration of this order the direction it the copy on paper and electronically in the Kazakh and Russian languages in the Republican state company on the right of economic maintaining "The republican center of legal information" for official publication and inclusion in Reference control bank of regulatory legal acts of the Republic of Kazakhstan;

3) within ten calendar days after state registration of this order the direction it the copy on official publication in periodic printing editions;

4) placement of this order on Internet resource of Committee on cases of construction and housing and communal services of the Ministry for Investments and Development of the Republic of Kazakhstan;

5) within ten working days after state registration of this order in the Ministry of Justice of the Republic of Kazakhstan submission to Legal support division of Committee on cases of construction and housing and communal services of the Ministry for Investments and Development of the Republic of Kazakhstan of data on execution of actions, according to subitems 1), 2), 3) and 4) this Item.

4. To impose control of execution of this order on the supervising vice-chairman of Committee on cases of construction and housing and communal services of the Ministry for Investments and Development of the Republic of Kazakhstan.

5. This order becomes effective after day of its first official publication.

Chairman of Committee on cases of construction and housing and communal services of the Ministry for Investments and Development of the Republic of Kazakhstan

M. Zhayymbetov

Appendix 1

to the Order of the Chairman of Committee on cases of construction and housing and communal services of the Ministry for Investments and Development of the Republic of Kazakhstan of November 14, 2017 No. 249-HK

The regulating document by determination of estimated cost of construction in the Republic of Kazakhstan

Chapter 1. General provisions

1. This Regulating document by determination of estimated cost of construction in the Republic of Kazakhstan (further – the Regulating document) No. 242 "About architectural, town-planning and construction activities in the Republic of Kazakhstan" is developed according to subitem 6-2) of article 20 of the Law of the Republic of Kazakhstan of July 16, 2001 and it is intended for determination of estimated cost of construction in case of development of preproject, project (project and estimate) documentation on the objects built due to the state investments into construction and means of subjects of the quasi-public sector.

2. The main objectives of estimate regulation and pricing in construction are:

ensuring costs planning on construction, its organizations and financing;

ensuring reliability of feasibility statements and determination of estimated cost of construction (new, expansions, reconstruction, upgrades, modernization, the major repair existing) the companies, buildings and constructions;

providing through system of regulating documents on pricing and estimate regulation of cost determination of construction (new, expansions, reconstruction, upgrades, modernization, the major repair existing) the companies, buildings, constructions, reflected in estimate documents;

increase in investment soundness, optimization of expenditure of financial resources.

3. In total with rules, regulating documents and recommendations about development and application of estimate standard rates, determination of estimated cost of construction all estimate standard rates form system of estimate standard rates and pricing in construction.

Estimate standard rates are the generalized name of the complex of regulating documents on pricing and estimates which is basis for determination of estimated cost of construction and including:

regulating documents, methodical instructions, instructions and recommendations about cost determination of construction of facilities, to cost determination of the other works and services accompanying construction (project works, engineering researches, engineering services);

estimate norms for the works in construction established on the accepted measuring instrument;

estimate norms on the separate expenses and costs in construction expressed percentage of the accepted accrual base;

the enlarged estimate norms;

the enlarged cost indexes;

estimate prices of construction resources;

estimate prices of transportation of goods;

the prices of project works for construction;

the prices of engineering researches for construction.

Estimate standard rates are intended for determination of cost structure on production of construction, installation works, construction materials, products, designs, the equipment and other costs for the purpose of asset construction on the project approved by the customer.

4. If necessary estimate standard rates are used for economic evaluation and comparison of separate project decisions, and also for the analysis of structural changes of investments.

