RESOLUTION OF THE CABINET OF MINISTERS OF THE REPUBLIC OF UZBEKISTAN

of March 31, 2018 No. 256

About approval of administrative regulations of rendering the state services in connection to engineering and communication networks

(as amended on 28-09-2022)

According to the Presidential decree of the Republic of Uzbekistan of December 12, 2017 No. UP-5278 "About Measures for Radical Reforming of National System of Rendering the State Services to the Population" and for the purpose of further enhancement of system of rendering the state services in connection to the engineering and communication Cabinet of Ministers networks decides:

1. Consider the main directions of further enhancement of system of rendering the state services in connection to engineering and communication networks (further - the state services):

cardinal reducing number of the procedures requiring direct participation of legal entities or physical persons when rendering the state services, and terms of their rendering;

cancellation of reclamation from legal entities and physical persons of the documents and data received from other state bodies and other organizations;

establishment of close interdepartmental electronic interaction between state bodies and other organizations for the purpose of non-admission of bureaucratic barriers and obstacles when rendering the state services;

ensuring efficiency, efficiency and transparency of activities of state bodies and other organizations, strengthening of their responsibility and performing discipline;

determination of the Single portal of interactive state services of the Republic of Uzbekistan (further - EPIGU) as the single information platform for rendering the state services.

2. Approve and enact since April 1, 2018:

Administrative regulations of rendering the state services in connection of legal entities and physical persons to gas networks according to appendix No. 2;

Administrative regulations of rendering the state services in connection of legal entities and physical persons to networks of heat supply according to appendix No. 3;

Administrative regulations of rendering the state services in connection of legal entities and physical persons to networks of water supply and water disposal according to appendix No. 4.

3. Determine that since April 1, 2018 legal entities and physical persons for receipt of the state services rendered according to the administrative regulations approved by this resolution address only through the Centers of the state services or EPIGU.

4. To provide to JSC Uzbekenergo, JSC Uztransgaz and the Ministry of housing-and-municipal servicing of the Republic of Uzbekistan and other state bodies participating when rendering the state services:

in ten-day time development and approval in coordination with the Ministry of Justice of the Republic of Uzbekistan of standard forms, forms of the documents and other acts necessary for rendering the state services;

together with the Ministry of development of information technologies and communications and the Agency of the state services under the Ministry of Justice of the Republic of Uzbekistan till April 1, 2018 connection of the territorial subdivisions, subordinated organizations and other structures participating when rendering the state services to EPIGU;

together with the Agency of the state services under the Ministry of Justice and Chamber of Commerce and Industry of the Republic of Uzbekistan the organization and carrying out during 2018 at least once in quarter of educational seminars with participation of employees of the Centers of the state services directed to increase in level of efficiency and effectiveness of practical application of the administrative regulations approved by this resolution.

5. To the ministry of development of information technologies and communications together with the Agency of the state services under the Ministry of Justice of the Republic of Uzbekistan till April 1, 2018 to implement on EPIGU:

the procedure of tracking of the course of consideration of appeals of legal entities and physical persons at each stage of rendering the state services;

the system providing placement of specifications of physical persons and legal entities on connection to engineering and communication networks for receipt of commercial offers of the project, construction and commissioning organizations.

6. To provide to the Ministry of Finance, the Central bank, the State Tax Committee, the Ministry of development of information technologies and communications of the Republic of Uzbekistan together with the state bodies and other organizations rendering the state services till April 1, 2018 acceptance of payments in electronic form in real time and accounting of the amounts of the state fees and charges paid for rendering the state services by means of Single billing system.

7. To the Ministry of Justice of the Republic of Uzbekistan:

establish constant control, including by means of EPIGU, behind activities of state bodies and other organizations for observance of established procedure of rendering the state services by them;

apply in accordance with the established procedure to officials of state bodies and other organizations administrative punishments for violation of requirements of the administrative regulations approved by this resolution for rendering the state services.

8. Recognize voided since April 1, 2018 some decisions of the Government of the Republic of Uzbekistan according to appendix No. 5.

9. To the ministries and departments to bring the regulatory legal acts adopted by them into accord with this resolution in a month.

10. Determine that heads of the state bodies and other organizations rendering the state services of the Ministry of Justice of the Republic of Uzbekistan bear the personal responsibility for timely, full and high-quality implementation of the tasks provided by this resolution.

11. To impose control of execution of this resolution on the First Deputy Prime Minister of the Republic of Uzbekistan - the chairman of the board of JSC Uzbekiston temir yullari A. Zh. Ramatov, the deputy prime minister of the Republic of Uzbekistan - the chairman of the board of JSC Uzbekneftegaz A. S. Sultanov and the Minister of Justice of the Republic of Uzbekistan R. K. Davletov.

