ORDER OF THE GOVERNMENT OF THE RUSSIAN FEDERATION

of April 26, 2019 No. 509

About approval of requirements to structure and contents of the project of the organization of works on asset demolition of capital construction

According to part 5 of article 55.30 of the Town-planning code of the Russian Federation the Government of the Russian Federation decides:

Approve the enclosed requirements to structure and contents of the project of the organization of works on asset demolition of capital construction.

Russian Prime Minister

D. Medvedev

Approved by the Order of the Government of the Russian Federation of April 26, 2019 No. 509

Requirements to structure and contents of the project of the organization of works on asset demolition of capital construction

1. This document determines requirements to structure and contents of the project of the organization of works on asset demolition of capital construction.

2. This document is not applied in the cases provided by parts 3 and 8 of article 55.30 of the Town-planning code of the Russian Federation.

3. The project of the organization of works on asset demolition of capital construction (further - the project) consists of text and graphical parts.

4. Text part of the project contains:

a) the basis for project development (the decision of the owner of capital construction project, or owners of rooms in it, or the builder, the judgment or local government body, the agreement on indemnification, the rights of the owner of capital construction project caused by restriction or owners of rooms in it in connection with establishment of zone with special conditions of use of the territory);

b) the type determined according to the Regulations on structure of Sections of the project documentation and requirements to their content approved by the order of the Government of the Russian Federation of February 16, 2008 No. 87 "About structure of Sections of the project documentation and requirements to their content" and the description of the capital construction project which is subject to demolition with indication of key parameters, constructive and technical characteristics;

c) data on the project documentation of the capital construction project which is subject to demolition (in the presence);

d) data on the conclusion of the state or non-state examination of the project documentation of the capital construction project which is subject to demolition (in the presence);

e) data on results and materials of inspection of the capital construction project which is subject to demolition;

e) the list of actions for removal from operation of the capital construction project which is subject to demolition (if conclusion of capital construction project from operation is not performed before its demolition in accordance with the legislation of the Russian Federation);

g) the list of the dismantled processing equipment, overall dimensions and masses, conditions of dismantle and transportation (in the presence of such equipment);

h) data on conditions of disconnection of capital construction project from networks of engineering facilities in accordance with the terms of disconnection of the capital construction project which is subject to demolition from networks of engineering facilities, the issued organizations performing operation of networks of engineering facilities;

i) the list of actions for ensuring protection of the taken-down capital construction project against penetration of strangers and animals into the danger area and in object, and also protection of green plantings;

j) the description and reasons for the accepted method of asset demolition of capital construction;

k) calculation of duration of works on asset demolition of capital construction depending on technology of their accomplishment (if such need is determined by the owner of capital construction project, or owners of rooms in it, or the builder);

l) calculations and reasons for the sizes of zones of disorder and danger areas depending on the accepted demolition method;

m) assessment of probability of damage in case of asset demolition of capital construction of the operating networks of engineering facilities;

o) the description and reasons for methods of protection and protective devices of the operating networks of engineering facilities approved with owners of such networks;

o) the description and reasons for decisions on safe operation on asset demolition of capital construction;

Full text available with active License only!

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 38000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.

Search engine created by SojuzPravoInform LLC. UI/UX design by Intelliants.