5. In this Regulating document the following basic concepts are used:

1) current prices – the prices of construction resources of the specific period;

2) unexpected works and costs – the expenses sent to the covering period on payment of expenses and actions of the amounts connected with refining in the course of construction and cost of building and construction works which nature and methods of accomplishment could not be determined when designing owing to their unexpectedness and also in case of detection in the course of construction of mistakes in approved (passed the examination) the design estimates and identification of the works and costs which are not considered in workshop drawings and/or estimate documentation;

3) construction – artificially created three-dimensional, plane or linear object (land, surface and (or) underground, underwater) having natural or artificial space borders and intended for accomplishment of production processes, placement and storage of material values or temporary stay (movement) of people, loads, and also placement (laying, posting) the equipment or communications. The construction also has art and esthetic, arts and crafts or memorial assignment.

Also motor-roads, power lines and communications, main pipelines belong to linear constructions iron;

4) major repair of buildings and constructions – works on recovery or replacement of separate parts of buildings (constructions) or the whole designs, details and the technical equipment in connection with their physical wear and destruction on more long-lasting and economic, improving them operational indicators;

5) the plumbing system of buildings (constructions) – complex of the engineering systems and engineering devices creating comfortable conditions of accommodation (life), labor activity (stay) of people, providing preserving material values, and also engineering support of processing equipment and production processes. The plumbing system of buildings (constructions) includes devices of water supply systems (cold and hot), sewerages, heating, ventilation, air conditioning, gas supply, electric equipment, hoisting-and-transport devices (elevators, escalators), means of rubbish disposal, vacuum cleaning, fire extinguishing, the alarm system, installation of telephones, radiofication and other types of internal improvement;

6) the equipment – the processing and plumbing system of objects of buildings (constructions);

7) new construction – construction of separate objects, buildings and constructions, complex of objects of the basic, the subsidiary and servicing purpose of the newly created companies, separate productions which after commissioning will be on separate balance, performed on new platforms for the purpose of creation of new object or new production capacity, construction on new site of the company of the same or bigger capacity (performance, handling capacity, capacity of the building or construction) instead of the liquidated company;

8) expansion of operating plant, the building or construction (further – object) – construction of additional productions, the areas, capacities on the operating object, and also construction new and expansion of the existing certain workshops and objects of the basic, the subsidiary and servicing purpose in the territory of the operating objects or the platforms adjoining them for the purpose of creation of additional or new production capacities. Also the construction of the branches and productions which are their part which after commissioning will not be on separate balance belongs to expansion of the operating objects. If in the course of project study need and economic feasibility along with expansion of object to perform reconstruction of the operating workshops and objects of the basic came to light, the subsidiary and servicing purpose, the corresponding works and costs are included the project of expansion of object. At the same time works and costs on reconstruction of the operating workshops and objects vklyuchayuts I in estimate and summary estimate calculations separately;

9) reconstruction of operating plant, the building or construction – object reorganization on the single complex project without construction new and expansions of the existing objects and workshops of basic purpose, directed to increase in production volume, receipt of new products, enhancement of production and improvement of its technical and economic level, operating conditions and environmental protection, based on modern achievements of scientific and technical progress; reorganization of the building or construction for improvement of its functioning with changes of the main technical and economic indicators (quantity and the area of apartments, total structural volume and total area of the building, capacity or handling capacity or its assignment), change of the layout of rooms, construction of superstructures, integrations and extensions;

10) building – set of buildings and constructions (objects), of different function (production, social, transport and other infrastructure) which construction is performed according to the single design estimates with summary estimate calculation of construction cost;

11) pricing in construction – the mechanism of formation of cost of construction products;

12) construction queue – the part of construction consisting of one or several start-up complexes of group of buildings or constructions which input in operation provides production or rendering the services provided by the project. The design estimates in turn of construction are subject to approval, as as a part of building, and the separate project;

13) construction resources – costs of work of workers and drivers, time of operation of construction site engines and mechanisms, construction materials, products and designs, the equipment;

14) material resources – construction materials, products, designs;

15) the estimate of the contractor (offer) – the estimate documentation as a part of the competitive proposal of the contractor constituted by it taking into account own organizational technological capability for participation in tenders on purchase of contractor's work and services;

16) object – the separate building or construction with all arrangements relating to it, the equipment, furniture, stock, subsidiary and auxiliary devices, with the engineering networks and all-areal materials adjoining to it, or set of the buildings and constructions having general technological or other purpose;

