Document from CIS Legislation database © 2003-2019 SojuzPravoInform LLC

ORDER OF THE MINISTER OF ENERGY OF THE REPUBLIC OF KAZAKHSTAN

of February 20, 2015 No. 110

About approval of Rules of carrying out the tender for construction of the generating installations which are again put into operation

According to the subitem 11) article 5 of the Law of the Republic of Kazakhstan of July 9, 2004 "About power industry" PRIKAZYVAYU:

1. Approve the enclosed Rules of carrying out the tender for construction of the generating installations which are again put into operation.

2. To provide to department of power industry of the Department of Energy of the Republic of Kazakhstan in the procedure established by the legislation of the Republic of Kazakhstan:

1) state registration of this order in the Ministry of Justice of the Republic of Kazakhstan;

2) the direction on official publication of this order within ten calendar days after its state registration in the Ministry of Justice of the Republic of Kazakhstan in periodic printing editions and in information system of law of Ad_let;

3) placement of this order on official Internet resource of the Department of Energy of the Republic of Kazakhstan and on the intranet portal of state bodies;

4) within ten working days after state registration of this order in the Ministry of Justice of the Republic of Kazakhstan submission to Department of legal service of the Department of Energy of the Republic of Kazakhstan of data on execution of the actions provided by subitems 2) and 3) of this Item.

3. To impose control of execution of this order on the supervising vice-Minister of Energy of the Republic of Kazakhstan.

4. This order becomes effective after ten calendar days after day of its first official publication.

Minister

B. School student

Approved by the Order of the Minister of Energy of the Republic of Kazakhstan of February 20, 2015 No. 110

Rules of carrying out the tender for construction of the generating installations which are again put into operation

1. General provisions

1. These rules of carrying out the tender for construction of the generating installations which are again put into operation (further - Rules) are developed according to the subitem 11) of article 5 of the Law of the Republic of Kazakhstan of July 9, 2004 "About power industry" (further - the Law) and determine procedure for carrying out the tender for construction of the generating installations which are again put into operation.

2. In these rules the following concepts are used:

1) the application for participation - the request submitted by the participant of the tender to the organizer of the tender and which is drawn up according to requirements of the organizer of the tender and these rules with appendix of set of the documents specified in Item 7 of these rules;

2) the participant of the tender - potential investors who declared the participation in the tender for construction of the generating installations which are again put into operation according to these rules;

3) the organizer of the tender - the authorized body performing management in the field of power industry;

4) the tender commission - the commission created by the organizer of the tender for summing up the tender;

5) the tender documentation - the packet of the tender documentation on construction of the generating installations which are again put into operation containing the description and required technical, quality and operational characteristics of the generating installations which are again put into operation, and the draft agreement on construction of the generating installations which are again put into operation based on the standard agreement on construction of the generating installations which are again put into operation;

6) the tender - the request submitted by the participant of the tender to the organizer of the tender with appendix of technical and economic calculation;

7) technical and economic calculation - the calculation of construction cost constituted by the participant of the tender on the basis of the description and required technical, quality and operational characteristics of the generating installations which are again put into operation.

Other concepts and determinations used in these rules are applied according to the legislation of the Republic of Kazakhstan in the field of power industry.

2. Procedure for carrying out the tender for construction of the generating installations which are again put into operation

3. For covering of the predicted deficit of electric power the organizer of the tender holds the tender for construction of the generating installations which are again put into operation (further - the tender), with indication of terms of its carrying out.

4. For carrying out the tender the organizer of the tender creates the tender commission which structure and provision approves by the order.

5. The organizer of the tender develops and approves the tender documentation which contains:

1) the description and required technical, quality and operational characteristics of the generating installations which are again put into operation;

2) the draft agreement on construction of the generating installations which are again put into operation.

Full text available with active License only!

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 38000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.

Search engine created by SojuzPravoInform LLC. UI/UX design by Intelliants.