ORDER OF THE MINISTER OF ENERGY OF THE REPUBLIC OF KAZAKHSTAN

of February 11, 2015 No. 73

About approval of Rules of the organization of maintenance and repair of the equipment, buildings and constructions of power plants, thermal and power networks

(In edition of Orders of the Minister of Energy of the Republic of 25.12.2017 No. 471, 07.03.2019 No. 77)

According to the subitem 36) article 5 of the Law of the Republic of Kazakhstan "About power industry" of July 9, 2004 PRIKAZYVAYU:

1. Approve the enclosed Rules of the organization of maintenance and repair of the equipment, buildings and constructions of power plants, thermal and power networks.

2. To provide to department of power industry of the Department of Energy of the Republic of Kazakhstan in the procedure established by the legislation of the Republic of Kazakhstan:

1) state registration of this order in the Ministry of Justice of the Republic of Kazakhstan;

2) the direction on official publication of this order within ten calendar days after its state registration in the Ministry of Justice of the Republic of Kazakhstan in periodic printing editions and in information system of law of Ad_let;

3) placement of this order on official Internet resource of the Department of Energy of the Republic of Kazakhstan and on the intranet portal of state bodies;

4) within ten working days after state registration of this order in the Ministry of Justice of the Republic of Kazakhstan submission to Department of legal service of the Department of Energy of the Republic of Kazakhstan of data on execution of the actions provided by subitems 2) and 3) of this Item.

3. To impose control of execution of this order on the supervising vice-Minister of Energy of the Republic of Kazakhstan.

4. This order becomes effective after ten calendar days after day of its official publication.

Minister

B. School student

Approved by the Order of the Minister of Energy of the Republic of Kazakhstan of February 11, 2015 No. 73

Rules of the organization of maintenance and repair of the equipment, buildings and constructions of power plants, thermal and power networks

1. General provisions

1. These rules of the organization of maintenance and repair of the equipment, buildings and constructions of power plants, thermal and power networks (further - Rules) are developed according to the subitem 36) of article 5 of the Law of the Republic of Kazakhstan of July 9, 2004 "About power industry" and determine procedure for the organization of maintenance and repair of the equipment, buildings and constructions of power plants, thermal and power networks of the power making and power transferring organizations.

2. In these rules the following basic concepts are applied:

1) bypass - bypass the heat conductor which is applied to transportation of the heat carrier parallel to the locking and regulating armature;

2) the equipment - set of mechanisms, machines, devices, the devices combined by certain technology scheme;

3) serviceable condition - condition of the equipment, buildings and (or) constructions in case of which they conform to all requirements of normative and technical and (or) design (project) documentation;

4) repair - complex of actions for recovery of operating state and (or) serviceable condition of the equipment, buildings and constructions and to recovery of resources of their components;

5) operating state - the condition of the equipment, buildings and (or) constructions in case of which values of all parameters characterizing capability to perform the set functions, conform to requirements of normative and technical and (or) design (project) documentation;

6) maintenance - complex of actions or action for maintenance of operating state and (or) serviceable condition of the equipment, buildings and constructions in case of proper use, storage and (or) transportation without their conclusion in repair;

7) stop - planned or unplanned conclusion from work of the generating installations.

3. These rules do not extend to the organization of emergency repair of the equipment, buildings and constructions of the power making and power transferring organizations.

4. The power making and power transferring organizations on permanent basis provide serviceable condition of the equipment, the buildings and constructions used, respectively, for production and (or) transfer of electrical and (or) heat energy by the organization and carrying out complex of works which includes:

1) maintenance of the equipment, buildings and constructions of power plants, thermal and power networks;

2) repair of the equipment, buildings and constructions of power plants, thermal and power networks.

2. Procedure for the organization of maintenance of the equipment, buildings and constructions of power plants, thermal and power networks

5. Frequency and amount of maintenance, and also structure of works on maintenance of the equipment, buildings and constructions of power plants, thermal and power networks are established by the power making and power transferring organizations independently taking into account instructions of the producer for operation and the actual service conditions.

Full text available with active License only!

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 38000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.

Search engine created by SojuzPravoInform LLC. UI/UX design by Intelliants.