17) construction of facilities – new construction, reconstruction, upgrade, expansion of the companies, buildings and constructions, modernization of the companies, major repair of buildings and constructions;

18) the price list (price list) is the official and (or) reference media containing the systematized list of materials, products, the equipment, production operations, services with indication of the prices, and sometimes and short characteristics;

19) resource method – method of cost determination of construction by calculation in current prices and rates of cost elements (resources) necessary for project implementation of construction;

20) authorized body for architecture, town planning and construction – the central state body performing management in the field of public administration of architectural, town-planning and construction activities;

21) the project – the intention of physical persons and legal entities on providing necessary conditions of dwelling and life activity of the person provided in the form of architectural, town-planning and construction documentation (drawings, graphical and text materials, engineering and estimate calculations), including the feasibility statement on construction, and (or) the design estimates disclosing essence of intention and possibility of its practical realization;

22) the preproject documentation – the documentation which is preceding development of town-planning, architectural projects, the construction project and including programs, reports, feasibility statements on construction, technical and economic calculations, results of scientific research and engineering researches, technological and constructive calculations, sketches, prototypes, measurements and results of inspections of objects, and also other basic data and materials necessary for decision making about development of the project documentation and the subsequent projects implementation;

23) project (project and estimate) documentation – documentation containing space-planning, constructive, technology, engineering, nature protection, economic and other solutions, and also estimate calculations for the organization and maintaining construction, engineering training of the territory, improvement;

24) estimate documentation – documentation as a part of the construction project determining the estimated cost of construction;

25) the estimated cost of construction – the money necessary for implementation of asset construction which amount is determined on the basis of project materials and the estimate regulatory base;

26) estimate norms – the resource pool (costs of work of workers of construction, operating time of construction site engines, materials requirement, products and designs) established on the accepted measuring instrument of construction, installation and other works or relative sizes specifying the size of separate expenses and costs in case of construction, expressed percentage of the accepted accrual base;

27) the estimate regulatory base – the state estimate standard rates developed on unified conceptual and methodical basis, jointly existing during certain period of time and constituting the normative legal basis for determination of estimated cost of construction;

28) estimate profit – the amount of means which is normative part of estimated cost of construction, intended for covering of the expenses not attributable to job cost, developments of contract organization, additional material stimulation of her workers;

29) the estimate of the customer (the investor, the builder, the administrator of budget programs) – the estimate documentation constituted on the basis of the state estimate standard rates, intended for planning of investing activities and determination of limit of means of the customer for asset construction and also carrying out purchases of works and services in construction;

30) modernization – complex of actions for increase in technical and economic level of separate productions, workshops and sites of operating plants on the basis of implementation of advanced technology and the new equipment, mechanization and automation of production, upgrade and replacement of obsolete and physically worn-out equipment new, more productive, and also on enhancement of economic and auxiliary services of the company;

31) processing equipment – the processing lines, machines, installations, devices, machines, mechanisms, devices and other devices making different engineering procedures as a result of which energy is made is developed semifinished product, ready-made product or their movement, and also processes accompanying them providing management automation with engineering procedures, functions of communication and control is provided; the sanitary appliances connected with ensuring operation of processing equipment and engineering procedures; the banding pipelines delivered complete with the capital equipment, pipeline fittings, metal designs, sites of cables, measuring with the cut ends; the initial fund of the tool, industrial equipment and stock, etc. necessary for operation of the enacted companies, buildings and constructions, duplicate parts to the equipment;

32) object analog – the object similar (comparable) to designed project in the functional purpose and technical characteristics and having the most effective technical and economic indicators as an example;

33) overheads – the amount of means for cost recovery of the construction organizations connected with creation of general terms of production, its servicing, the organization and management and also for tax payment and obligatory payments in the budget established by the legislation of the Republic of Kazakhstan, not considered by other components of estimated cost of construction;