Prime Minister of the Republic of Uzbekistan

Abdullah Aripov

Appendix No. 1

to the Resolution of the Cabinet of Ministers of the Republic of Uzbekistan of March 31, 2018 No. 256

Administrative regulations of rendering the state services in connection of legal entities and physical persons to power networks

Voided according to the Resolution of the Cabinet of Ministers of the Republic of Uzbekistan of 31.08.2021 No. 555

Appendix No. 2

to the Resolution of the Cabinet of Ministers of the Republic of Uzbekistan of March 31, 2018 No. 256

Administrative regulations of rendering the state services in connection of legal entities and physical persons to gas networks

Chapter 1. General provisions

1. These Regulations determine procedure for connection of legal entities and physical persons (further - consumers) to gas networks.

2. Actions of these Regulations extend on new and additional gas-using the equipment of consumers, connected to gas networks, and also in case of change of points of connection, the types of productive activity which entailed project change of gas supply and amounts of consumption of natural gas.

Requirements of these Regulations do not extend to connection of consumers to gas networks pressure of more 1,2 of MPa.

3. Supply of natural gas without the conclusion of the agreement of gas supply is forbidden.

4. The procedure of connection of consumers to gas networks provides:

development of specifications;

development and coordination of the project of gas supply;

implementation of installation and construction works;

sealing of the metering device of natural gas;

issue of permissions to implementation of balancing and commissioning, operation seasonally it is also long the working gas-consuming objects of gas economy of the legal entities using 100 000 and more cubic meters of natural gas a year on one device in fuel quality;

conclusion of the agreement of gas supply;

implementation of commissioning;

supply of natural gas.

5. When implementing the procedure of connection of consumers to gas networks:

a) the territorial gas supplying company (further - TGP):

develops specifications;

performs project, construction and commissioning (in case of interest of the consumer);

within consideration of projects of gas supply, including consideration and coordination of the design estimates of buildings under construction, constructions and other objects, considers and approves them on compliance to specifications, in case of availability of the project organization for project development;

participates in sealing of the metering device of natural gas;

signs the agreement of gas supply;

performs supply of natural gas;

b) the project, construction and commissioning organizations perform project, construction and commissioning (in case of interest of the consumer);

c) The bureau of forced execution under the Prosecutor General's Office of the Republic of Uzbekistan (further - Bureau) participates in sealing of the metering device of natural gas;

d) The state inspectorate for supervision of geological studying of subsoil, safe operation in the industry, mining and the household sector under the Cabinet of Ministers of the Republic of Uzbekistan (further - GI "Sanoatgeokontekhnazorat") issues permissions to implementation of balancing and commissioning, operation seasonally and is long the working gas-consuming objects of gas economy of the legal entities using 100 000 and more cubic meters of natural gas a year on one device in fuel quality.

6. Exchange of information between centers of the state services, Bureau, TGP, the project, construction and commissioning organizations is performed only by means of interdepartmental electronic interaction with obligatory application of the digital signature (further - the EDS).

7. Connection of consumers to gas networks is performed according to the scheme according to appendix No. 1 to these Regulations.

Chapter 2. Procedure for rendering the state service

§ 1. Forming and sending addresses

8. Consumers for connection to gas networks address to the Centers of the state services in attendance procedure or are registered on the Single portal of interactive state services of the Republic of Uzbekistan (further - EPIGU) for receipt of the state service in electronic form.

9. In case of the address in attendance procedure the employee of the Center of the state services on behalf of the consumer, and in case of the address through EPIGU the consumer independently fills in in electronic form the questionnaire for receipt of the state service in form according to appendix No. 2 to these Regulations.

In need of the questionnaire data on availability of consent of asset holders of gas communications to which connection is provided are specified.

Demand from consumers of provision of the data which are not specified in this Item, and also other documents it is strictly forbidden.

10. After registration and entering of necessary data into the questionnaire the consumer checks correctness of data and certifies the questionnaire by appropriate means of identification of the signature (dactyloscopy, the digital signature, Mobile-ID, etc.).

In case of the address of the consumer through EPIGU assurance of the questionnaire of the EDS is not required.

11. For rendering the state services collection in the amount of 10% of basic settlement size, except as specified coordination of the project of gas supply along with consideration and coordination of the design estimates of buildings under construction, constructions and other objects is levied.

In case of the address for rendering the state service through EPIGU collection is levied in the amount of 90 percent from the amount specified in paragraph one of this Item.

In case of connection of physical persons to gas networks concerning persons registered in the information system "Unified Register of Social Protection", and also persons with disability of I and II groups the discount in the amount of 50 percent from the collection established by paragraph one of this Item is applied.

Payment confirmation of collection for rendering the state service is performed by means of information and communication systems.