34) supervision of erection – organizational technical guidance and supervision from specialists of manufacturer of the equipment of accomplishment by specialists of the customer of mounting works of the equipment before its input in operation and achievements of warranty indicators, carrying out consultations and training of specialists of the customer;

35) the enlarged estimate norms – the derivative estimate norms determining quantity of necessary resources per unit of capacity of object, the enlarged structural components or the enlarged work types;

36) the enlarged cost indexes – the enlarged cost indexes of construction of buildings and constructions per unit of measurement of indicator of capacity of objects (on the building or construction in general, on 1 sq.m of total structural volume of the building, on 1 sq.m of the usable space of the building, on 1 sq.m of reservoir of construction (the reservoir, settler, the pool and so forth), on 1 km of extent of linear construction (power line, the motor-road, the pipeline, cables of electric utility service and communication), on other technical characteristics considering functional purpose of the building, construction), the enlarged indicators of estimated cost of constructs and work types;

37) start-up complex – group of the objects (or their parts) which are part of building or its queue which input in operation provides production or rendering the services accepted by the project, the work environment corresponding to the current legislation for service personnel, environmental protection and normal (according to existing rules) sanitary and epidemiologic operating conditions. The start-up complex represents set of objects or parts of new construction which provide production or rendering the services provided by the project and can independently be operated or in complex with already operating buildings and constructions. The design estimates on start-up complex are subject to approval, as as a part of building, and the separate project;

38) element estimate norms – the estimate norms of primary level determining expense of construction resources on the accepted measuring instrument in natural indicators on accomplishment of separate work types in construction;

39) No. 110-nk is excluded according to the Order of the Chairman of Committee on cases of construction and housing and communal services of the Ministry of the industry and infrastructure development of the Republic of Kazakhstan of 27.07.2021

Chapter 2. The main requirements and conditions of pricing in construction

6. Estimate norms are developed on the basis of process (technical and normalizing) charts on work types, results of time works, standard (single, cross-industry, industry) regulations of work, adaptation of progressive regulations of foreign countries, settlement and analytical methods by results of which the needs for construction resources at the level of element estimate norms, and regulations of the limited costs percentage of the accepted base of their charge are determined.

Estimate norms consider the reached industry average level of the accepted equipment and technology.

In estimate norms the full range of the transactions necessary for accomplishment of certain work type in normal (standard, average) conditions is considered. In case of works in special conditions (constraint, gas contamination, near the operative equipment) the coefficients specified in regulating technical documents on use of estimate norms and technical parts to collections of element estimate norms of expense of resources are applied to estimate norms.

7. The estimate prices of the material resources and resources constituting cost of operation of machines and mechanisms are determined on the basis of monitoring of their current prices by all regions of the Republic of Kazakhstan and used as normative basis for creation of estimate documentation in case of project development of construction.

8. The estimate salary is determined taking into account regulations of the labor law of the Republic of Kazakhstan. The current hour tariff charge is calculated based on available official statistical information.

On objects which construction is planned to be performed by forces of the organizations of oil and gas complex fifty and more percent of voting shares (shares) of which directly or indirectly belong to National welfare fund by the choice of the supplier by method from one source according to the rules approved by the board of directors of National welfare fund based on Item 2 of article 19 of the Law of the Republic of Kazakhstan of February 1, 2012 "About National welfare fund", the estimate salary is determined on the basis of scale of charges of working professions according to internal documents of the organizations, fifty and more percent of voting shares (shares) of which directly or indirectly belong to National welfare fund.

9. Estimated cost of construction is determined in current prices on the basis of design assignment and other basic data of the customer, project (project and estimate) documentation and estimate standard rates.

10. Estimated cost of construction as a part of the preproject documentation (further – estimated cost) is determined according to this Regulating document with use of the enlarged cost indexes of construction of buildings and constructions per unit of measurement of indicator of capacity of objects, on 1 km of extent of linear construction, on other technical characteristics considering functional purpose of the building, construction.

On projects, according to the List of the projects which are not requiring development of the feasibility statement approved by the order of the Government of the Republic of Kazakhstan of December 29, 2009 No. 2225, estimated cost it can be determined by calculation with use of the enlarged cost indexes of construction of buildings and constructions of the existing estimate regulatory base.

11. Estimated cost of construction on blueprint stage is determined according to this Regulating document with use of the enlarged indicators of estimated cost of constructs and work types, element estimate norms of expense of resources and the existing collections of the estimate prices of construction resources.

12. Estimated cost of construction of designed project is created in the current prices operating for date of provision of the project in the expert organization for conducting complex non-departmental examination.

13. Before provision of the project in the expert organization the estimated cost of construction is approved by the customer. Approval is the request of the customer (with indication of its details) on conducting complex non-departmental examination provided in the expert organization according to Rules of conducting complex non-departmental examination of the feasibility statements and the design estimates intended for construction new, and also changes (reconstruction, expansions, modernization, upgrade and major repair) the existing buildings and constructions, their complexes, engineering and transport communications irrespective of financing sources, approved by the order of the Minister of national economy of the Republic of Kazakhstan of April 1, 2015 No. 299 (it is registered in the Register of state registration of regulatory legal acts for No. 10722).

14. After receipt of the positive conclusion of complex non-departmental examination the estimated cost of construction affirms the customer according to the Rules of approval of projects (feasibility statements and the design estimates) intended for construction of facilities at the expense of budgetary funds and other forms of the state investments, approved by the order of the Minister of national economy of the Republic of Kazakhstan of April 2, 2015 No. 304 (it is registered in the Register of state registration of regulatory legal acts for No. 10632), and is the basis for determination of limit of funds of the customer (investor) for implementation of investment projects and/or construction objects.

At preproject stage affirms:

the estimated cost of construction established in feasibility statements – on the objects requiring development of feasibility statements;

the construction cost established by calculation – on the objects which are not requiring development of feasibility statements.

15. Estimated cost of construction is determined by objects which construction is planned in coming (coming) calendar year(s) by breakdown of the volumes of investment on calendar years according to the normative duration and regulations of backlog in construction and indexation of amounts of the forthcoming periods through index of change of monthly settlement indicator. The size of monthly settlement indicator is accepted according to the forecast of social and economic development of the Republic of Kazakhstan for the corresponding five-year period developed annually according to Article 61 of the Budget code of the Republic of Kazakhstan (further – the Forecast of social and economic development of the Republic of Kazakhstan).

16. The contract price of construction fixed in the works agreement is determined according to the legislation in the field of purchases by results of purchases of contractor's work on the basis of the won price proposal of the contractor on its estimate (offer) within the limit of means set by the estimate of the customer.

In case of agreement signature the sheet of contract price determining the total amount of the agreement by results of purchases and being integral part of the agreement is created and signed by the customer and the contractor.

17. The estimate of the contractor (offer) is constituted in current prices based on the estimate of the customer with revaluation of construction resources on the basis of data of the contractor on compensation, cost of operation of construction site engines, the cost of material resources according to the actual transactions, current contracts, or offers on their delivery, on the actual overhead level.

The estimate of the customer is transferred to potential contractors as a part of tender (tender) documentation in the form of the electronic copy in the PDF format and in universal format of representation of basic data and results of calculation of estimates. The description and purpose of format of submission of estimates is given in appendix 1 to the State standard rate on forming and submission of feasibility statements and the design estimates in electronic and digital form in the expert organizations and in Single national electronic bank of preproject and project (project and estimate) documentation on construction of facilities, financed by the state investments and means of subjects of the quasi-public sector, to No. 106-HK approved by the order of the Chairman of Committee on cases of construction, housing and communal services and management of land resources of the Ministry of national economy of the Republic of Kazakhstan of April 21, 2016 (it is registered in the Register of state registration of regulatory legal acts for No. 13736).

In case of creation of the estimate of the contractor based on the estimate of the customer the name and physical amounts of works on the project, standard costs of construction resources, high-quality and quantitative structure of construction materials, products, designs, the equipment for the project (resource part of the estimate of the customer) are left without changes.