12. The amounts of charges are distributed in the following procedure:

a) in case of the appeal to the Centers of the state services in attendance procedure:

20 percent are enlisted on personal account of off-budget fund of the Agency of the state services under the Ministry of Justice of the Republic of Uzbekistan;

the remained means completely are enlisted on bank accounts TGP;

b) in case of the address through EPIGU:

10 percent are enlisted on personal account of off-budget fund of the Agency of the state services under the Ministry of Justice of the Republic of Uzbekistan;

 Are enlisted by 11,25 of percent into the account SUE Project Management Center of the Electronic Government and Digital Economy under the National Agency of Project Management in case of the President of the Republic of Uzbekistan;

the remained means completely are enlisted on bank accounts TGP.

13. Instruction in the questionnaire of false information, and also failure to pay collection for rendering the state service are the bases for refusal in provision of the state service.

The refusal in provision of the state service in other bases is strictly forbidden.

14. The consumer has the right to refuse receipt of the state service at any stage of its rendering.

In case of refusal the consumer from receipt of the state service its questionnaire is left without consideration. At the same time the fee paid amount is not subject to return.

15. In case of the address in attendance procedure the Centers of the state services within one hour from the moment of filling of the questionnaire send it to TGP for development of specifications.

In case of the address through EPIGU the questionnaire automatically goes to TGP for development of specifications.

§ 2. Development and issue of specifications, and also submission of commercial offers and draft agreements

16. TGP within three working days from the date of receipt of the questionnaire develops and sends to the Center of the state services (in case of the address in attendance procedure) or to the consumer through EPIGU (in case of the address in electronic form) specifications in electronic form or refuses their development.

TGP also has the right to direct the commercial offers and draft agreements to implementation project, construction and commissioning.

The center of the state services within one hour after receipt of specifications, and also commercial offers and draft agreements on implementation project, construction and commissioning of TGP issues them to the consumer by putting down of the seal on specifications in case of the attendance address.

17. The basis for refusal in development of specifications is absence in the territory where object of the consumer, gas distribution network which capacity allows TGP to provide supply of natural gas to the consumer is located.

Is strictly forbidden to refuse development of specifications on other bases.

18. Developed specifications with appendix of contact information of the consumer are placed on EPIGU for acquaintance by the project, construction and commissioning organizations for the purpose of further provision of the commercial offers and draft agreements on implementation project, construction and commissioning.

§ 3. Connection of consumers to gas networks

19. For gas supply project development consumers have the right to sign contracts for carrying out project works with TGP or other project organizations.

20. Project works are carried out in the terms established in contracts for carrying out project works.

21. After accomplishment of project works the project organization fills in on EPIGU the questionnaire in form according to appendix No. 3 to these Regulations and certifies, except as specified coordination of the project of gas supply along with consideration and coordination of the design estimates of buildings under construction, constructions and other objects it the EDS.

The project of gas supply in electronic form is attached to the questionnaire.

It is strictly forbidden demand from the project organization of provision of the documents and data which are not specified in this Item.

The questionnaire automatically goes to TGP for review of the project of gas supply.

22. If developer of the project of gas supply is TGP, coordination of the project of gas supply is not required.

23. TGP within three working days after receipt of the questionnaire in form according to appendix No. 3 to these Regulations approves the project of gas supply or refuses its coordination.

Coordination of the project of gas supply is made by its confirmation by the EDS of TGP.

24. The bases for refusal in coordination of the project of gas supply are variations of the project of gas supply from requirements of specifications.

Is strictly forbidden to refuse coordination of the project of gas supply on other bases.

In case of elimination by the project organization of the reasons which served the basis for refusal in coordination of the project of gas supply, repeated coordination is performed in time, not exceeding one working day from the date of receipt of the repeated questionnaire.

In case of de novo review of the project of gas supply reduction from TGP of the reasons which are earlier not stated in the refusal bases, except for reductions of the causes of failure connected with the data certifying elimination of earlier specified reasons is not allowed.

25. The agreed project of gas supply in electronic form in day of its coordination goes TGP of the project organization, in cases of coordination of the project of gas supply along with consideration and coordination of the design estimates of buildings under construction, constructions and objects, goes to the project organization through the Center of the state services (in case of the address in attendance procedure) or through EPIGU.

26. For implementation of installation and construction works on connection to gas networks consumers have the right to sign the relevant contracts with TGP or other construction organizations.

27. Installation and construction works are carried out in the terms established in contracts for carrying out installation and construction works.

Warning!!!

This is not a full text of document! Document shown in Demo mode!

If you have active License, please Login, or get License for Full Access.

With Full access you can get: full text of document, original text of document in Russian, attachments (if exist) and see History and Statistics of your work.

Get License for Full Access Now

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.

Search engine created by SoyuzPravoInform LLC.