By preparation of the estimate of the contractor (offer) the potential supplier of works (contractor) independently chooses those resources on which he offers cost discount. On the major projects incorporating construction objects (buildings and constructions) on all heads of summary estimate calculation, the homogeneous resources included in the estimate of the contractor (offer) are allocated according to each local estimate on the corresponding line items and considered when forming contract price.

Chapter 3. Structure and structure of estimated cost of construction

18. Estimated cost of construction according to structure of investments and procedure for planning and the organization of construction is subdivided on the following work types and costs:

1) building and construction works;

2) equipment costs, furniture and stock;

3) other costs.

20. Building and construction works works according to the List of work types (services) as a part of building and construction works approved by the order of the Minister of national economy of the Republic of Kazakhstan of March 19, 2015 No. 231 are included (it is registered in the Register of state registration of regulatory legal acts for No. 10766).

19. The main requirements to the equipment, furniture, stock, including the individual production intended for ensuring functioning of construction object it is established by the design assignment approved by the customer and also in design process by results of development of appropriate sections of the project.

21. Treats the cost of the equipment, furniture and stock considered in estimates on construction:

1) acquisition value (production) and delivery to priobjektny warehouse:

the complexes of all types mounted or not mounted (processing, utilities, hoisting-and-transport, pumping and compressor and other equipment), the equipment of electronic computer centers, laboratories, masterful of different function, medical offices;

controlling instruments, automation equipment and communication;

the tool, stock, stamps, devices, the equipment, duplicate parts, special containers for transportation of the semifinished products or finished goods included in initial fund of the enacted productions;

the equipment, furniture, stock, the tool and other pieces of internal furniture which are required for initial equipment of hostels, objects of municipal services, education, culture, health care, trade;

the equipment, furniture, stock of external furniture and improvement of the cities and other settlements (street furniture and stock, decorative compositions in the urban environment, and the other figurative small architectural forms of factory production which are not requiring mounting);

2) cost of the non-standard equipment;

3) the cost of supervision of erection (for the equipment delivered on the terms of supervision of erection).

22. Other costs and works are subdivided into the costs and works of the customer and the contractor (relating to contractor's work).

The other works and costs which are carried out by the contractor are given in appendix 1 to this Regulating document.

23. The cost of building and construction works and equipment costs, furniture and stock are determined in borders of the separate objects which are part of building, and other costs are determined by building in general. Allocation of separate objects as a part of building and determination of their borders is performed proceeding from condition of optimum structuring costs in estimate documentation on building for planning and the organization of construction.

Features of specialized types of construction are also considered in case of reference of these or those buildings and constructions to separate objects. Depending on type of buildings and specifics of construction as separate objects in case of creation of estimate documentation, are allocated:

in case of construction of industrial or construction engineering complexes – outside networks with the servicing and auxiliary constructions on them (water supply, the sewerage, central heating, gasification, power supply), sidings, intra quarter roads, all-areal works;

in case of specialized construction in the oil and gas industry – oil or gas well (operational or prospecting) with all the equipments relating to it, auxiliary constructions and works;

in case of specialized construction in coal and ore mining industry – passing and the equipment of excavations and other underground constructions of the mine;

in case of specialized construction in forestry and wood industry – the site on sorting or rafting of wood;

in case of specialized construction in melioration and water economy – the canal or the site of the canal with all constructions, the reclaimed land area with all constructions and work types;

in railway construction – road level or superficial structure of way within stage or separate Item, the communication line, the alarm system, centralization, blocking, power supply or overhead contact system on certain site;

in road construction – road level, road surfacing, water throughput pipes and other constructions within the section of the highway;

Warning!!!

This is not a full text of document! Document shown in Demo mode!

If you have active License, please Login, or get License for Full Access.

With Full access you can get: full text of document, original text of document in Russian, attachments (if exist) and see History and Statistics of your work.

Get License for Full Access Now

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.

Search engine created by SojuzPravoInform LLC. UI/UX design by Intelliants.